Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Night September 20, 2025 24 59

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Wan Noor Hisham Bin Md Sharif RIV3
Mohd Hanis Bin Hj Mohd Salleh FT5
Muhammad Iskandar Bin Ishamudin FT5
Muhammad Rafiq Bin Abdul Razak MRV2
Muhammad Anuar Bin Zainal Abidin MRV2
Mohamad Zawawi Bin Mohd Khalid DP
Mohd Ashraf Bin Malim Diman DP
Muhammad Faiz Bin Khusnun WT
Muhammad Nur Hakim bin Mat Rofi HZ2
Sharif Nur Qayyim bin Sendato ALP
Mohamad Luqman Bin Bahardin -

Staff On Leave

Name Leave Type
Muhammad Syakirin Bin Ghazali Annual Leave
Mohd Syahrul Safwan bin Tuah Annual Leave

Occurrence Book Entry

Time Remarks
20:00

TERIMA TUGAS OCC DARIPADA PASUKAN ALPHA DALAM KEADAAN BAIK.

20:10

ANGGOTA BERTUGAS MEMBUAT UJIAN WALKIE TALKIE KEPADA OCC DALAM KEADAAN BAIK.

20:20

ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN DALAM KEADAAN BAIK.

21:08

FORD DIPANDU HAKIM LAPOR KE GATE 3 UNTUK TUGAS-TUGAS KHAS.

21:30

SEMUA ANGGOTA BERTUGAS MEMBUAT AKTIVITI KELAS THEORY DALAM KEADAAN BAIK.

21:40

FORD LAPOR SAMPAI BALAI.

22:30

SEMUA ANGGOTA BERTUGAS MELAKUKAN AKIVITI PRAKTIKAL DALAM KEADAAN BAIK.

07:00

ANGGOTA BERTUGAS MEMBUAT PEMBERSIHAN BALAI DALAM KEADAAN BAIK ADANYA.

07:30

SEMUA ANGGOTA BERTUGAS MEMBUAT SERAHAN TUGAS DAN JENTERA KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK ADANYA.

08:00

SERAH TUGAS OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohamad Luqman Bin Bahardin Verify by : SFM Mohd Nizam Bin Bakri
nizam