SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Day | April 15, 2025 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Syed Shahrul Bin Syed Yusof | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Khairul Najmi Bin Zainal | DP |
| Che Mohd Azmi Bin Che Loddin | PM2 |
| Kamarruzaman Bin Eskhak | FT5 |
| Muhammad Yusry Haikal bin yusof | MRV2 |
| Yazulyadi Bin Yahya | HZ2 |
| Muhamad Raihan bin A Manap | WT |
| Mohd Faidhi Bin Mohd Shamsudin | ALP |
| Mohd Jalludin Bin Jamil | MRV2 |
| Muhammad Najib Bin Mohd Shariff | FT2 |
| Minimum Manning | |
| Minimum Manning | |
| Muhammad Shahaidil Bin Ami Nuzairi | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Mohammad Hanafiah bin Mat Setia | Annual Leave |
| Mohammad Razali Bin Ahmad | Emergency Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 08:00 | RO SHAHAIDIL 32039 TERIMA TUGAS OCC DARIPADA RO ANUAR 32086 PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL. |
| 08:05 | OCC MEMBUAT UJIAN KOMUNIKASI BERSAMA RSM, USM, CSM, ANGGOTA BERTUGAS DAN DI TERIMA DENGAN BAIK. |
| 08:30 | ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DALAM KEADAAN BAIK. |
| 09:00 | KEADAAN CUACA DI SEKITAR PENGERANG INTEGRATED COMPLEX BAIK. |
| 09:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI ITM DI ‘ENGINE BAY’. |
| 12:15 | KEADAAN CUACA DI SEKITAR MFS HUJAN MANAKALA DI SFS MENDUNG. |
| 12:34 | RIV3 LAPOR DIPANDU FM IZAN KE MAIN GATE 3. |
| 12:50 | OCC TERIMA LAWATAN DARI TEAM PROJEK PHOENIX DIIRINGI OLEH EN. KHARUL ANWAR. |
| 13:13 | RIV3 LAPOR SAMPAI SFS DALAM KEADAAN BAIK. |
| 13:18 | HUJAN DI SEKITAR MFS BERHENTI DAN CUACA DI SEKITAR SFS BAIK SEADANYA. |
| 13:14 | SEMUA ANGGOTA BERTUGAS BERSERTA JENTERA BERGERAK KE MFS KECUALI PM2. |
| 13:57 | ANGGOTA BERSERTA JENTERA SAMPAI MFS DALAM KEADAAN BAIK |
| 14:00 | ANGGOTA BERKUMPUL DI BILIK LATIHAN MFS UNTUK SESI ‘SHIFT ENGAGEMENT WITH MANAGEMENT’. |
| 15:00 | KEADAAN CUACA DI SEKITAR PENGERANG INTEGRATED COMPLEX BAIK. |
| 17:00 | SESI ‘SHIFT ENGAGEMENT WITH MANAGEMENT’ SELESAI, ANGGOTA BERSAMA JENTERA BERGERAK BALIK KE SFS. |
| 17:25 | KESEMUA ANGGOTA DAN JENTERA SAMPAI SFS DALAM KEADAAN BAIK. |
| 17:30 | ANGGOTA BERTUGAS MELAKUKAN SESI LATIHAN FIZIKAL DI GYM. |
| 17:45 | EMERGENCY REPORT |
| 17:45 | OCC RECEIVED A CALL FROM PSCC VIA HOTLINE PHONE INFORMING ABOUT AN OIL SPILL AT JALAN PERONDA SELATAN SWO. |
| 17:45 | OCC ACTIVATED CEFS PIC (SFS) TO THE LOCATION AND REPORTED TO USM REGARDING THE SITUATION. |
| 17:46 | MARSHAL 2 REPORTED 11 CEFS PERSONNEL WITH 7 EMERGENCY VEHICLES DEPLOYED. |
| 17:55 | MARSHAL 2 REPORTED CEFS PIC ARRIVED AT THE LOCATION. |
| 18:04 | FM2 STARTED SIZE-UP AND CONFIRMED THE OIL SPILL AT JALAN PERONDA SELATAN SWO. |
| 18:05 | MARSHAL 2 REQUESTED ADDITIONAL OIL SPILL EQUIPMENT FROM MFS. |
| 18:10 | MRV1 WITH 2 CEFS PERSONNEL (MFS) DEPLOYED TO THE LOCATION. |
| 18:28 | MRV1 REPORTED ARRIVED AT THE LOCATION AND THE TEAM STARTED SETTING UP THE ABSORBENT BOOM. |
| 18:45 | FORD RANGER (MAINTENANCE TEAM) WITH 2 CEFS PERSONNEL (MFS) DEPLOYED TO THE LOCATION WITH ADDITIONAL ABSORBENT BOOM. |
| 19:03 | FORD RANGER REPORTED ARRIVED AT THE LOCATION. |
| 19:18 | MARSHAL 2 REPORTED THE ABSORBENT BOOM SUCCESSFULLY SET UP TO CONTAIN THE OIL SPILL. |
| 19:20 | MARSHAL 2 REPORTED USM DECLARED OPERATION STAND DOWN AND CEFS TEAM RETURNED TO THE FIRE STATION. |
| 19:39 | ALL VEHICLES REPORTED SAFELY ARRIVED AT THE SATELLITE FIRE STATION. |
| 20:00 | RO SHAHAIDIL 32039 SERAH TUGAS OCC KEPADA RO RUSHAIRI 32045 PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Muhammad Shahaidil Bin Ami Nuzairi | Verify by : SFM Syed Shahrul Bin Syed Yusof |
|---|---|
| Shahaidil | ![]() |
