Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Day August 22, 2025 23 54

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Muhamad Raihan bin A Manap MRV2
Kamarruzaman Bin Eskhak MRV2
Mohammad Hanafiah bin Mat Setia FT5
Muhammad Yusry Haikal bin yusof FT5
Khairul Najmi Bin Zainal WT
Mohammad Razali Bin Ahmad WT
Mohd Faidhi Bin Mohd Shamsudin PM2
Yazulyadi Bin Yahya ALP
Mohd Jalludin Bin Jamil DP
Muhammad Najib Bin Mohd Shariff DP
Muhammad Shahaidil Bin Ami Nuzairi -

Staff On Leave

Name Leave Type

Occurrence Book Entry

Time Remarks
08:00

RO SHAHAIDIL 32039 TERIMA TUGAS OCC DARIPADA RO MUKHLIS 32057 PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

08:20

ANGGOTA BERTUGAS MELAKUKAN UJIAN KOMUNIKASI BERSAMA OCC DAN DITERIMA DENGAN BAIK.

08:30

ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN OPERASI.

08:48

RAZALI 32023 LAPOR PANDU STAREX KE ASU UNTUK MENGHANTAR 'DUMMY'.

09:00

KEADAAN CUACA DI SEKITAR PENGERANG INTEGRATED COMPLEX BAIK.

09:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI LATIHAN KAWAD KAKI

10:09

EMERGENCY DRILL REPORT
HIGH ANGLE RESCUE
EMERGENCY DRILL NUMBER: SD/54/2025
DATE: 22/08/2025
TIME: 1009HRS
LOCATION: NITROGEN TANK (ASU)
OPU INVOLVED: PGSSB (PENGERANG GAS SOLUTION)
SENIOR FIRE MARSHALL: EN IMRAN JAMALUDIN
SHIFT: BRAVO SFS
CALLER: EN. AMIR (OSC)

10:09

OCC RECEIVED EMERGENCY DRILL NOTIFICATION FROM OSC VIA DTRS. CEFS TEAM, PSCC, AND MEDIC BRAVO TEAM ACTIVATED.

10:10

MARSHALL 2 CONFIRMED DEPLOYMENT OF 6 VEHICLES AND 12 CEFS PERSONNEL. WIND DIRECTION: SOUTH TO NORTH.

10:15

MARSHALL 2 VERIFIED ONE INJURED PERSON INVOLVED.

10:20

INJURED PERSON FOUND UNCONSCIOUS 15 METERS ABOVE NITROGEN TANK.

10:25

RESCUE TEAM ASSEMBLED: 5 CEFS PERSONNEL + 1 PLANT OPERATOR.

10:31

GAS CHECK: OXYGEN AT 18%, NITROGEN AT 100PPM.

10:32

RESCUE TEAM REACHED TANK TOP. VALVE CLOSURE AND LOWERING SYSTEM SETUP INITIATED.

10:34

VALVE AND MANHOLE SUCCESSFULLY CLOSED.

10:37

UPDATED GAS CHECK: OXYGEN 20.8%, NITROGEN NORMALIZED.

11:10

INJURED PERSON SUCCESSFULLY RESCUED AND HANDED OVER TO MEDIC TEAM.

11:12

OVERHAUL ACTIVITY UNDERWAY BY 2 CEFS PERSONNEL AND 1 PLANT OPERATOR

11:15

AREA DECLARED SAFE. OPERATION STANDDOWN INITIATED. HOUSEKEEPING COMMENCED.

12:00

ALL VEHICLES RETURNED TO FIRE STATION.

12:10

CEFS TEAM SAFELY ARRIVED BACK AT STATION.

15:00

KEADAAN CUACA DI SEKITAR PENGERANG INTEGRATED COMPLEX BAIK.

17:00

ANGGOTA BERTUGAS MELAKUKAN SESI LATIHAN FIZIKAL DI BALAI.

17:25

RIV3 DIPANDU KAMARRUZAMAN 32015 BERSAMA NAJIB 32139 KE STESEN PETRONAS BUKIT PELALI UNTUK PENGISIAN MINYAK.

18:08

RIV3 SAMPAI BALAI DALAM KEADAAN BAIK.

19:00

ANGGOTA MELAKUKAN KEKEMASAN BALAI DAN PERSEDIAN UNTUK SERAH TUGAS.

20:00

RO SHAHAIDIL 32039 SERAH TUGAS OCC KEPADA RO MUKHLIS 32057 PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhammad Shahaidil Bin Ami Nuzairi Verify by : SFM Mohamad Imran Bin Jamaludin
Shahaidil