Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Day June 19, 2025 19 36

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV3
FM Muhammad Izan Bin Hamzah RIV3
Khairul Najmi Bin Zainal HZ2
Muhammad Shahaidil Bin Ami Nuzairi ALP
Kamarruzaman Bin Eskhak FT5
Mohammad Razali Bin Ahmad WT
Yazulyadi Bin Yahya DP
Muhamad Raihan bin A Manap PM2
Muhammad Najib Bin Mohd Shariff MRV2
Mohd Jalludin Bin Jamil FT5
Mohammad Hanafiah bin Mat Setia MRV2
Muhammad Yusry Haikal bin yusof HZ2
Minimum Manning
Mohd Faidhi Bin Mohd Shamsudin -

Staff On Leave

Name Leave Type

Occurrence Book Entry

Time Remarks
08:00

SAYA RO FAIDHI TERIMA TUGAS OCC DARIPADA RO HAZZIQ DALAM KEADAAN BAIK DAN TERKAWAL.

08:05

OCC LAPOR MEMBUAT UJIAN RADIO DAN LAPOR TUGAS KEPADA RSM, CSM DAN USM DALAM KEADAAN BAIK DAN TERKAWAL.

08:10

ANGGOTA BERTUGAS MELAKUKAN UJIAN RADIO KEPADA OCC DAN MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN.

08:45

SEMUA PEMANDU MELAKUKAN UJIAN PERJALANAN DI SEKITAR KAWASAN SMALL PACKAGE CAMP.

09:00

SEMUA JENTERA SELAMAT TIBA DI BALAI.

09:30

SEMUA ANGGOTA BERKUMPUL DI ENGINE BAY UNTUK AKTIVITI KAWAD KAKI.

09:51

OCC RECEIVED A CALL VIA WALKIE TALKIE BY USM MR DOMINIC REGARDING A SPILL AT SWO FROM CDU STRAINER S001 HEAVY LEAKAGE.

09:52

OCC ACTIVATED CEFS PIC (SFS).

09:53

MARSHALL 2 REPORTED 12 CEFS PIC PERSONNELS, 6 EMERGENCY VEHICLES AND A FORD RANGER DEPLOYED TO THE LOCATION.

09:54

OCC REPORTED CURRENT WIND DIRECTION IS HEADING FROM SOUTH EAST TO NORTH WEST AND WIND SPEED IS 6.1KM/H.

10:00

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVED AT THE LOCATION AND BEGIN SIZE UP THE AREA.

10:01

MARSHALL 2 CONFIRMED THAT THERE IS OIL SPILL (LOPC) DUE TO STRAINER UNIT S-001 LEAKAGE AND NO IP INVOLVED.

10:05

KNUCKLE BOOM REPORT ARRIVED AT SWO.

10:07

FIRE MARSHAL 2 REPORT OXYGEN NORMAL, H2S 0PPM AND LEL 0, NORMAL READING.

10:08

FIRE MARSHALL 2 REPORT STARTED BOOM DEPLOYMENT AT THE LOCATION.

10:17

MARSHAL 2 REPORTED THAT THE CEFS TEAM IS AWAITING THE ARRIVAL OF THE CONTRACTOR, WITH PLANS TO COLLABORATE ON DEPLOYING THE ABSORBENT PILLOWS TO CONTAIN THE SPILL.

10:40

FIRE MARSHALL 2 REPORT CONTRACTOR WILL ARRIVE ESTIMATED IN 5MINUTES.

10:46

CONTRACTOR ARRIVED AT SWO.

10:48

FIRE MARSHAL 2 REPORTED THAT BOOM DEPLOYMENT OPERATIONS HAVE COMMENCED AT THE SPILL SITE

10:52

MARSHAL 2 REPORTED THAT THE BOOM HAS BEEN SUCCESSFULLY DEPLOYED AT THE SITE.

10:57

ON SCENE COMMANDER DECLARE OPERATION STAND DOWN.

11:06

MARSHALL 2 REPORT ALL WORK COMPLETED.

11:46

FIRE MARSHALL 2 REPORT ALL CEFS TEAM ARRIVED AT SATELLITE FIRE STATION.

14:00

SEMUA ANGGOTA KE BALAI MAIN UNTUK MENJALANI UJIAN BERTULIS DAN PRAKTIKAL BOFA.

15:58

HZT 2 LAPOR KE LOKASI KECEMASAN DI TANK 5170T004 (BANTUAN).

16:20

FT5 LAPOR DIPANDU KAMARUL BERSAMA JALAL KE PETRONAS PELALI PENGISIAN MINYAK.

17:10

FT5 LAPOR SAMPAI BALAI.

17:15

SEMUA ANGGOTA MELAKUKAN AKTIVITI FIZIKAL.

19:00

SEMUA ANGGOTA MELAKUKAN PEMBERSIHAN DAN KEKEMASAN BALAI.

19:30

SEMUA ANGGOTA MELAKUKAN AKTIVITI SERAH TUGAS KEPADA SHIF ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

20:00

SAYA RO FAIDHI SERAH TUGAS OCC KEPADA SHIFT ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Faidhi Bin Mohd Shamsudin Verify by : SFM Syed Shahrul Bin Syed Yusof
FAIDHI