SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| ALPHA SFS | Night | April 23, 2025 | 12 | 20 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM M Saiful Md Isa | RIV3 |
| FM Mohamad Firdaus bin Osman | RIV3 |
| Mohammad Mukhlis Bin Azman | FT1 |
| Muhammad Yusof Bin Mohd Yasin | FT1 |
| Mohd Ashraf Bin Malim Diman | DP |
| Mohd Haziq Bin Dali | WT |
| Mohammad Firdaus Bin Lahadi | WT |
| Muhammad Amirul Huda Bin Ibnul Kasim Ahmad | MRV2 |
| Mohd Hazziq Bin Massri | MRV2 |
| Amirul Firdaus bin Amirudin | HZ2 |
| Rushairi Bin Arshad | ALP |
| Rushairi Bin Arshad | PM2 |
| Wan Amirul Syafiq bin Wan Azlan | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Razif Ahmad Bin Razali | Annual Leave |
| Muhammad Firdaus Bin Arifin | Annual Leave |
| Muhammad Qurzaini Bin Kamaruzaman | Annual Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | RO WAN AMIRUL 32115 TERIMA TUGASAN OCC DARIPADA RO RAIHAN 32110 PASUKAN BRAVO DALAM KEADAAN BAIK & TERKAWAL. |
| 20:05 | RO LAPOR TUGAS KEPADA RSM, USM, CSM SERTA MELAKUKAN UJIAN DTRS BERSAMA ANGGOTA BERTUGAS DALAM KEADAAN BAIK & TERKAWAL. |
| 20:10 | ANGGOTA MEMBUAT UJIAN RADIO KEPADA OCC DALAM KEADAAN BAIK & TERKAWAL. |
| 20:15 | ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DALAM KEADAAN BAIK & TERKAWAL. |
| 21:15 | EMERGENCY REPORT 2115HRS: MARSHALL 2 REPORTED 4 CEFS PERSONNEL WITH EMERGENCY VEHICLES (RIV 3 AND MRV2) TO THE LOCATION. 2124HRS: MARSHALL 2 REPORTED ARRIVED AT LOCATION. 2131HRS: MARSHALL 2 CONFIRMED THAT THE BEEHIVE WAS HANGING UNDER CONTROL VALVE, WITH AN ESTIMATED SIZE OF 1ft X 1ft. 2134HRS: MARSHALL 2 REPORTED SETUP OF 2 RESPONDERS COMPLETED WITH BEE SUITS AND 2 BAYGON SPRAYS. 2136HRS: MARSHALL 2 REPORTED OPERATION TO REMOVE BEE NEST BEGINS. 2139HRS: MARSHALL 2 REPORTED THE BEEHIVE WAS SUCCESSFULLY DESTROYED AND THE AREA IS SAFE FROM ANY BEE THREAT. 2141HRS: MARSHALL 2 REPORTED THE TEAM PERFORMED OVERHAUL ACTIVITY. 2142HRS: MARSHALL 2 DECLARED OPERATION STAND DOWN AND CEFS TEAM WITH EMERGENCY VEHICLES RETURNED TO THE FIRE STATION. 2151HRS: MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVED AT SATELITE FIRE STATION. |
| 21:23 | WT LAPOR DIPANDU 32097 BERSAMA 32127 MEMBUAT UJIAN PEMANDUAN DI KAWASAN TCF. |
| 22:00 | ANGGOTA BERTUGAS MENJALANKAN JADUAL TUGASAN HARIAN KELAS TEORI. |
| 22:30 | ANGGOTA BERTUGAS MENJALANKAN JADUAL TUGASAN HARIAN PRAKTIKAL. |
| 06:30 | ANGGOTA MELAKUKAN KERJA KEKEMASAN BALAI DAN PERSEDIAN UNTUK SERAH TUGAS. |
| 08:00 | RO WAN AMIRUL 32115 SERAH TUGAS OCC KEPADA RO KAMARRUZAMAN 32015 PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Wan Amirul Syafiq bin Wan Azlan | Verify by : SFM M Saiful Md Isa |
|---|---|
| SYAFIQ | MSMI |