Shift Shift Cycle Date Emergency Drill
BRAVO SFS Day January 28, 2026 3 6

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Mohammad Razali Bin Ahmad MRV2
Muhammad Shahaidil Bin Ami Nuzairi FT5
Mohd Jalludin Bin Jamil WT
Kamarruzaman Bin Eskhak HZ2
Khairul Najmi Bin Zainal ALP
Mohd Faidhi Bin Mohd Shamsudin PM2
Muhamad Raihan bin A Manap DP
Muhamad Amir Alif bin Azman MRV2
Mohammad Hanafiah bin Mat Setia FT5
Muhammad Amirul Bin Sulaiman -

Staff On Leave

Name Leave Type
Yazulyadi Bin Yahya Hospitalization Leave
Muhammad Najib Bin Mohd Shariff Annual Leave
Muhammad Yusry Haikal bin yusof Annual Leave

Occurrence Book Entry

Time Remarks
08:00

OCC AMIRUL TERIMA TUGAS BILIK KAWALAN KEPADA PASUKAN DELTA LUQMAN DALAM KEADAAN BAIK DAN TERKAWAL.

08:04

OCC LAPOR KEKUATAN ANGGOTA BERTUGAS KEPADA RSM, USM DAN CSM DALAM KEADAAN BAIK.

08:06

ANGGOTA BERTUGAS MEMBUAT UJIAN WALKIE TALKIE DAN MEMBUAT PEMERIKSAAN JENTERA KEPADA OCC DALAM KEADAAN BAIK.

08:53

MRV2 DIPANDU RAZALI LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK.

08:54

STAREX DIPANDU FF AMIR LAPOR KELUAR GATE 2 TUGAS-TUGAS KHAS.

09:08

MRV2 DIPANDU FF ARAZALI LAPOR SELAMAT SAMPAI SATELLITE STATION DALAM KEADAAN BAIK.

09:21

FT5 DIPANDU FF SHAHAIDIL LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK.

09:30

ANGGOTA BRAVO MEMBUAT AKTIVITI ITM (VEHICLE& EQUIPMENT ITM) DALAM KEADAAN BAIK.

11:32

EMERGENCY DRILL REPORT
HIGH ANGLE RESCUE
DRILL NUMBER: SD/06/2026
DATE: 28/01/2026
TIME: 1132 HRS
LOCATION: SUBSTATION, JETTY OPERATION BUILDING (JOB) 751
OPC INVOLVED: PRPC UF
SENIOR FIRE MARSHAL: EN. IMRAN JAMALUDIN
SHIFT: BRAVO SFS
CALLER: USM AIZAD FALIQ

11:32

OCC RECEIVED CALL FROM USM AIZAD FALIQ VIA DTRS. DRILL SCENARIO: 1 IP HANGING AT ~10M PLATFORM. OCC ACTIVATED CEFS SATELLITE FIRE STATION, MEDIC BRAVO, AND PSCC.

11:33

MARSHALL 2 REPORTED CEFS TEAM MOBILIZED WITH 11 PERSONNEL AND 7 VEHICLES.

11:40

CEFS TEAM ARRIVED AT LOCATION.

11:41

DRILL CONFIRMED: 1 IP SUSPENDED AT ~10M. CEFS TEAM CONDUCTED SIZE-UP AND PREPARED RESCUE

11:44

4 CEFS RESCUERS ASCENDED TO PLATFORM TO INITIATE RESCUE.

11:45

RESCUE OPERATION COMMENCED USING GOTCHA SYSTEM.

11:51

VICTIM SUCCESSFULLY RESCUED USING PICK-OFF TECHNIQUE (GOTCHA).

11:53

VICTIM LOWERED AND HANDED OVER TO MEDICAL TEAM.

11:55

OVERHAUL ACTIVITY CONDUCTED.

11:59

OSC DECLARED OPERATION STAND DOWN.

12:17

CEFS TEAM RETURNED TO SATELLITE FIRE STATION.

12:35

ALL EMERGENCY FIRE VEHICLES SAFELY ARRIVED AT SATELLITE FIRE STATION.

13:20

ANGGOTA BERTUGAS MENUNAIKAN SOLAT ZOHOR.

14:00

ANGGOTA BRAVO MEMBUAT AKTIVITI ITM (VEHICLE& EQUIPMENT ITM) DALAM KEADAAN BAIK.

14:38

STAREX DIPANDU FF AMIR LAPOR KELUAR KE PETRONAS BUKIT PELALI DAN TUGAS-TUGAS KHAS.

16:42

ANGGOTA BERTUGAS MENUNAIKAN SOLAT ASAR.

17:00

ANGGOTA BERTUGAS MEMBUAT AKTIVITI SUKAN.

19:00

ANGGOTA BRAVO MEMBUAT KEBESIHAN BALAI DAN JENTERA DALAM KEADAAN BAIK.

19:30

ANGGOTA BRAVO MEMBUAT HANOVER SHIFT ALHPA DALAM KEADAAN BAIK.

20:00

OCC AMIRUL SERAH TUGAS BILIK KAWALAN KEPADA PASUKAN ALHPA DALAM KEADAAN BAIK.

Verification

Check by : Muhammad Amirul Bin Sulaiman Verify by : SFM Mohamad Imran Bin Jamaludin
AMIERUL