Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Day October 24, 2025 68 32

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Muhammad Yusry Haikal bin yusof MRV2
Khairul Najmi Bin Zainal FT5
Yazulyadi Bin Yahya DP
Mohd Jalludin Bin Jamil WT
Kamarruzaman Bin Eskhak HZ2
Muhammad Safwan Bin Safre ALP
Muhammad Azfar Bin Anuar PM2
Muhammad Hadi Bin Hamma MRV2
Muhammad Najib Bin Mohd Shariff FT5
Mohammad Razali Bin Ahmad -

Staff On Leave

Name Leave Type
Muhamad Raihan bin A Manap Annual Leave
Mohd Faidhi Bin Mohd Shamsudin Annual Leave
Muhammad Shahaidil Bin Ami Nuzairi Sick Leave
Mohammad Hanafiah bin Mat Setia Un-recorded Leave (URL)

Occurrence Book Entry

Time Remarks
08:00

RO M RAZALI TERIMA TUGAS OCC DARIPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL

08:02

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM

08:10

ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC

08:15

ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI

08:32

ALP DI PANDU SAFWAN KELUAR ROUTE RUNNING

08:36

MRV 2 DI PANDU YUSRI BERSAMA HADI KELUAR ROUTE RUNNING

08:45

ALP TIBA DI SFS

08:50

MRV 2 TIBA DI SFS

09:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI ITM

10:36

OCC RECEIVED A CALL VIA RADIO TRUNK REGARDING WORKERS TRAPPED AT REACTOR 231 LLDPE

10:36

OCC ACTIVATED CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION

10:36

MARSHALL 2 REPORTED THAT CEFS TEAM WAS DEPLOYED TO THE SCENE

10:41

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA

10:45

MARSHALL 2 CONFIRMED 2 WORKERS TRAPPED INSIDE REACTOR 231

10:48

MARSHALL 2 REPORTED 1 IP ALREADY BRING OUT BY ERT

10:50

FM 2 REPORTED OXYGEN VOLUME INSIDE THE REACTOR LOW (16%)

10:53

MARSHALL 2 REPORT 1 IP SUCCESFULLY HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT

10:57

MARSHALL 2 REPORTED 2 CEFS PERSONNEL ENTERED THE REACTOR FOR SEARCH AND RESCUE

11:00

OSC REPORTED RESCUE TEAM FOUND 1 IP INSIDE THE REACTOR

11:04

FM 2 REPORTED OXYGEN VOLUME INSIDE THE REACTOR STILL LOW (16.5%)

11:13

MARSHALL 2 REPORTED IP SUCCESFULLY BRING OUT FROM THE REACTOR AND STABILIZED BY RESCUE TEAM ON THE PLATFORM

11:17

MARSHALL 2 REPORTED IP SUCCESFULLY HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT

11:18

MARSHALL 2 REPORTED 1 AGT AND FM 2 ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE

11:20

MARSHALL 2 REPORTED 1 AGT AND FM 2 ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE

11:21

MARSHALL 2 REPORTED OVERHAULL TEAM WITHDRAW FROM THE SCENE AND VENTILATION PROGRESS STILL CONTINUE INSIDE THE REACTOR

11:24

OSC DECLARE OPERATION STAND DOWN

11:45

MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION

11:56

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION

12:10

ANGGOTA BERTUGAS MEMBUAT AKTIVITI POST MORTERM DRILL DI SFS

15:30

DP DI PANDU HADI BERSAMA AZFAR KELUAR STANDBY DI P7

17:00

DP TIBA DI SFS

17:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI RIADAH PETANG

18:40

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR SFS

19:30

HAND OVER DUTY/ JOIN INSPECTION BERSAMA PASUKAN ALPHA

20:00

RO M RAZALI SERAH TUGAS OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL

Verification

Check by : Mohammad Razali Bin Ahmad Verify by : SFM Mohamad Imran Bin Jamaludin
Razali