Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Day November 22, 2025 39 76

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Mohamad Firdaus bin Osman RIV3
Muhammad Faiz Bin Khusnun FT5
Mohd Syahrul Safwan bin Tuah FT5
Mohamad Zawawi Bin Mohd Khalid MRV2
Sharif Nur Qayyim bin Sendato MRV2
Mohd Hanis Bin Hj Mohd Salleh DP
Muhammad Rafiq Bin Abdul Razak DP
Muhammad Syakirin Bin Ghazali WT
Mohd Ashraf Bin Malim Diman HZ2
Muhammad Anuar Bin Zainal Abidin ALP
Mohamad Luqman Bin Bahardin -

Staff On Leave

Name Leave Type
FM Wan Noor Hisham Bin Md Sharif Annual Leave
Muhammad Iskandar Bin Ishamudin Annual Leave
Muhammad Nur Hakim bin Mat Rofi Annual Leave

Occurrence Book Entry

Time Remarks
08:00

TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK.

08:10

ANGGOTA BERTUGAS MEMBUAT UJIAN WALKIE TALKIE KEPADA OCC DALAM KEADAAN BAIK.

08:20

ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN DALAM KEADAAN BAIK.

08:25

DP DIPANDU RAFIQ BERSAMA HANIS LAPOR MEMBUAT ROUTE RUNNING TEST DI SEKITAR BALAI.

08:45

DP LAPOR SAMPAI BALAI.

09:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI KAWAD KAKI DALAM KEADAAN BAIK.

10:10

ANGGOTA BERTUGAS MEMBUAT KELAS THEORY DALAM KEADAAN BAIK.

14:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PRAKTIKAL DALAM KEADAAN BAIK.

16:22

EMERGENCY DRILL REPORT
FIRE (STRUCTURE FIRE)
DRILL NUMBER: SD/77/2025
DATE: 22/11/2025
TIME: 1622HRS
LOCATION: INTERCONNECTING STEAM CRACKER COMPLEX (UNIT 4155 - 4700)
OPC INVOLVED: PRPC UF
SENIOR FIRE MARSHALL: MR NIZAM HJ BAKRI
SHIFT: DELTA SFS
CALLER: USM SAZALI

1622HRS: OCC RECEIVED A CALL VIA WALKIE TALKIE BY USM SAZALI REGARDING FIRE AT PIPE RACK INTERCONNECTING.

1622HRS: OCC ACTIVATED CEFS PIC (SFS), MEDIC BRAVO AND PSCC TO THE LOCATION.

1623HRS: MARSHALL 2 REPORTED 10X CEFS PIC PERSONNEL AND 6X EMERGENCY VEHICLES DEPLOYED TO THE LOCATION, OCC REPORTED CURRENT WIND DIRECTION IS HEADING FROM NORTH TO SOUTH.

1629HRS: MARSHALL 2 REPORTED CEFS PIC TEAM AND MEDIC BRAVO ARRIVED AT THE LOCATION AND START SIZE UP.

1630HRS: MARSHALL 2 CONFIRMED THAT THE FIRE OCCURE AT PIPE RACK AND NO IP.

1631HRS: MARSHALL 2 REPORTED CEFS TEAM SET UP THE GROUND MONITOR FROM FT5 TO COOLING PIPE RACK TO REDUCE PRESSURE FROM 50 BAR TO 10 BAR.

1648HRS: MARSHALL 2 REPORTED THE FIRE FULLY EXTINGUISHED AND FM 2 WITH 2X CEFS PERSONNEL AND 1X OPERATION TEAM START DOING OVERHAUL.

1649HRS: MARSHALL 2 REPORTED OVERHAUL PROCEDURE IS COMPLETED AND THE AREA IS SAFE FROM ANY DANGER AND NO IP.

1651HRS: OSC DECLARED STAND DOWN.

1652HRS: ALL VEHICLES RETURNED TO THE STATION.

1659HRS: CEFS TEAM SAFELY ARRIVED AT SATELITE FIRE STATION.

17:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PT PETANG DALAM KEADAAN BAIK.

18:45

SEMUA ANGGOTRA BERTUGAS MELAKUKAN PEMBERSIHAN BALAI.

19:30

SEMUA ANGGOTA BERTUGAS MEMBUAT SERAHAN TUGAS DAN JENTERA KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK.

20:00

SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK.

Verification

Check by : Mohamad Luqman Bin Bahardin Verify by : SFM Mohd Nizam Bin Bakri