Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night November 11, 2025 37 73

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Mohammad Adib Syahmi Bin Amri RIV3
Khairul Najmi Bin Zainal MRV2
Wan Amirul Syafiq bin Wan Azlan FT5
Muhammad Yusof Bin Mohd Yasin DP
Mohd Jalludin Bin Jamil WT
Yazulyadi Bin Yahya HZ2
Kamarruzaman Bin Eskhak ALP
Mohammad Razali Bin Ahmad PM2
Muhammad Yusry Haikal bin yusof MRV2
Muhammad Najib Bin Mohd Shariff FT5
Muhamad Raihan bin A Manap -

Staff On Leave

Name Leave Type
Mohd Faidhi Bin Mohd Shamsudin Annual Leave
Muhammad Shahaidil Bin Ami Nuzairi Annual Leave
Mohammad Hanafiah bin Mat Setia Un-recorded Leave (URL)

Occurrence Book Entry

Time Remarks
20:00

SAYA RO RAIHAN TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL.

20:10

OCC MEMBUAT UJIAN DTRS SERTA LAPOR KEKUATAN ANGGOTA BERTUGAS KEPADA RSM, CSM DAN USM DENGAN BAIK.

20:15

SEMUA ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN PERALATAN DAN JENTERA SERTA MEMBUAT UJIAN DTRS KEPADA OCC DENGAN BAIK.

21:30

SEMUA ANGGOTA BERKUMPUL DI BILIK LATIHAN UNTUK MEMBUAT AKTIVITI KELAS TEORI.

22:30

SEMUA ANGGOTA BERKUMPUL DI ENJIN BAY UNTUK MEMBUAT AKTIVITI PRAKTIKAL.

06:49

EMERGENCY DRILL REPORT PUMP FIRE (3610 V100 RAFINATE 3)
DRILL NUMBER: SD/73/2025
DATE: 12/11/2025
TIME: 0649HRS
LOCATION: PC INA (V-100)
OPC INVOLVED: PC INA
SENIOR FIRE MARSHAL: EN IMRAN JAMALUDIN
SHIFT: BRAVO SFS
CALLER: EN HASRUL (CCR PC INA)

0649 HRS: INCIDENT REPORTED BY EN. HASRUL VIA HOTLINE REGARDING A FIRE AT V100 LOADING AREA

0650 HRS: OCC ACTIVATED CEFS TEAM (SFS), MEDIC 03, AND SECURITY TEAM

0651 HRS: WIND DIRECTION RECORDED SE ➝ NW AT 11KM/H

0656 HRS: CEFS TEAM AND MEDIC 03 SAFELY ARRIVED ON-SITE

0657 HRS: CEFS TEAM BEGAN SIZE-UP, CONFIRMED FIRE AT 3610 V100 (RAFINATE 3 PRODUCT)

0659 HRS: MARSHALL 2 REPORTED THAT THE CEFS TEAM WAS PERFORMING COOLING OPERATIONS USING GUN DECK AND THE FIRE WAS UNDER CONTROL

0700 HRS: MARSHALL 2 REPORTED HANDOVER OSC NIGHT SHIFT (EN HILMAN) TO DAY SHIFT (EN SUHAIRI).

0701 HRS: MARSHALL 2 REPORTED CURRENT TEMPERATURE 180 DEG C.

0703 HRS: MARSHALL 2 REPORTED THAT THE VALVE HAD BEEN ISOLATED BY THE PANEL MAN, WITH THE CURRENT PRESSURE AT 5.9 BAR.

0704 HRS: MARSHALL 2 REPORTED CURRENT TEMPERATURE DROP TO 75 DEG C.

0710 HRS: MARSHALL 2 REPORTED PRESSURE INSIDE DROP TO 1 BAR.

0718 HRS: MARSHALL 2 REPORTED OPERATION IS UNDER CONTROL AND TEMPERATURE BACK TO NORMAL.

0720 HRS: MARSHALL 2 REPORTED TWO CEFS PERSONNEL AND TWO OPERATIONS TEAM MEMBER WERE PERFORMING OVERHAUL PROCEDURES

0722 HRS: MARSHALL 2 REPORTED THAT OVERHAUL WAS COMPLETED AND TEMPERATURE HAD RETURNED TO NORMAL CONDITIONS.

0723 HRS: OSC DECLARED OPERATION STAND DOWN

0725 HRS: ALL VEHICLES ENROUTE TO STATION

0732 HRS: ALL VEHICLES ARRIVED SAFELY SATELLITE AT FIRE STATION

08:00

SAYA RO RAIHAN SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhamad Raihan bin A Manap Verify by : SFM Mohamad Imran Bin Jamaludin
RAIHAN