SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Day | October 25, 2025 | 32 | 69 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Mohamad Imran Bin Jamaludin | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Muhammad Yusry Haikal bin yusof | MRV2 |
| Mohd Faidhi Bin Mohd Shamsudin | FT5 |
| Che Mohd Azmi Bin Che Loddin | DP |
| Muhamad Raihan bin A Manap | WT |
| Jumlad Mokhtar Bin Zol | HZ2 |
| Khairul Najmi Bin Zainal | ALP |
| Yazulyadi Bin Yahya | PM2 |
| Mohd Jalludin Bin Jamil | MRV2 |
| Muhammad Najib Bin Mohd Shariff | FT5 |
| Mohammad Razali Bin Ahmad | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Muhammad Shahaidil Bin Ami Nuzairi | Sick Leave |
| Kamarruzaman Bin Eskhak | Annual Leave |
| Mohammad Hanafiah bin Mat Setia | Un-recorded Leave (URL) |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 08:01 | RO TERIMA TUGAS OCC DARIPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL |
| 08:06 | OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM |
| 08:15 | ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC |
| 08:18 | ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI |
| 08:37 | HZT 2 DIPANDU MOKHTAR KELUAR ROUTE RUNNING |
| 08:45 | HZT 2 TIBA DI SFS |
| 09:30 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI LATIHAN KAWAD KAKI |
| 10:15 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI ITM (HAZMAT STORE HOUSEKEEPING) |
| 14:59 | OCC RECEIVED A CALL VIA RADIO TRUNK REGARDING CAUSTIC PRODUCT SPILL AT PCINA |
| 14:59 | OCC ACTIVATED CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION |
| 14:59 | MARSHALL 2 REPORTED THAT CEFS TEAM WAS DEPLOYED TO THE SCENE |
| 15:05 | MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA |
| 15:06 | OSC CONFIRM CAUSTIC PRODUCT LEAK |
| 15:16 | MARSHALL 2 REPORT CEFS TEAM SETUP HAZMAT EQUIPMENTAND PROCEDURE ON SITE |
| 15:17 | MARSHALL 2 REPORTED 2 CEFS PERSONNEL AND 2 ERT PERSONNEL ENTERING THE SCENE |
| 15:21 | FM 2 REPORTED CEFS TEAM FOUND LEAK ON 2.5 INCH PIPE AND START THE CLAMPING PROCEDURE |
| 15:24 | : MARSHALL 2 REPORT CLAMPING PROCEDURE COMPLETE AND NO MORE PRODUCT RELEASE |
| 15:27 | MARSHALL 2 REPORTED CEFS START DECONTAMINATION PROCEDURE |
| 15:29 | MARSHALL 2 REPORTED OVERHAULL TEAM 2 ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE |
| 15:30 | : FM 2 REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.1%, CO: 0 PPM) AND NO MORE PRODUCT LEAK ON THE SCENE |
| 15:31 | MARSHALL 2 REPORTED OVERHAULL TEAM WITHDRAW FROM THE SCENE |
| 15:33 | OSC DECLARE OPERATION STAND DOWN |
| 15:47 | MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION |
| 15:53 | MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION |
| 17:20 | ALP DIPANDU NAJMI BERSAMA YUSRY KELUAR KE MFS |
| 17:35 | ALP TIBA DI SFS |
| 17:45 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI RIADAH PETANG |
| 18:45 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR SFS |
| 19:30 | HANDOVER DUTY/JOIN INSPECTION BERSAMA PASUKAN ALPHA |
| 20:00 | RO SERAH TUGAS OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Mohammad Razali Bin Ahmad | Verify by : SFM Mohamad Imran Bin Jamaludin |
|---|---|
| Razali | ![]() |