Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Night April 22, 2025 12 20

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV2
FM Wan Noor Hisham Bin Md Sharif RIV2
Muhammad Faiz Bin Khusnun WT
Mohd Ashraf Bin Malim Diman DP
Muhammad Rafiq Bin Abdul Razak DP
Muhammad Iskandar Bin Ishamudin MRV2
Mohamad Zawawi Bin Mohd Khalid MRV2
Mohd Hanis Bin Hj Mohd Salleh HZ2
Muhammad Nur Hakim bin Mat Rofi FT5
Muhammad Syakirin Bin Ghazali FT5
Mohd Syahrul Safwan bin Tuah ALP
Mohamad Luqman Bin Bahardin -

Staff On Leave

Name Leave Type
Muhammad Anuar Bin Zainal Abidin Annual Leave
Sharif Nur Qayyim bin Sendato Annual Leave

Occurrence Book Entry

Time Remarks
20:00

TERIMA TUGAS OCC DARIPADA PASUKAN ALPHA DALAM KEADAAN BAIK.

20:05

LAPOR TUGAS OCC KEPADA RSM, CSM DAN USM DALAM KEADAAN BAIK.

20:15

SEMUA ANGGOTA BERTUGAS MEMBUAT UJIAN WALKIE TALKIE KEPADA OCC DALAM KEADAAN BAIK.

20:20

SEMUA ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN DALAM KEADAAN BAIK.

21:01

FORD DIPANDU RAFIQ LAPOR KE GATE 3 UNTUK TUGAS-TUGAS KHAS.

21:23

FORD LAPOR SAMPAI BALAI.

22:00

ANGGOTA BERTUGAS MEMBUAT AKTIVITI KELAS THEORY DALAM KEADAAN BAIK.

22:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI PRAKTIKAL (LATIHAN KOMUNIKASI) DALAM KEADAAN BAIK ADANYA.

06:30

ANGGOTA BERTUGAS MEMBUAT PEMBERSIHAN BALAI DALAM KEADAAN BAIK.

07:30

ANGGOTA BERTUGAS MEMBUAT HANDOVER VEHICLE KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK ADANYA.

08:00

SERAH TUGAS OCC KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK ADANYA.

Verification

Check by : Mohamad Luqman Bin Bahardin Verify by : SFM Mohd Nizam Bin Bakri
nizam