Company Logo

RIV 2 CHECKLIST

Shift Shift Cycle Date Vehicle Readiness
BRAVO MFS Day April 2, 2026 Operation

VEHICLE CONDITION

Equipment Status Equipment Status
Wiper Water Level Maximum Battery Condition Good
Tyre Condition Good Overall Light Condition Function
Beacon Light Bar Function Siren and Horn Function
Radiator Water Level Maximum Engine Oil Level Maximum
PA System Function Mobile Radio Strength 5
Route Running Test Good Brake Test Good
Reverse Audible Alarm Function Reverse Camera Function
Road Tax January 12, 2027 Fuel Level Full
Mileage 70375 KM

CABIN CREW

Equipment Status Equipment Status
Binocular 1 Unit Winch (XD9000) 1 Unit
Remote Winch 1 Unit First Aid Kit 1 BOX
Marshall Vest 2 Unit Portable Light 1 Unit
TIC Flir Under maintenance Gas Detector Honeywell 1 Unit
TIC Drager 1 Unit Dashcam 1 Unit
Barricade 3 Unit Escape Hood Parat 2 Unit
Torch Light 1 Unit Nikon Forestry Range Finder 1 Unit
Weather Station (Monitor) 1 Unit Weather Station (Transmitter) 1 Unit
Cervical Collar 1 Unit SCBA Set 1 260 Bar
SCBA Set 2 290 Bar

BACK COMPARTMENT

Equipment Status Equipment Status
Dry Chemical Fire Extinguisher (2kg) 1 Unit Portable Telescopic Light Mast 1 Unit
Life Jacket (PFD) 5 Unit PRT Kit 1 Unit
Facemask 2 Unit Bolt Cutter 1 Unit
Holligan Bar 1 Unit

HIGH PRESSURE LIFTING BAG

Equipment Status Equipment Status
HLB20 High Pressure Lifting Bag 2 Unit AH10YU Air Hose (Yellow) 1 Unit
AH10BU Air Hose (Blue) 1 Unit AH10RU Air Hose (Red) 1 Unit
Double Control Unit with Safety Valve 1 Unit PRV823AU Pressure Reducer 1 Unit
Shut Off Valve with Safety Valve 3 Unit Tool Case Carrying Bag 1 Unit

HYDRAUIC TOOL SET

Equipment Status Equipment Status
CU4035C NCT Cutter 1 Unit CT4150C Combination Tools 1 Unit
SMC4006C Special Material Cutter 1 Unit TR4340C Telescopic Ram 1 Unit
Extension Pipe 250mm 1 Unit Extension Pipe 450mm 1 Unit
HRS22NCT Ram Support 1 Unit C05GU Core Hose (Orange) 1 Unit
C10OU Core Hose (Orange) 1 Unit PA18H2C Hand Pump 1 Unit
DPU311PC Petrol Duo Pump 1 Unit

Consent

I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.

Verification

Join Inspection by : Mohd Fakhrullah Bin Mohd Hatta Check by : FM Mohamad Firdaus bin Osman Verify by : SFM Sharul Azuary Bin Mohamed Isa
Fakrullah Aus sharulazuary