FT 2 CHECKLIST
| Shift |
Shift Cycle |
Date |
Vehicle Readiness |
| CHARLIE MFS |
Day |
April 26, 2025 |
Operation |
VEHICLE CONDITION
| Equipment |
Status |
Equipment |
Status |
| Radiator Water Level |
Maximum |
Engine Oil Level |
Maximum |
| Wiper Water Level |
Maximum |
Battery Condition |
Good |
| Tyre Condition |
Good |
Overall Light Condition |
Function |
| Beacon Light Bar |
Function |
Locker Light |
Function |
| Back Spot Light |
Function |
Scene/Strobe Light |
Function |
| Arrow Bar |
Function |
Siren and Horn |
Function |
| PA System |
Function |
Mobile Radio Strength |
5 |
| Route Running Test |
Good |
Brake Test |
Good |
| Reverse Audible Alarm |
Function |
Reverse Camera |
Function |
| Foam Pump Condition |
Function |
Foam Level |
100% |
| Road Tax |
June 25, 2025 |
Fuel Level |
Above 80 % |
| Mileage |
35587 KM |
|
|
CABIN CREW
| Equipment |
Status |
Equipment |
Status |
| Fire Extinguisher 3kg DP |
1 Unit |
Winch Line Set |
1 Unit |
| Escape Hood PARAT |
2 Unit |
|
|
CABIN COMPARTMENT - RIGHT
| Equipment |
Status |
Equipment |
Status |
| Heavy Duty Jack |
1 Unit |
Inflation Hose |
1 Unit |
LOCKER 1
| Equipment |
Status |
Equipment |
Status |
| Lifeline |
2 Unit |
Middle Foam Expansion Tip |
1 Unit |
| Face Mask with Cover |
2 Unit |
SCBA Set 1 |
270 bar |
| SCBA Set 2 |
270 bar |
|
|
LOCKER 2
| Equipment |
Status |
Equipment |
Status |
| Rubber Twin Hose Ramp |
4 Unit |
Aluminum Hose Ramp |
4 Unit |
LOCKER 3
| Equipment |
Status |
Equipment |
Status |
| Mercury Master Monitor 1000 gpm |
2 Unit |
|
|
LOCKER 4
| Equipment |
Status |
Equipment |
Status |
| 2.5" Foam Nozzle |
3 Unit |
1.5" Selective Nozzle 125 gpm |
3 Unit |
| 1.5" Selective Nozzle 200 gpm |
3 Unit |
2.5" Hose Instantaneous |
2 Unit |
| 1.5" Hose Instantaneous |
2 Unit |
2.5" Hose Screw Type |
4 Unit |
| 1.5" Hose Screw Type |
6 Unit |
Dividing Breeching |
2 Unit |
| Snagger Tools |
2 Unit |
|
|
LOCKER 5
| Equipment |
Status |
Equipment |
Status |
| Hose 5" (Storz Coupling) |
5 Unit |
|
|
LOCKER 6
| Equipment |
Status |
Equipment |
Status |
| Hose 2.5" (Screw Type) |
6 Unit |
3" Delivery Hose |
6 Unit |
| 1.5" Turbojet Foam Tip Nozzle |
2 Unit |
2.5" Turbojet Foam Tip Nozzle |
2 Unit |
LOCKER 7
| Equipment |
Status |
Equipment |
Status |
| Mercury Monitor 500 gpm |
3 Unit |
|
|
LOCKER 8
| Equipment |
Status |
Equipment |
Status |
| 5" Wrenches |
2 Unit |
2.5" Wrenches |
2 Unit |
| Wrenches Style 19 |
2 Unit |
Coupling Adaptor |
3 Unit |
| Metal Stariner |
1 Unit |
|
|
LOCKER 9
| Equipment |
Status |
Equipment |
Status |
| SCBA Spare Cylinder |
4 Unit |
Middle Foam Expansion Tip |
1 Unit |
LOCKER 10
| Equipment |
Status |
Equipment |
Status |
| Face Mask with Cover |
1 Unit |
SCBA Set 1 |
270 bar |
CABIN COMPARTMENT - LEFT
| Equipment |
Status |
Equipment |
Status |
| Standard Vehicle Tool Set |
1 Unit |
Red Hazard Warning Trialgle |
1 Unit |
| T handle Wrenches 11mm |
1 Unit |
|
|
TOP
| Equipment |
Status |
Equipment |
Status |
| Hard Suction Hose 6" |
4 Unit |
|
|
OUT OF OPERATION
Consent
I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.
Verification
| Join Inspection by : Mohd Hazeem Bin Abdul Halim |
Check by : Ahmad Aizat Bin Samad |
Verify by : SFM Sharul Azuary Bin Mohamed Isa |
| Hazeem |
Aizat |
sharulazuary |