SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| CHARLIE SFS | Night | October 13, 2025 | 29 | 66 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Farizuan B Deraman | RIV3 |
| FM Mohamad Naem Bin Sarip | RIV3 |
| Jumlad Mokhtar Bin Zol | MRV2 |
| Muhammad Azfar Bin Anuar | MRV2 |
| Chrysos Eric Lipon | FT5 |
| Muhammad Safwan Bin Safre | FT5 |
| Mohd Azrulnizam bin Mohd Dzulkiflee | WT |
| Muhamad Amir Alif bin Azman | DP |
| Muhamad Faeiz Bin Loso | HZ2 |
| Nor Faiz Bin Amin | HZ2 |
| Che Mohd Azmi Bin Che Loddin | ALP |
| Mohamad Fakaruddin Bin Hamid | PM2 |
| Muhammad Amirul Bin Sulaiman | - |
Staff On Leave
| Name | Leave Type |
|---|
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | OCC AMIRUL TERIMA TUGAS BILIK KAWALAN KEPADA PASUKAN DELTA ASYRAF DIMAN DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:03 | OCC LAPOR KEKUATAN ANGGOTA BERTUGAS KEPADA RSM, USM DAN CSM DALAM KEADAAN BAIK. |
| 20:05 | ANGGOTA BERTUGAS MEMBUAT UJIAN WALKIE TALKIE DAN MEMBUAT PEMERIKSAAN JENTERA KEPADA OCC DALAM KEADAAN BAIK. |
| 20:10 | RIV3 DIPANDU FM NAEM LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK. |
| 20:13 | ALP DIPANDU FF CHE AZMI LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK. |
| 20:13 | FT5 DI PANDU FF ERIC LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK. |
| 20:15 | WT DIPANDU FF AZRULNIZAM LAPOR KELUAR MEMBUAT ROAD RUNNING DI NONPROSES AREA DALAM KEADAAN BAIK |
| 20:23 | MRV2 DIPANDU FF JUMLAD BERSAMA FF HADI LAPOR KELUAR MEMBUAT ROAD RUNNING NONPROSES AREA. |
| 20:23 | RIV3 DIPANDU FM NAEM LAPOR SELAMAT SAMPAI BALAI SATELLITE DALAM KEADAAN BAIK. |
| 20:25 | ALP, FT5, WT LAPOR SELAMAT SAMPAI SATELLITE STATION. |
| 20:27 | MRV2 DIPANDU FF JUMLAD LAPOR SELAMAT SAMPAI SATELLITE STATION. |
| 21:22 | DRILL REPORT |
| 21:22 | OCC RECEIVED A REPORT FROM PCINA VIA HOT LINE INFORMING THAT THERE WAS AN EMERGENCY DRILL AT IOC KO DRUM. 1 X IP INVOLVED. |
| 21:23 | OCC ACTIVATED CEFS SATELLITE STATION, MEDIC TEAM AND PSCC TO THE LOCATION. |
| 21:23 | MARSHALL-2 REPORTED CEFS SATELLITE STATION WITH 13 PERSONNEL AND VEHICLES (RIV3, DP, FT5, WT, HZT2 AND ALP) RESPONSE TO THE LOCATION. OCC INFORMING WIND DIRECTION FROM EAST TO WEST AND WIND SPEED 12KM/H. |
| 21:27 | MARSHALL-2 REPORTED CEFS TEAM ARRIVED AT LOCATION AND PERFORMING SIZE-UP ACTIVITY SURROUNDING THE SUSPECTED LOCATION. |
| 21:28 | MARSHALL-2 CONFIRMED THERE WAS FIRE AT ACTIVATED CARBON FILTER (ACF) (A-902) AREA IOC KO DRUM AND 1 X IP INVOLVED. |
| 21:30 | MARSHALL-2 REPORTED CEFS TEAM EXECUTE COOLING AT SCENE USING 1 X GUNDECK, 1 X GROUND MONITOR FROM FT5 AND 2 X FIXED MONITOR FROM PLANT. |
| 21:31 | MARSHALL-2 REPORTED FIRE IS UNDER CONTROL. |
| 21:32 | MARSHALL-2 REPORTED CEFS TEAM SETUP RESCUE TEAM. |
| 21:33 | MARSHALL-2 REPORTED 2 CEFS PERSONNEL AND 4 ERT ENTERING THE SCENE TO RESCUE THE IP. |
| 21:35 | FM-2 REPORTED IP BEEN FOUND AND RESCUE JOB IS ONGOING. |
| 21:37 | MARSHALL-2 REPORTED IP SUCCESFULLY RESCUED AND HANDED OVER TO MEDIC. |
| 21:39 | MARSHALL-2 REPORTED CURRENT PRESSURE 0.8 BAR AND FIRE HAD BEEN EXTINGUISHED. |
| 21:40 | MARSHALL-2 REPORTED COOLING STILL ONGOING BY USING GUNDECK. |
| 21:42 | MARSHALL-2 REPORTED 1 CEFS PERSONNEL AND 1 ERT ENTERING THE SCENE TO DO GAS CHECK. |
| 21:44 | MARSHALL-2 REPORTED CURRENT PRESSURE IS BACK TO NORMAL AND SITUATION IS UNDER CONTROL. |
| 21:45 | MARSHALL-2 REPORTED 2 CEFS PERSONNEL AND 1 ERT STARTED OVERHAUL PROCEDURE. |
| 21:46 | FM-2 REPORTED THE CURRENT READING OF OXYGEN AT 20.9% LEL 0 AND H2S AT 0 PPM. |
| 21:46 | MARSHALL-2 REPORTED OVERHAUL COMPLETED AND ALL IN SAFE CONDITION. |
| 21:47 | OSC DECLARED STANDDOWN. |
| 21:52 | MARSHALL-2 REPORTED ALL VEHICLES BACK TO FIRE STATION. |
| 22:05 | MARSHALL-2 REPORTED ALL VEHICLES SAFELY ARRIVED AT FIRE STATION. |
| 22:15 | SFM MEMBUAT POSMOTEM SHIFT CHARLIE. |
| 22:20 | TEAM CHARLIE MEMBUAT REFILL SCBA DAN KEBESIHAN JENTERA SELEPAS DIGUNA PAKAI. |
| 02:00 | FF AZRULNIZAM LAPOR OCC BALIK AWAL ATAS URUSAN FAMILY, DAN ATAS KEBENARAN DARI SDM DAN SFM FARIZUAN DALAM KEADAAN BAIK. |
| 06:00 | TEAM CHARLIE MEMBUAT SOLAT SUBUH. |
| 07:00 | TEAM CHARLIE MEMBUAT KERJA-KERJA PEMBESIHAN BALAI DAN JENTERA SEBELUM SERAH TUGAS PADA PASUKAN ALHPA DALAM KEADAAN BAIK. |
| 08:00 | OCC AMIRUL SERAH TUGAS BILIK KAWALAN KEPADA PASUKAN ALHPA DALAM KEADAAN BAIK. |
Verification
| Check by : Muhammad Amirul Bin Sulaiman | Verify by : SFM Farizuan B Deraman |
|---|---|
| AMIERUL | mfarizuan |