Company Logo

RIV 2 CHECKLIST

Shift Shift Cycle Date Vehicle Readiness
CHARLIE MFS Night May 14, 2025 Out of Operation

VEHICLE CONDITION

Equipment Status Equipment Status
Wiper Water Level Battery Condition
Tyre Condition Overall Light Condition
Beacon Light Bar Siren and Horn
Radiator Water Level Engine Oil Level
PA System Mobile Radio Strength
Route Running Test Brake Test
Reverse Audible Alarm Reverse Camera
Road Tax Fuel Level
Mileage KM

CABIN CREW

Equipment Status Equipment Status
Binocular Winch (XD9000)
Remote Winch First Aid Kit
Marshall Vest Portable Light
TIC Flir Gas Detector Honeywell
TIC Drager Dashcam
Barricade Escape Hood Parat
Torch Light Nikon Forestry Range Finder
Weather Station (Monitor) Weather Station (Transmitter)
Cervical Collar SCBA Set 1 280 Bar
SCBA Set 2 280 Bar

BACK COMPARTMENT

Equipment Status Equipment Status
Dry Chemical Fire Extinguisher (2kg) 1 Unit Portable Telescopic Light Mast 1 Unit
Life Jacket (PFD) 5 Unit PRT Kit 1 Unit
Facemask 2 Unit Bolt Cutter 1 Unit
Holligan Bar 1 Unit

HIGH PRESSURE LIFTING BAG

Equipment Status Equipment Status
HLB20 High Pressure Lifting Bag 2 Unit AH10YU Air Hose (Yellow) 1 Unit
AH10BU Air Hose (Blue) 1 Unit AH10RU Air Hose (Red) 1 Unit
Double Control Unit with Safety Valve 1 Unit PRV823AU Pressure Reducer 1 Unit
Shut Off Valve with Safety Valve 3 Unit Tool Case Carrying Bag 1 Unit

HYDRAUIC TOOL SET

Equipment Status Equipment Status
CU4035C NCT Cutter 1 Unit CT4150C Combination Tools 1 Unit
SMC4006C Special Material Cutter 1 Unit TR4340C Telescopic Ram 1 Unit
Extension Pipe 250mm 1 Unit Extension Pipe 450mm 1 Unit
HRS22NCT Ram Support 1 Unit C05GU Core Hose (Orange) 1 Unit
C10OU Core Hose (Orange) 1 Unit PA18H2C Hand Pump 1 Unit
DPU311PC Petrol Duo Pump 1 Unit

Consent

I hereby confirm that the information provided in the truck checklist is accurate and complete to the best of my knowledge. I understand that this checklist will be reviewed by my supervisor for verification. I acknowledge my responsibility to ensure the integrity of the data submitted. By signing below, I agree to submit the completed checklist for supervisor verification.

Verification

Join Inspection by : FM Muhammad Yazid bin Abd Rahman Check by : FM Mohammad Ridzuan Bin Abdul Jabbar Verify by : SFM Sharul Azuary Bin Mohamed Isa
Yazid Wanjeb sharulazuary