SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
ALPHA SFS Night February 5, 2026 4 9

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Wan Noor Hisham Bin Md Sharif RIV3
Muhammad Firdaus Bin Arifin MRV2
Razif Ahmad Bin Razali MRV2
Mohammad Firdaus Bin Lahadi FT2
Amirul Firdaus bin Amirudin FT2
Muhammad Yusof Bin Mohd Yasin WT
Mohd Haziq Bin Dali ALP
Rushairi Bin Arshad PM2
Wan Amirul Syafiq bin Wan Azlan HZ2
Muhammad Amirul Huda Bin Ibnul Kasim Ahmad DP
Mohd Hazziq Bin Massri HZ2
Mohammad Mukhlis Bin Azman -

Staff On Leave

Name Leave Type
SFM M Saiful Md Isa Hospitalization Leave Family Member
FM Mohamad Firdaus bin Osman Annual Leave
Muhammad Qurzaini Bin Kamaruzaman Annual Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO 32057 MUKHLIS TERIMA TUGAS OCC DARIPADA PASUKAN BRAVO DALAM KEADAAN BAIK ADANYA.

20:05

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM DALAM KEADAAN BAIK ADANYA.

20:10

SEMUA ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DALAM KEADAAN BAIK ADANYA.

20:15

SEMUA ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO SET KEPADA OCC DALAM KEADAAN BAIK ADANYA.

20:20

RIV3 LAPOR DIPANDU WAN NOOR HISHAM MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:25

FT 5 LAPOR DI PANDU FIRDAUS LAHADI BERSAMA AMIRUL FIRDAUS MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:30

DP LAPOR DI PANDU AMIRUL HUDA MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:35

WT LAPOR DI PANDU YUSOF MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:40

HZT 2 LAPOR DI PANDU WAN AMIRUL BERSAMA HAZZIQ MASSRI MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:45

ALP LAPOR DI PANDU HAZIQ DALI MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

20:50

MRV 2 LAPOR DI PANDU FIRDAUS ARIFFIN BERSAMA RAZIF AHMAD MEMBUAT ROUTE RUNNING TEST DI SEKITAR KAWASAN BALAI.

21:00

SEMUA JENTERA OPERASI SAMPAI BALAI.

21:25

EMERGENCY DRILL REPORT
HAZMAT TOXIC GAS RELEASE (PUMP 101)
EMERGENCY DRILL NO : SD/08/2026
DATE : 5/2/2026
TIME : 2125HRS
LOCATION: PUMP-101
OPU INVOLVED : PCINA
SENIOR FIRE MARSHALL : EN NIZAM HJ BAKRI
SHIFT :ALPHA SFS
CALLER NAME : EN RIJALULLAH(PANELMAN)

2125HRS: OCC RECEIVED A CALL FROM EN RIJALULLAH(PANELMAN) REGARDING VAPOUR CLOUD AT PCINA PUMP 101.

2126HRS: OCC ACTIVATED CEFS SATELLITE FIRE STATION TO LOCATION.

2126HRS: MARSHALL 2 REPORTED CEFS PERSONNEL AND EMERGENCY VEHICLES DEPLOYED TO THE LOCATION.

2129HRS: MARSHALL 2 REPORTED CEFS PIC TEAM ARRIVED AT LOCATION.

2130HRS: MARSHALL 2 REPORTED THERE WAS A VAPOUR CLOUD AT PUMP 101, ERT HAVE ACTIVATED FIXED MONITOR FOR COOLING AND CEFS TEAM START PERFORM SIZE UP.

2132HRS: MARSHALL 2 REPORTED VALVED HAS BEEN ISOLATED BY PANELMAN.

2134HRS: MARSHALL 2 REPORTED 1X FM2 WITH 1X CEFS PERSONNEL AND 1X OPERATION PERFORM OVERHAUL AT PUMP 101.

2138HRS: MARSHALL 2 REPORTED CURRENT GAS READING IS NORMAL AND FINISH DOING OVERHAUL.

2139HRS: OSC DECLARED STAND DOWN AND CEFS TEAM START HOUSEKEEPING.

2143HRS: MARSHALL 2 REPORTED CEFS TEAM RETURN TO SATELLITE FIRE STATION.

2154HRS: MARSHALL 2 REPORTED ALL VEHICLES SAFELY ARRIVED AT SATELLITE FIRE STATION.

22:38

EMERGENCY DRILL REPORT
HAZMAT(LOPC)
EMERGENCY DRILL NO : SD/09/2026
DATE : 5/2/2026
TIME : 2238HRS
LOCATION: ASU
OPU INVOLVED : PGSSB
SENIOR FIRE MARSHALL : EN NIZAM HJ BAKRI
SHIFT :ALPHA SFS
CALLER NAME : EN SYAHID (OSC ASU)

2238HRS: OCC RECEIVED A CALLED FROM EN SYAHID OSC ASU BY USING MOBILE RADIO DTRS REPORTED THERE WAS LOPC AT ASU .

2239HRS: OCC ACTIVATED CEFS SATELLITE FIRE STATION TO LOCATION.

2239HRS: MARSHALL 2 REPORTED CEFS PERSONNEL AND EMERGENCY VEHICLES DEPLOYED TO THE LOCATION.

2242HRS: MARSHALL 2 REPORTED CEFS PIC TEAM ARRIVED AT LOCATION.

2243HRS: MARSHALL 2 REPORTED THERE WAS A LOPC AT PIPERACK AND CEFS TEAM START PERFORM SIZE UP.

2248HRS: MARSHALL 2 REPORTED CEFS TEAM PERFORM COOLING BY USING GROUND MONITOR AND CURRENT PRESSURE IS 30 BAR.

2258HRS: MARSHALL 2 REPORTED CURRENT PRESSURE READING IS 10 BAR.

2300HRS: MARSHALL 2 REPORTED CURRENT PRESSURE READING IS 0 BAR AND 2X CEFS PERSONNEL PERFORM OVERHAUL AT PIPERACK.

2304HRS: MARSHALL 2 REPORTED CURRENT GAS READING IS NORMAL.

2305HRS: OSC DECLARED STAND DOWN AND CEFS TEAM START HOUSEKEEPING.

2310HRS: MARSHALL 2 REPORTED CEFS TEAM RETURN TO SATELLITE FIRE STATION.

2317HRS: MARSHALL 2 REPORTED ALL VEHICLES SAFELY ARRIVED AT SATELLITE FIRE STATION.

06:30

SEMUA ANGGOTA BERTUGAS MEMBUAT KERJA-KERJA PEMBERSIHAN BALAI.

07:30

SEMUA PEMANDU JENTERA MEMBUAT SERAH DAN TERIMA TUGAS KEPADA PEMANDU PASUKAN SETERUSNYA DALAM KEADAAN BAIK ADANYA.

08:00

SAYA RO 32057 MUKHLIS SERAH TUGAS OCC KEPADA OCC SETERUSNYA DALAM KEADAAN BAIK ADANYA.

Verification

Check by : Mohammad Mukhlis Bin Azman Verify by : SFM Mohd Nizam Bin Bakri
mukhlis nizam