SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Night | April 5, 2026 | 09 | 15 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM M Hafizudin Zainudin | RIV3 |
| FM Muhammad Yazid bin Abd Rahman | RIV3 |
| Khairul Najmi Bin Zainal | ALP |
| Mohd Faidhi Bin Mohd Shamsudin | PM2 |
| Mohd Jalludin Bin Jamil | MRV2 |
| Mohd Hasif Bin Salami | MRV2 |
| Muhamad Hafiz bin Baseri | FT5 |
| Mohd Hazeem Bin Abdul Halim | FT5 |
| Wan Amirul Syafiq bin Wan Azlan | WT |
| Mohd Ashraf Bin Malim Diman | HZ2 |
| Mohd Sharul Hisham Bin Kamaruddin | HZ2 |
| Mohamad Sufian Bin Mohd Lazi | DP |
| Mohd Irwan Syah Bin Rohaizan | DP |
| Sharif Nur Qayyim bin Sendato | - |
Staff On Leave
| Name | Leave Type |
|---|
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA SHARIF NUR QAYYIM TERIMA TUGAS DI OCC DARI CHRYSOS ERIC PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:14 | ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN PERALATAN DAN JENTERA SETERUSNYA MELAKUKAN UJIAN WALKIE TALAKIE. |
| 20:26 | SFM HAFIZUDIN LAPOR ANGGOTA BERTUGAS SERAMAI 13 ORANG DAN 8 BUAH JENTERA OPERASI DALAM KEADAAN BAIK DAN SIAP SEDIA UNTUK MELAKUKAN KERJA-KERJA OPERASI. |
| 20:28 | MRV2 DIPANDU OLEH HASIF LAPOR KELUAR BALAI BERSAMA JALAL UNTUK MEMBUAT KERJA-KERJA FSP DI SEKITAR NON-PROSES. |
| 20:41 | HASIF LAPOR MRV2 SELAMAT TIBA DI BALAI BERSAMA CREW. |
| 21:30 | FM YAZID LAPOR ANGGOTA BERTUGAS MENGHADIRI KELAS TEORI DI BILIK LATIHAN DIKETUAI SFM HAFIZUDIN. |
| 22:12 | EMERGENCY DRILL REPORT |
| 22:12 | OCC RECEIVED A CALLED FROM EN AINUDDIN OPU ASU BY USING MOBILE RADIO DTRS REPORTED THERE WAS LOPC AT ASU |
| 22:13 | OCC ACTIVATED CEFS SATELLITE FIRE STATION AND MEDIC TEAM TO LOCATION AND MARSHALL 2 REPORTED CEFS PERSONNEL AND EMERGENCY VEHICLES DEPLOYED TO THE LOCATION. |
| 22:15 | MARSHALL 2 REPORTED CEFS PIC TEAM ARRIVED AT LOCATION. |
| 22:16 | MARSHALL 2 REPORTED THERE WAS A LOPC AT NITROGEN AND OXYGEN TANK AND CEFS TEAM START PERFORM SIZE UP. |
| 22:18 | MARSHALL 2 REPORTED CEFS TEAM PERFORM COOLING (RAINDOWN) BY USING GUN DECK FIRE TRUCK. |
| 22:22 | MARSHALL 2 REPORTED GAS CHECK: OXYGEN AT 18%, NITROGEN AT 100PPM. |
| 22:30 | MARSHALL 2 REPORTED CURRENT PRESSURE READING IS 0.5 BAR. |
| 22:35 | MARSHALL 2 REPORTED CURRENT PRESSURE READING IS 0 BAR AND 2X CEFS PERSONNEL PERFORM OVERHAUL AT NITROGEN AND OXYGEN TANK. |
| 22:40 | MARSHALL 2 REPORTED CURRENT GAS READING IS NORMAL. |
| 22:46 | OSC DECLARED STAND DOWN AND CEFS TEAM START HOUSEKEEPING. |
| 22:55 | MARSHALL 2 REPORTED CEFS TEAM RETURN TO SATELLITE FIRE STATION. |
| 22:57 | MARSHALL 2 REPORTED ALL VEHICLES SAFELY ARRIVED AT SATELLITE FIRE STATION. |
| 23:40 | FM YAZID LAPOR ANGGOTA SELESAI MENJALANKAN LATIHAN DRILL, SETERUSNYA ANGGOTA BERTUGAS MEMBERSIHKAN PERLATAN OPERASI DAN JENTERA UNTUK DISERAHKAN DALAM KEADAAN BAIK. |
| 00:05 | ANGGOTA BERTUGAS BERSEDIA DI BALAI. |
| 06:55 | ANGGOTA BERTUGAS MELAKUKAN KERJA-KERJA HOUSEKEPING PADA BALAI DAN JENTERA. |
| 08:00 | SAYA SHARIF NUR QAYYIM SELESAI BERTUGAS DI OCC, TUGAS SETERUSNYA DISERAHKAN KEPADA ANGGOTA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Sharif Nur Qayyim bin Sendato | Verify by : SFM M Hafizudin Zainudin |
|---|---|
| Qayyim | m hafizudin |