SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Day October 25, 2025 32 69

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Muhammad Yusry Haikal bin yusof MRV2
Mohd Faidhi Bin Mohd Shamsudin FT5
Che Mohd Azmi Bin Che Loddin DP
Muhamad Raihan bin A Manap WT
Jumlad Mokhtar Bin Zol HZ2
Khairul Najmi Bin Zainal ALP
Yazulyadi Bin Yahya PM2
Mohd Jalludin Bin Jamil MRV2
Muhammad Najib Bin Mohd Shariff FT5
Mohammad Razali Bin Ahmad -

Staff On Leave

Name Leave Type
Muhammad Shahaidil Bin Ami Nuzairi Sick Leave
Kamarruzaman Bin Eskhak Annual Leave
Mohammad Hanafiah bin Mat Setia Un-recorded Leave (URL)

Occurrence Book Entry

Time Remarks
08:01

RO TERIMA TUGAS OCC DARIPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL

08:06

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM

08:15

ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC

08:18

ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI

08:37

HZT 2 DIPANDU MOKHTAR KELUAR ROUTE RUNNING

08:45

HZT 2 TIBA DI SFS

09:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI LATIHAN KAWAD KAKI

10:15

ANGGOTA BERTUGAS MEMBUAT AKTIVITI ITM (HAZMAT STORE HOUSEKEEPING)

14:59

OCC RECEIVED A CALL VIA RADIO TRUNK REGARDING CAUSTIC PRODUCT SPILL AT PCINA

14:59

OCC ACTIVATED CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION

14:59

MARSHALL 2 REPORTED THAT CEFS TEAM WAS DEPLOYED TO THE SCENE

15:05

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA

15:06

OSC CONFIRM CAUSTIC PRODUCT LEAK

15:16

MARSHALL 2 REPORT CEFS TEAM SETUP HAZMAT EQUIPMENTAND PROCEDURE ON SITE

15:17

MARSHALL 2 REPORTED 2 CEFS PERSONNEL AND 2 ERT PERSONNEL ENTERING THE SCENE

15:21

FM 2 REPORTED CEFS TEAM FOUND LEAK ON 2.5 INCH PIPE AND START THE CLAMPING PROCEDURE

15:24

: MARSHALL 2 REPORT CLAMPING PROCEDURE COMPLETE AND NO MORE PRODUCT RELEASE

15:27

MARSHALL 2 REPORTED CEFS START DECONTAMINATION PROCEDURE

15:29

MARSHALL 2 REPORTED OVERHAULL TEAM 2 ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE

15:30

: FM 2 REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.1%, CO: 0 PPM) AND NO MORE PRODUCT LEAK ON THE SCENE

15:31

MARSHALL 2 REPORTED OVERHAULL TEAM WITHDRAW FROM THE SCENE

15:33

OSC DECLARE OPERATION STAND DOWN

15:47

MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION

15:53

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION

17:20

ALP DIPANDU NAJMI BERSAMA YUSRY KELUAR KE MFS

17:35

ALP TIBA DI SFS

17:45

ANGGOTA BERTUGAS MEMBUAT AKTIVITI RIADAH PETANG

18:45

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR SFS

19:30

HANDOVER DUTY/JOIN INSPECTION BERSAMA PASUKAN ALPHA

20:00

RO SERAH TUGAS OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL

Verification

Check by : Mohammad Razali Bin Ahmad Verify by : SFM Mohamad Imran Bin Jamaludin
Razali