SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night January 7, 2026 1 1

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Mohd Jalludin Bin Jamil MRV2
Muhamad Raihan bin A Manap FT5
Muhammad Firdaus Bin Arifin WT
Khairul Najmi Bin Zainal HZ2
Mohd Faidhi Bin Mohd Shamsudin ALP
Muhammad Shahaidil Bin Ami Nuzairi PM2
Muhammad Yusry Haikal bin yusof MRV2
Jumlad Mokhtar Bin Zol DP
Muhammad Najib Bin Mohd Shariff FT5
Mohammad Hanafiah bin Mat Setia -

Staff On Leave

Name Leave Type
Yazulyadi Bin Yahya Sick Leave
Kamarruzaman Bin Eskhak Annual Leave
Mohammad Razali Bin Ahmad Emergency Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO HANAFIAH TERIMA TUGAS OCC DARI PASUKAN CHARLLIE BAIK DAN TERKAWAL

20:05

OCC MEMBUAT UJIAN RADIO BERSAMA ANGGOTA SERTA LAPOR TUGAS RSM,CSM,USM DAN SDM BAIK DANTERKAWAL

20:30

ANGGOTA MEMBUAT UJIAN PERJALANAN JENTERA SERTA PEMERIKSAAN PERALATAN BAIK DAN TERKAWAL

22:00

AKTIVITI THEORY RESFRESHMENT OPERASI CONFONE SPACE RESCUE DIKETUAI OLEH FF KHAIRUL NAJMI BAIK DAN TERKAWAL.

23:23

EMERGENCY DRILL REPORT
HAZMAT (LOPC)
DRILL NO: SD/01/2026
DATE: 07/01/2026
TIME: 2323HRS
LOCATION: ASU (ARGON TANK)
OPU INVOLVE: PGSSB
SENIOR FIRE MARSHALL: EN IMRAN
SHIFT: BRAVO SFS
CALLER NAME: EN SYAHMI (OSC)

2323 HRS: OCC RECEIVED REPORT FROM OSC (EN SYAHMI) VIA DTRS OF EMERGENCY DRILL GAS LEAK. OCC ACTIVATED CEFS SATELLITE STATION, MEDIC TEAM, AND SECURITY TEAM.

2324 HRS: MARSHALL-2 REPORTED CEFS SATELLITE STATION DEPLOYED WITH 11 PERSONNEL AND 7 VEHICLES. OCC INFORMED WIND DIRECTION (NORTH → SOUTH) AND WIND SPEED (5.37 KM/H).

2327 HRS: CEFS TEAM ARRIVED.MARSHALL-2 BEGAN SIZE-UP AND ASSESSMENT.

2330 HRS: MARSHALL-2 CONFIRMED ARGON RELEASE AT ARGON TANK.NO INJURIES.

2333 HRS: CEFS TEAM STARTED CONTROLLING AND CONFINING LEAK USING FT5 GUN DECK (RAIN DOWN).

2335 HRS: MAIN VALVE ISOLATED; LEAK SUCCESSFULLY CONFINED.
2338 HRS: SITUATION UNDER CONTROL.PRESSURE REDUCED TO 10 BAR.

2341 HRS: PRESSURE AT 0 BAR.LEAK FULLY UNDER CONTROL.

2343 HRS: OVERHAUL PROCEDURE INITIATED.

2345 HRS: OVERHAUL TEAM CONFIRMED OXYGEN LEVELS NORMAL.NO HAZARDOUS GASES DETECTED.

2346 HRS: OVERHAUL COMPLETED.ALL CONDITIONS SAFE.

2347 HRS: OSC DECLARED STANDDOWN.

2355 HRS: MARSHALL-2 REPORTED ALL VEHICLES RETURNED TO FIRE STATION.

0005 HRS: MARSHALL-2 CONFIRMED ALL VEHICLES SAFELY ARRIVED AT FIRE STATION

23:51

FT5 DIPANDU RAIHAN BERSAMA NAJIB KE RAPID SITE FSP

00:19

FT5 DIPANDU RAIHAN BERSAMA NAJIB SELAMAT TIBA DI BALAI

07:00

AKTIVITI HOUSKEEPING KEMASAN BALAI DAN JENTERA

08:00

SAYA RO HANAFIAH SERAH TUGAS PADA PASUKAN DELTA BAIK DAN TERKAWAL

Verification

Check by : Mohammad Hanafiah bin Mat Setia Verify by : SFM Mohamad Imran Bin Jamaludin
HANAFI