SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Night | January 31, 2026 | 3 | 7 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Mohamad Imran Bin Jamaludin | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Mohammad Razali Bin Ahmad | MRV2 |
| Muhammad Qurzaini Bin Kamaruzaman | MRV2 |
| Yazulyadi Bin Yahya | FT2 |
| Mohammad Hanafiah bin Mat Setia | FT2 |
| Mohd Jalludin Bin Jamil | WT |
| Muhammad Firdaus Bin Arifin | DP |
| Kamarruzaman Bin Eskhak | HZ2 |
| Khairul Najmi Bin Zainal | ALP |
| Rushairi Bin Arshad | PM2 |
| Muhammad Shahaidil Bin Ami Nuzairi | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Muhammad Yusry Haikal bin yusof | Annual Leave |
| Muhammad Najib Bin Mohd Shariff | Annual Leave |
| Mohd Faidhi Bin Mohd Shamsudin | Sick Leave |
| Muhamad Raihan bin A Manap | Sick Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | RO SHAHAIDIL 32039 TERIMA TUGAS OCC DARIPADA RO PASUKAN CHARLIE AMIRUL SULAIMAN 32084. |
| 20:30 | ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DALAM KEADAAN BAIK. |
| 20:40 | ANGGOTA BERTUGAS MEMBUAT UJIAN KOMUNIKASI BERSAMA OCC DAN DITERIMA DENGAN BAIK. |
| 22:07 | EMERGENCY DRILL REPORT |
| 22:07 | OCC RECEIVED DRILL NOTIFICATION FROM USM DOMINIC CHUA. CEFS PIC, PSCC & MEDIC BRAVO ACTIVATED. MARSHAL 2 DEPLOYED 7 VEHICLES & 11 CEFS PERSONNEL. WIND: NORTH → SOUTH. |
| 22:13 | CEFS TEAM ARRIVED AT LOCATION & CONFIRM DRILL FIRE AND EXPOSION. |
| 22:15 | OPERATION TEAM CONTROLLING FIRE USING 1 GROUND MONITOR. PIPELINE TEMPERATURE: 250°C. |
| 22:17 | CEFS TEAM USED GUN DECK FT 02 & 1 GROUND MONITOR FOR FIRE CONTROL. |
| 22:19 | PIPELINE PRESSURE REPORTED AT 5 BAR. |
| 22:20 | TEMPERATURE REDUCED TO 150°C. |
| 22:23 | PRESSURE 3 BAR, TEMPERATURE 70°C. PIPELINE ISOLATION INITIATED BY PANELMAN. |
| 22:26 | PIPELINE FULLY ISOLATED. COOLING OPERATION ONGOING. TEMPERATURE 55°C. |
| 22:27 | FIRE SIZE REDUCED. TEMPERATURE 36°C. |
| 22:28 | FIRE EXTINGUISHED. TEMPERATURE 27°C. |
| 22:29 | CEFS TEAM CONDUCTED OVERHAUL. |
| 22:30 | OVERHAUL COMPLETED, NO HAZARDS DETECTED. |
| 22:31 | OSC DECLARED STANDDOWN. HOUSEKEEPING BEGAN. |
| 22:55 | ALL VEHICLES RETURNED TO FIRE STATION. |
| 23:02 | SEMUA ANGGOTA DAN JENTERA SAMPAI DI BALAI DALAM KEADAAN BAIK. |
| 00:00 | ANGGOTA BERSIAP SIAGA DI BALAI DAN BALAI DALAM KEADAAN BAIK |
| 03:00 | ANGGOTA BERSIAP SIAGA DI BALAI DAN KEADAAN CUACA DI SEKITAR PENGERANG INTEGRATED COMPLEX BAIK. |
| 05:30 | ANGGOTA MELAKUKAN AKTIVITI KEBERSIHAN DAN KEKEMASAN BALAI. |
| 07:30 | PERSEDIAN UNTUK SERAH TUGAS KEPADA PASUKAN DELTA. |
| 08:00 | RO SHAHAIDIL 32039 SERAH TUGAS OCC KEPADA RO PASUKAN DELTA HAKIM 32103. |
Verification
| Check by : Muhammad Shahaidil Bin Ami Nuzairi | Verify by : SFM Mohamad Imran Bin Jamaludin |
|---|---|
![]() |
![]() |

