SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Night | January 22, 2026 | 3 | 4 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Mohamad Imran Bin Jamaludin | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Muhammad Yusry Haikal bin yusof | MRV2 |
| Mohammad Hanafiah bin Mat Setia | MRV2 |
| Mohammad Razali Bin Ahmad | FT5 |
| Mohd Faidhi Bin Mohd Shamsudin | WT |
| Muhamad Raihan bin A Manap | HZ2 |
| Muhammad Shahaidil Bin Ami Nuzairi | ALP |
| Khairul Najmi Bin Zainal | PM2 |
| Wan Amirul Syafiq bin Wan Azlan | DP |
| Muhammad Najib Bin Mohd Shariff | FT5 |
| Muhammad Qurzaini Bin Kamaruzaman | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Mohd Jalludin Bin Jamil | Annual Leave |
| Yazulyadi Bin Yahya | Hospitalization Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA KAMARRUZAMAN 32015 PASUKAN BRAVO SFS TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE SFS DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:05 | OCC LAPOR KEKUATAN ANGGOTA BERTUGAS PASUKAN BRAVO KEPADA RSM, CSM DAN USM. |
| 20:10 | ANGGOTA BERTUGAS MELAKUKAN UJIAN WALKIE TALKIE KEPADA OCC. |
| 20:15 | ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN. |
| 20:35 | MRV 2 DIPANDU YUSRY BERSAMA NAJIB MELAKUKAN ROAD RUNNING SEKITAR NON-PROCESS AREA. |
| 21:00 | MRV 2 LAPOR SAMPAI DIBALAI DALAM KEADAAN BAIK. |
| 22:09 | EMERGENCY DRILL REPORT 2159HRS: OCC RECEIVED REPORT FROM MR. AZHAR (OSC) VIA DTRS REGARDING EMERGENCY DRILL FIRE AT SUBSTATION 330 PP AND 1 IP (INJURED PERSON) INVOLVED. 2200HRS: OCC ACTIVATED CEFS TEAM (SFS), MEDIC 02 AND SECURITY TEAM TO THE LOCATION. 2210HRS: MARSHALL 2 REPORTED CEFS SATELLITE STATION MOBILIZED WITH 11 PERSONNEL AND 6 OPERATIONAL VEHICLES , OCC INFORMED WIND DIRECTION: NORTH TO SOUTH, WIND SPEED: 6.1 KM/H 2215HRS: CEFS TEAM ARRIVED. MARSHALL 2 BEGAN SIZE-UP AND SITUATIONAL ASSESSMENT. 2216HRS: MARSHALL 2 CONFIRMED FIRE AT SUBSTATION 330 WITH 1 IP INVOLVED. 2218HRS: 2 CEFS PERSONNEL AND 2 ERT PERSONNEL ENTERED SUBSTATION WITH DRY POWDER EXTINGUISHERS FOR SURVEY. 2223HRS: FM 2 CHECKED TEMPERATURE USING TIC. REPORTED TEMPERATURE: 60°C 2226HRS: FIRE SUCCESSFULLY EXTINGUISHED BY INERGEN RELEASE. 2227HRS: 2 ERT AND 2 CEFS PERSONNEL ENTERED SUBSTATION FOR SEARCH AND RESCUE. 2228HRS: RESCUE TEAM LOCATED IP AND STABILIZED CONDITION. SITUATION UNDER CONTROL. 2229HRS: 1 UNCONSCIOUS IP HANDED OVER TO MEDIC TEAM FOR FURTHER ACTION. 2230HRS: OVERHAUL PROCEDURE INITIATED. 2231HRS: OVERHAUL TEAM REPORTED OXYGEN LEVELS NORMAL AND AREA FREE FROM FIRE HAZARDS. 2232HRS: OSC DECLARED STANDDOWN. 2247HRS: MARSHAL 2 REPORTED ALL VEHICLES BACK TO THE FIRE STATION. 2256HRS: MARSHAL 2 REPORTED ALL VEHICLES SAFELY ARRIVED AT THE FIRE STATION. |
| 06:00 | ANGGOTA BERTUGAS MELALUKUKAN KERJA KEKEMASAN BALAI DAN CUCIAN JENTERA. |
| 07:30 | PASUKAN BRAVO MELAKUKAN SERAH TUGAS JENTERA KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK. |
| 08:00 | SAYA 32015 KAMARRUZAMAN PASUKAN BRAVO SFS SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Kamarruzaman Bin Eskhak | Verify by : SFM Mohamad Imran Bin Jamaludin |
|---|---|
| kamarul | ![]() |