Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Night April 14, 2025

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Wan Noor Hisham Bin Md Sharif RIV3
Muhammad Iskandar Bin Ishamudin WT
Muhammad Faiz Bin Khusnun DP
Mohamad Zawawi Bin Mohd Khalid DP
Mohd Azrulnizam bin Mohd Dzulkiflee MRV2
Muhammad Syakirin Bin Ghazali MRV2
Mohd Ashraf Bin Malim Diman HZ2
Sharif Nur Qayyim bin Sendato FT5
Muhammad Rafiq Bin Abdul Razak FT5
Mohamad Luqman Bin Bahardin ALP
Minimum Manning
Minimum Manning
Muhammad Anuar Bin Zainal Abidin -

Staff On Leave

Name Leave Type
Mohd Syahrul Safwan bin Tuah Hospitalization Leave
Muhammad Nur Hakim bin Mat Rofi Annual Leave
Mohd Hanis Bin Hj Mohd Salleh Annual Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO ANUAR TERIMA TUGAS DARI RO RUSHAIRI DALAM KEADAAN BAIK DAN TERKAWAL.

20:15

OCC MEMBUAT UJIAN RADIO KEPADA RSM, CSM, & USM SERTA LAPOR KEKUATAN ANGGOTA BERTUGAS DAN KEKUATAN JENTERA OPERASI DALAM KEADAAN BAIK DAN TERKAWAL.

20:20

ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC DALAM KEADAAN BAIK TERANG & JELAS ROMEO 5.

20:58

FORD SATELLITE DIPANDU FF ZAWAWI KELUAR KE GATE 3 URUSAN TUGAS-TUGAS KHAS.

21:40

FORD LAPOR SELAMAT SAMPAI BALAI.

08:00

SAYA RO ANUAR SERAH TUGAS KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhammad Anuar Bin Zainal Abidin Verify by : SFM Mohd Nizam Bin Bakri
WAR nizam