SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| ALPHA SFS | Day | April 9, 2026 | 10 | 15 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM M Saiful Md Isa | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Muhammad Faiz Bin Khusnun | MRV2 |
| Muhammad Anuar Bin Zainal Abidin | MRV2 |
| Mohd Khairihizmi bin Ibrahim | FT5 |
| Muhammad Yusry Haikal bin yusof | FT5 |
| Muhammad Firdaus Bin Arifin | DP |
| Mohamad Nazreen B. Mohamad Ramli | WT |
| Valentino Hartley Simeon | HZ2 |
| Amirul Firdaus bin Amirudin | PM2 |
| Mohd Haziq Bin Mohd Din | ALP |
| Muhammad Nur Hakim bin Mat Rofi | HZ2 |
| Mohd Syahrul Safwan bin Tuah | - |
Staff On Leave
| Name | Leave Type |
|---|
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 08:00 | SAYA RO 32005 TERIMA TUGAS OCC DARI PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL. |
| 08:05 | SAYA RO 32005 LAPOR KEKUATAN ANGGOTA KEPADA RSM, CSM DAN USM MELALUI TALIAN WHATSAPP. |
| 08:20 | PASUKAN ALPHA DI KETUAI SFM SAIFUL MEMBUAT UJIAN DAN PEMERIKSAAN PERALATAN OPERASI. |
| 09:00 | SEMUA ANGGOTA PASUKAN ALPHA MEMBUAT FITNESS AND COMPETENCY TEST. |
| 10:39 | PRE EMERGENCY DRILL REPORT 1039HRS: OCC RECEIVED A CALL VIA DTRS FROM EN AZRI (CSM) REGARDING FIRE INCIDENT AT LLDPE (FPU 3200) 1X IP INVOLVED. 1040HRS: OCC ACTIVATED CEFS MFS, PSCC AND MEDIC BRAVO TO THE LOCATION. 1040HRS: MARSHALL 2 REPORTED 13 CEFS PERSONNEL AND 07 EMERGENCY VEHICLES DEPLOYED TO THE SCENE. 1046HRS: MARSHALL 2 REPORTED CEFS PIC TEAM ARRIVED AND START TO SIZE UP LOCATION AND ACTIVATED R.E.C.E.O METHOD. 1048HRS: MARSHALL 2 REPORTED THERE ARE TRUE JET FIRE 3200-K-(ETYLENE COMPRESSOR) AT THE LOCATION APPROXIMATELY 30 DEGREE CELCIUS HEAT. ERT TEAM ALREADY ACTIVATED FIXED MONITOR AT THE LOCATION. 1052HRS: MARSHALL 2 REPORTED CEFS TEAM DEPLOYED ONE LINE USING A GROUND MONITOR FOR CONFINE THE FIRE. 1058HRS: MARSHALL 2 REPORTED CEFS TEAM DEFENSIVE MODE DEPLOYED 300 FEET HOSE LINE WITH 2 NOZZLES AND ISOLATED THE VALVE. 1102HRS: MARSHALL 2 REPORTED FIRE UNDER CONTROLLED. 1104HRS: MARSHALL 1 REPORTED 4X CEFS AND 2X ERT TEAM DOING SAR AND FOUND 1XIP (UNCONSCIOUS)NEAR THE COMPRESSOR. 1106HRS: MARSHALL REPORTED IP SUCCESFULLY HANDOVER TO MEDIC TEAMS. 1107HRS: MARSHALL 2 REPORTED 3 PERSONNEL CEFS TEAM AND 2 ERT ENTER TO THE LOCATION FOR OVERHAUL. 1108HRS: MARSHALL 1 REPORTED OVERHAUL COMPLETED. 1109HRS: OSC REPORTED AND DECLARED STAND DOWN. 1125HRS: ALL CEFS TEAM PERSONNEL GOING BACK TO SATELITE FIRE STATION. 1136HRS: ALL CEFS TEAM PERSONNEL SAFELY ARRIVED AT SATELITE FIRE STATION. |
| 11:36 | ANGGOTA ALPHA SELESAI LATIHAN KEBAKARAN DI LLDPE.DAN TIBA DI SATELITE FIRE STATION. |
| 14:00 | UJIAN FITNESS AND COMPETENY TEST PASUKAN ALPHA SELESAI. |
| 14:30 | MRV 2 LAPOR SAMPAI BALAI SFS SELESAI MAINTENACE SERVICE. |
| 19:00 | PASUKAN ALPHA MEMBUAT KERJA PEMBERSIHAN DI SEKITAR KAWASAN BALAI UNTUK SERAHAN TUGAS KEPADA PASUKAN DELTA. |
| 20:00 | SAYA RO 32005 SERAH TUGAS OCC KEPADA RO PASUKAN DELTA DDALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Mohd Syahrul Safwan bin Tuah | Verify by : SFM M Saiful Md Isa |
|---|---|
| STORM | MSMI |