Company Logo

PM 1 CHECKLIST

Shift Shift Cycle Date Vehicle Readiness
BRAVO MFS Night May 14, 2026 Operation

VEHICLE CONDITION

Equipment Status Equipment Status
Radiator Water Level Maximum Engine Oil Level Maximum
Wiper Water Level Maximum Battery Condition Good
Tyre Condition Good Overall Light Condition Function
Temperature Gauge Function Foam Level Gauge Function
Foam Hard Suction Function
Double Signal Light Function Siren and Horn Function
PA System Function
Route Running Test Good Brake Test Good
Reverse Audible Alarm Function Electrical Cable Function
Hidraulic Jack Function Air Brake Cable Function
Fuel Level Full Mileage 10862 KM
Mileage [5714] KM

FOAM TRAILER

Equipment Status Equipment Status
Plate Light Pass Clean Lenses and Reflector Yes
Inspect Brake Hose Connector Pass Check Brake Hose Connector Pass
Drain Water Drain Line Pass Brake Pivot Grease Pass
Sliding Grease Pass Fifth Wheel Plate Grease Pass
Kingpin Grease Pass Tyre Pressure Pass
Air Line 1 and Seal Connector Pass Air Line 2 and Seal Connector Pass
Electrical Line Connector Pass

MONTHLY

Equipment Status Equipment Status
Grease Suspension Slipper Ends Pass Check Suspension Bolts Pass
Check Wheel Nuts Pass

SEMI ANNUAL

Equipment Status Equipment Status
Grease Landing Gear 1 Yes Grease Landing Gear 2 Yes
Grease Wheel Hub Bearing Yes

LOCKER 1

Equipment Status Equipment Status
Oil Can 1 Unit Hazard Warning Triangle 3 Unit
Grease Gun 1 Unit

LOCKER 2

Equipment Status Equipment Status
Foam Pump 1 Unit Foam Level Gauge 1 Unit

LOCKER 3

Equipment Status Equipment Status
Heavy Duty Jack 1 Unit

FOAM TRAILER COUPLING

Equipment Status Equipment Status
Single Locking Pass Double Locking Pass
Secure Padlock Pin Pass Cable Connection Pass
Landing Gear Jacking Up Pass

TRUCK & TRAILER INSPECTION (15 POINT)

Equipment Status Equipment Status
Bumper Pass Engine Pass
Tires Pass Floor (Truck) Pass
Fuel Tank Pass Cab Pass
Air Tank Pass Drive Shaft Pass
Fifth Wheel Pass Outside/Under Carriage Pass
Outside/Inside Door Pass Floor (Trailer) Pass
Side Walls Pass Front Wall Pass
Ceiling/Roof Pass

OUT OF OPERATION

Remarks

Consent

I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.

Verification

Join Inspection by : Ahmad Zul Fahmi Bin Abbas Check by : Mohammad Afiq Shahrom Verify by : SFM Syed Shahrul Bin Syed Yusof
shahrul