SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Night August 28, 2025 23 54

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Wan Noor Hisham Bin Md Sharif RIV3
Muhammad Rafiq Bin Abdul Razak MRV2
Muhammad Anuar Bin Zainal Abidin MRV2
Mohamad Luqman Bin Bahardin FT5
Muhammad Syakirin Bin Ghazali FT5
Mohd Syahrul Safwan bin Tuah DP
Muhammad Nur Hakim bin Mat Rofi DP
Mohd Hanis Bin Hj Mohd Salleh WT
Mohamad Zawawi Bin Mohd Khalid WT
Mohd Ashraf Bin Malim Diman HZ2
Sharif Nur Qayyim bin Sendato ALP
Muhammad Faiz Bin Khusnun PM2
Muhammad Iskandar Bin Ishamudin -

Staff On Leave

Name Leave Type

Occurrence Book Entry

Time Remarks
20:00

I, RO ISKANDAR (32122), REPORT RECEVING THE TASK OCC FROM RO HAZZIQ MASRI (ALPHA) IN GOOD AND CONTROL CONDITION.

20:15

ALL FIRE FIGHTER TEAM ON DUTY DOING TEST WALKIE-TALKIE WITH THE OCC IN GOOD CONDITION AND CLEAR

20:20

ALL FIRE TRUCK DOING ROUTE RUNNING NEAR AREA SATELITE STATION IN GOOD CONDITION AND CLEAR

20:40

ALL FIRE TRUCK FINISH ROUTE RUNNING NEAR AREA SATELITE STATION IN GOOD CONDITION AND CLEAR

20:44

OCC RECEIVE 1 ORDER FROM CSM HAVE STANDBY AT PP- SPH PLANT. TIME (2130HRS). JOB SCOPE - TO DROP R200 SPOOL. ESTIMATE 1HRS TO STANDBY

21:00

ALL FIRE FIGHTER TEAM ON DUTY DOING CLASS THEORY AT ECC ROOM AND PRACTICAL AT ENGINE BAY

21:10

DP TRUCK- (DRIVER) SYAHRUL / (CO -PILOT) HAKIM MOVING TO STANDBY AT PP- SPH PLANT.

21:30

DP TRUCK- (DRIVER) SYAHRUL / (CO -PILOT) HAKIM ARRIVE AT PP- SPH PLANT.

22:00

ALL FIRE FIGHTER TEAM ON DUTY FINISH DOING PRACTICAL TRAINING AT ENGINE BAY

22:50

TEAM STANDBY REPORT CRITICAL WORKING AT (PP-SPH PLANT) TO DROP R200 SPOOL COMPLETED. PS TELL TEAM STANDBY THE WORK WILL CONTINUE TOMORROW NIGHT AND TEAM STANDBY REPORT OCC BACK TO THE SATELITE STATION.

23:05

DP TRUCK- (DRIVER) SYAHRUL / (CO -PILOT) HAKIM ARRIVE SATELITE STATION

07:00

ALL FIRE FIGHTER TEAM ON DUTY DO CLEAN THE AREA AROUND THE STATION AND EQUIPMENT BEFORE HANDING OVER TO TEAM BRAVO.

07:30

ALL FIRE FIGHTER TEAM ON DUTY DOING HANDOVER WITH SHIFT BRAVO IN GOOD AND CONTROL CONDITION

08:00

I, RO ISKANDAR (32122), REPORT HANDOVER THE TASK OCC TO RO KHAIRUL NAJMI (BRAVO) IN GOOD AND CONTROL CONDITION.

Verification

Check by : Muhammad Iskandar Bin Ishamudin Verify by : SFM Mohd Nizam Bin Bakri
ISKANDAR nizam