Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Day July 16, 2025 20 46

Shift Manning

Name Vehicle
SFM M Saiful Md Isa RIV2
FM Wan Noor Hisham Bin Md Sharif RIV2
Muhammad Rafiq Bin Abdul Razak FT4
Muhammad Faiz Bin Khusnun FT4
Muhammad Syakirin Bin Ghazali MRV2
Mohd Ashraf Bin Malim Diman MRV2
Sharif Nur Qayyim bin Sendato DP
Muhammad Iskandar Bin Ishamudin DP
Mohamad Luqman Bin Bahardin WT
Mohd Hanis Bin Hj Mohd Salleh HZ2
Muhammad Anuar Bin Zainal Abidin ALP
Mohamad Zawawi Bin Mohd Khalid -

Staff On Leave

Name Leave Type
SFM Mohd Nizam Bin Hj Bakri Annual Leave
Mohd Syahrul Safwan bin Tuah Annual Leave
Muhammad Nur Hakim bin Mat Rofi Death of Immediate Family Member

Occurrence Book Entry

Time Remarks
08:00

SAYA 32056 TERIMA TUGAS OCC DARI PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

08:01

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM DALAM KEADAAN BAIK.

08:09

SEMUA ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN DALAM KEADAAN BAIK DAN TERKAWAL.

08:19

FT5 DIPANDU 32136 DAN ALIF MAINTENANCE KE MAIN STATION UNTUK PERTUKARAN JENTERA DENGAN FT2.

08:31

FT5 DIPANDU ALIF DAN SYAFIQ MAINTENANCE KE VOLVO UNTUK PENYELENGGARAAN.

08:36

DP DIPANDU 32122 MEMBUAT UJIAN PEMANDUAN.

08:42

MARSHALL2 DAN DSC MEMANDU FORD KE OSB 201.

08:47

DP LAPOR SAMPAI BALAI.

09:16

FT2 DIPANDU 32136 BERGERAK KE SATELLITE STATION.

09:57

MARSHALL 2 DAN DSC LAPOR SAMPAI BALAI.

10:01

MRV2 DIPANDU 32132 DAN 32087 MEMBUAT FSP DI PETCHEM SITE.

10:13

STAREX DIPANDU 32086 KELUAR MEMBUAT TUGASAN KHAS.

10:24

MRV2 LAPOR SAMPAI BALAI.

10:29

FT2 DIPANDU 32136 DAN 32090 KE PETRONAS PELALI MENGISI MINYAK.

11:06

MARSHALL 2 LAPOR PENGGANTI 32094 IAITU 32131 TELAH SAMPAI DI SATELLITE STATION.

11:26

STAREX LAPOR SAMPAI BALAI.

11:32

FT2 LAPOR SAMPAI BALAI.

16:04

FT2 DIPANDU 32136 DAN 32090 KE RAPID SITE MEMBUAT FSP.

16:34

FT2 LAPOR SAMPAI BALAI.

18:15

EMERGENCY REPORT
SPECIAL ASSISTANT (BEE)
EMERGENCY NO: SE/21/2025
DATE: 17/07/2025
TIME: 1815 HRS
LOCATION: SPJ
OPC INVOLVED: PRPC UF
SENIOR FIRE MARSHALL: M SAIFUL MD ISA
SHIFT: DELTA SFS
CALLER NAME: MR SAZALI (USM)

18:15

OCC RECEIVE A CALL FROM MR SAZALI (USM) VIA DTRS INFORMING THAT THERE WAS A BEEHIVE AT LEVEL 2 LADDER RTG CRANE.

18:16

OCC ACTIVATED THE CEFS SFS TO THE LOCATION.

18:17

FM-2 REPORTED DEPLOYMENT OF 3 CEFS PERSONNEL WITH EMERGENCY VEHICLE MRV2 TO LOCATION.

18:22

CEFS TEAM ARRIVAL AT THE LOCATION OF THE BEE NEST AND PERFORMING SIZE UP PROSEDURE.

18:23

BEE NEST LOCATED AT LADDER RTG CRANE LEVEL 2, ESTIMATED SIZE ONE FEET WIDTH X ONE FEET HEIGHT.

18:25

SETUP OF 2 RESPONDER IN FULL BEE SUITS WITH 2 BAYGON SPRAYS.

18:28

OPERATION TO REMOVE THE BEE NEST COMMENCED.

18:37

BEE NEST SUCCESFULLY DESTROYED, AREA DECLARED SAFE.

18:38

OVERHAUL PROCEDURES INITIATED.

18:39

OPERATION STAND DOWN DECLARED.

18:40

CEFS TEAM RETURNED TO SFS

18:45

CEFS TEAM SAFELY ARRIVED AT SATELLITE STATION.

18:46

FT5 LAPOR SAMPAI BALAI DARI SERVICE DI VOLVO.

18:51

RIV3 DIPANDU ALIF KE BENGKEL DI BUKIT PELALI UNTUK KERJA-KERJA PEMBAIKAN.

Verification

Check by : Mohamad Zawawi Bin Mohd Khalid Verify by : SFM M Saiful Md Isa
ZAWAWI MSMI