SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA SFS | Night | December 26, 2025 | 42 | 81 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Mohd Nizam Bin Hj Bakri | RIV3 |
| FM Mohamad Firdaus bin Osman | RIV3 |
| Muhammad Nur Hakim bin Mat Rofi | FT5 |
| Muhamad Faeiz Bin Loso | FT5 |
| Muhammad Rafiq Bin Abdul Razak | MRV2 |
| Mohamad Luqman Bin Bahardin | MRV2 |
| Muhammad Safwan Bin Safre | WT |
| Muhammad Iskandar Bin Ishamudin | DP |
| Nor Faiz Bin Amin | DP |
| Muhammad Syakirin Bin Ghazali | HZ2 |
| Sharif Nur Qayyim bin Sendato | ALP |
| Sharif Nur Qayyim bin Sendato | PM2 |
| Muhammad Faiz Bin Khusnun | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Mohd Ashraf Bin Malim Diman | Annual Leave |
| Mohd Hanis Bin Hj Mohd Salleh | Annual Leave |
| Mohd Syahrul Safwan bin Tuah | Annual Leave |
| Muhammad Anuar Bin Zainal Abidin | Annual Leave |
| FM Wan Noor Hisham Bin Md Sharif | Annual Leave |
| Mohamad Zawawi Bin Mohd Khalid | Emergency Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO FAIZ 32090 TERIMA TUGAS OCC DARI PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:15 | SEMUA ANGGOTA BERTUGAS MELAKUKAN UJIAN KOMUNIKASI WALKIE TALKIE DAN MOBILE SET JENTERA KEPADA OCC |
| 20:46 | FORD DIPANDU FF NOR FAIZ LAPOR KE GATE3 UNTUK TUJUAN TUGAS-TUGAS KHAS. |
| 20:53 | WT DIPANDU FF SAFWAN LAPOR MELAKUKAN ROAD RUNNING TEST DISEKITAR NON-PROSES AREA. |
| 21:00 | WT LAPOR SELAMAT SAMPAI BALAI SATELLITE. |
| 21:18 | FORD LAPOR SELAMAT SAMPAI BALAI SATELLITE. |
| 21:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI KELAS TEORI. |
| 22:33 | EMERGENCY DRILL REPORT 2233HRS: OCC RECIEVED A CALL VIA DTRS FROM CSM (EN AZRI M NOR) INFORMED THAT AN EMERGENCY DRILL JET FIRE OCCURED AT LLDPE TANK FARM. 1IP INVOLVED AT THE SCENE. 2234HRS: OCC ACTIVATED CEFS TEAM, MEDIC BRAVO AND PSCC TO THE LOCATION. 2235HRS: MARSHALL-2 REPORTED 11X PERSONNELS WITH 7X VEHICLES DEPLOYED TO THE LOCATION. 2236HRS: OCC INFORMED TO MARSHALL-2 WIND DIRECTION NORTH TO SOUTH AND WINDSPEED 15KM/H. 2240HRS: MARSHALL-2 REPORTED ALL VEHICLE SAFELY ARRIVED AT LLDPE TANK FARM AND CONFIRM THERE IS JET FIRE INCIDENT. 2241HRS: MEDIC 02, MEDIC 03 AND TEAM PATROLLING SAFELY ARRIVED AT THE LOCATION. 2243HRS: MARSHALL-2 REPORTED THERE IS COMFIRMED EMERGENCY DRILL, SCENARIO JETFIRE INVOLVING 1 IP AT TANK FARM LLDPE (A901). 2244HRS: MARSHALL-2 REPORTED 2 FIX MONITOR USED TO CONTROL THE FIRE AND CEFS TEAM SETUP ATTACKING LINE FOR COOLING AND CLOSE VALVE. 2245HRS: OSC REPORTED PRESSURE REDUCED 100BAR TO 5 BAR. 2246HRS: MARSHALL-2 REPORTED READING FOR THERMAL IMAGE CAMERA IS 30 DEGREE CELCIUS, USING 2 LINES ATTACKING TO CLOSE VALVE AND EXTINGUISH THE FIRE. 2249HRS: MARSHALL-2 REPORTED 4 CEFS TEAM AND 1 OPERATION TEAM START SEARCH AND RESCUE OPERATION. 2251HRS: MARSHALL-2 REPORTED THE IP WAS SUCCESSFULLY RESCUE BY CEFS TEAM AND HANDOVER TO MEDIC TEAM FOR FURTHER TREATMENT. 2253HRS: MARSHALL-2 REPORTED CEFS TEAM SUCCESFULLY EXTINGUISH THE FIRE. 2300HRS: MARSHALL-2 REPORTED 1CEFS PERSONNEL AND 1 OPERATION TEAM PERFORMING OVERHAUL AND GAS CHECK. 2302HRS: MARSHALL-2 REPORTED THE TEMPERATURE IS NORMAL, LEL 0, OXYGEN 20.9% & H2S 0ppm. 2305HRS: ON-SCENE COMMANDER REPORTED TO COMPLETE OVERHAUL AND DECLARED STAND DOWN. 2320HRS: MARSHALL-2 REPORTED ALL VEHICLES BACK TO STATION. 2340HRS: MARSHALL-2 REPORTED CEFS TEAM SAFELY ARRIVED AT SATELLITE FIRE STATION. |
| 06:00 | ANGGOTA BERTUGAS MELAKUKAN PEMBERSIHAN DISEKITAR KAWASAN BALAI SATELLITE. |
| 07:00 | ANGGOTA BERTUGAS MENJALAKAN PERSIAPAN PADA JENTERA DAN ALATAN SEBELUM SERAH TUGAS. |
| 07:30 | SERAH TUGAS JENTERA VEHICLE JOINT INSPECTION. |
| 08:00 | SAYA RO FAIZ 32090 SERAH TUGAS OCC KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Muhammad Faiz Bin Khusnun | Verify by : SFM Mohd Nizam Bin Bakri |
|---|---|
| Faiz | nizam |