RIV 3 CHECKLIST
| Shift |
Shift Cycle |
Date |
Vehicle Readiness |
| DELTA SFS |
Night |
March 5, 2025 |
Operation |
VEHICLE CONDITION
| Equipment |
Status |
Equipment |
Status |
| Radiator Water Level |
Maximum |
Engine Oil Level |
Maximum |
| Wiper Water Level |
Maximum |
Battery Condition |
Good |
| Tyre Condition |
Good |
Overall Light Condition |
Function |
| Beacon Light Bar |
Function |
Siren and Horn |
Function |
| PA System |
Function |
Mobile Radio Strength |
5 |
| Route Running Test |
Good |
Brake Test |
Good |
| Reverse Audible Alarm |
Function |
Reverse Camera |
Function |
| Road Tax |
January 8, 2026 |
Fuel Level |
Full |
| Mileage |
67774 KM |
|
|
CABIN CREW
| Equipment |
Status |
Equipment |
Status |
| Hydraulic Jack |
N/A |
Winch (XD9000) |
1 Unit |
| Remote Winch |
1 Unit |
First Aid Kit |
N/A |
| Marshall Vest |
3 unit |
Safety Vest |
N/A |
| TIC |
1 Unit |
Torch Light |
4 unit |
| PFD |
N/A |
Parat Escape Hood |
2 Unit |
| Gas Detector |
2 Unit |
Oil Spill Trousers |
N/A |
| Rescue Helmet |
1 Unit |
Rosenbauer Light |
1 Unit |
| SCBA Set 1 |
290 |
|
|
BACK COMPARTMENT
| Equipment |
Status |
Equipment |
Status |
| Traffic Cone |
4 Unit |
SCBA Cylinder |
1 unit |
| Darley BB069 LED Beacon |
2 Unit |
Fireman Exe Darley |
N/A |
| Telescopic Light Mast |
1 Unit |
Green Flare Light |
4 Unit |
| Wheel Choke |
N/A |
Tool Case Carrying Bag |
N/A |
Out Of Operation/Replacement
Consent
I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.
Verification
| Join Inspection by : |
Check by : FM Wan Noor Hisham Bin Md Sharif |
Verify by : Senior Fire Marshall |
|
wan |
|