Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night September 9, 2025 23 55

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Yazulyadi Bin Yahya MRV2
Muhammad Yusof Bin Mohd Yasin MRV2
Mohd Jalludin Bin Jamil FT5
Muhammad Najib Bin Mohd Shariff FT5
Mohammad Hanafiah bin Mat Setia DP
Mohd Faidhi Bin Mohd Shamsudin WT
Mohammad Razali Bin Ahmad HZ2
Muhammad Shahaidil Bin Ami Nuzairi ALP
Khairul Najmi Bin Zainal PM2
Kamarruzaman Bin Eskhak -

Staff On Leave

Name Leave Type
Muhammad Yusry Haikal bin yusof Annual Leave
Muhamad Raihan bin A Manap Sick Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA KAMARRUZAMAN 32015 PASUKAN BRAVO SFS TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE SFS DALAM KEADAAN BAIK DAN TERKAWAL.

20:05

OCC LAPOR KEKUATAN ANGGOTA BERTUGAS PASUKAN BRAVO KEPADA RSM, CSM DAN USM.

20:10

ANGGOTA BERTUGAS MELAKUKAN UJIAN WALKIE TALKIE KEPADA OCC.

20:15

ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN.

20:30

FT 5 DIPANDU JALAL BERSAMA NAJIB MELAKUKAN ROAD RUNNING SEKITAR NON-PROCESS AREA.

20:50

FT 5 LAPOR SAMPAI DIBALAI DALAM KEADAAN BAIK.

21:00

RIV 3 DIPANDU FM IZAN BERSAMA MASRSHALL 2 LAPOR KELUAR KE PC INA URUSAN DRILL TABLE TALK.

21:25

EMERGENCY DRILL REPORT (TABLE TOP)
FIRE & EXPLOSION AT BOILER
EMERGENCY DRILL NO: SD/57/2025
DATE: 09/09/2025
TIME: 2125 HRS
LOCATION: PC INA OSB 361
OPU INVOLVED: PC INA
SENIOR FIRE MARSHALL: EN. IMRAN
SHIFT: BRAVO SFS
CALLER NAME: OSC HILMAN

21:25

INCIDENT REPORTED BY EN. HILMAN (OSC) VIA HOTLINE REGARDING A FIRE AND EXPLOSION BOILER A 803

21:26

OCC ACTIVATED CEFS TEAM (SFS), MEDIC 02, AND SECURITY TEAM

21:27

WIND DIRECTION RECORDED SE ➝ NW AT 5.9 KM/H

21:32

CEFS TEAM AND MEDIC 02 SAFELY ARRIVED ON-SITE

21:34

CEFS TEAM BEGAN SIZE-UP, CONFIRMED FIRE AND EXPLOSION

21:36

CEFS TEAM DEPLOYED 1 DECK GUN AND 2 GROUND MONITORS. OPERATOR ISOLATED THE PIPELINE (INITIAL PRESSURE: 22 BAR)

21:41

VALVE FULLY ISOLATED

21:46

PRESSURE REDUCED TO 0 BAR; THERMAL CAMERA SHOWS 40°C

21:48

2 CEFS TEAM & 2 ERT CONDUCTED GAS CHECK AND OVERHAUL

21:50

READINGS—O₂: 20.9%, LEL: 0%, TEMPERATURE NORMAL

21:52

OSC DECLARED OPERATION STAND DOWN

21:58

ALL VEHICLES ENROUTE TO STATION

22:05

ALL VEHICLES ARRIVED SAFELY BACK AT FIRE STATION

22:30

MARSHALL 2 LAPOR KELAS TEORI DAN PRAKTIKAL DI JALANKAN. (RTA)

06:00

ANGGOTA BERTUGAS MELALUKUKAN KERJA KEKEMASAN BALAI DAN CUCIAN JENTERA.

07:30

PASUKAN BRAVO MELAKUKAN SERAH TUGAS JENTERA KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK.

08:00

SAYA 32015 KAMARRUZAMAN PASUKAN BRAVO SFS SERAH TUGAS OCC KEPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Kamarruzaman Bin Eskhak Verify by : SFM Mohamad Imran Bin Jamaludin
KAMARUL