FT 1 CHECKLIST
Shift |
Shift Cycle |
Date |
Vehicle Readiness |
BRAVO MFS |
Night |
January 12, 2025 |
Operation |
VEHICLE CONDITION
Equipment |
Status |
Equipment |
Status |
Radiator Water Level |
Maximum |
Engine Oil Level |
Maximum |
Wiper Water Level |
Maximum |
Battery Condition |
Good |
Tyre Condition |
Good |
Overall Light Condition |
Function |
Beacon Light Bar |
Function |
Locker Light |
Function |
Back Spot Light |
Function |
Scene/Strobe Light |
Function |
Arrow Bar |
Function |
Siren and Horn |
Function |
PA System |
Function |
Mobile Radio Strength |
5 |
Route Running Test |
Good |
Brake Test |
Good |
Reverse Audible Alarm |
Function |
Reverse Camera |
Function |
Foam Pump Condition |
Function |
Foam Level |
100% |
Road Tax |
June 25, 2025 |
Fuel Level |
Above 80 % |
Mileage |
36127 KM |
|
|
CABIN CREW
Equipment |
Status |
Equipment |
Status |
Fire Extinguisher 3kg DP |
1 Unit |
Winch Line Set |
2 Unit |
First Aid Box |
1 Unit |
Escape Hood PARAT |
2 Unit |
CABIN COMPARTMENT - RIGHT
Equipment |
Status |
Equipment |
Status |
Heavy Duty Jack |
1 Unit |
Inflation Hose |
1 Unit |
LOCKER 1
Equipment |
Status |
Equipment |
Status |
Winch Accesories (Chain & Shaker) |
1 Bag |
Short Hose 2.5" (Screw Type) |
6 Unit |
LOCKER 2
Equipment |
Status |
Equipment |
Status |
Rubber Twin Hose Ramp |
4 Unit |
Aluminum Hose Ramp |
4 Unit |
LOCKER 3
Equipment |
Status |
Equipment |
Status |
Mercury Master Monitor 1000 gpm |
2 Unit |
|
|
LOCKER 4
Equipment |
Status |
Equipment |
Status |
Fire Extinguisher CO2 6kg |
2 Unit |
Oil Spill Trousers |
1 Unit |
Middle Expansion Foam |
2 Unit |
Turbojet Foam Tip Nozzle 1.5" |
2 Unit |
Turbojet Foam Tip Nozzle 2.5" |
2 Unit |
Aluminized Suit Shirt |
1 Unit |
Aluminized Suit Pant |
1 Unit |
Aluminized Suit Helmet |
1 Unit |
Aluminized Suit Glove |
1 Unit |
Hose 1.5" (Screw Type) |
4 Unit |
LOCKER 5
Equipment |
Status |
Equipment |
Status |
Hose 5" (Storz Coupling) |
5 Unit |
|
|
LOCKER 6
Equipment |
Status |
Equipment |
Status |
Hose 2.5" (Screw Type) |
5 Unit |
Hose 2.5" (Instantaneous) |
2 Unit |
Foam Nozzle |
3 Unit |
Dividing Breeching |
2 Unit |
LOCKER 7
Equipment |
Status |
Equipment |
Status |
Nozzle 1.5" 125 gpm |
3 Unit |
/Nozzle 1.5" 250 gpm |
2 Unit |
Water Curtain |
2 Unit |
Mercury Monitor 500 gpm |
2 Unit |
LOCKER 8
Equipment |
Status |
Equipment |
Status |
Coupling Opener |
1 Unit |
Wrenches Style 19 |
1 Unit |
Wrenches Style 10 |
2 Unit |
Metal Strainer |
2 Unit |
Wrenches 5" |
1 Unit |
Snagger Tool |
2 Unit |
LOCKER 9
Equipment |
Status |
Equipment |
Status |
Face Mask with Cover |
4 Unit |
SCBA Set 1 |
280 Bar |
SCBA Set 2 |
300 Bar |
SCBA Set 3 |
310 Bar |
SCBA Set 4 |
270 Bar |
|
|
CABIN COMPARTMENT - LEFT
Equipment |
Status |
Equipment |
Status |
Standard Vehicle Tool Set |
1 Unit |
Red Hazard Warning Trialgle |
3 Unit |
Spare Bulb |
1 Box |
|
|
TOP
Equipment |
Status |
Equipment |
Status |
Hard Suction Hose 6" |
4 Unit |
|
|
OUT OF OPERATION
Consent
I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.
Verification
Join Inspection by : Khairuddin Bin Masdar |
Check by : Muhammad Iszuan Bin Suhadi |
Verify by : SFM Mohamad Imran Bin Jamaludin |
khairuddin |
iszuan |
 |