SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night July 14, 2025 20 46

Shift Manning

Name Vehicle
SFM Mohamad Imran Bin Jamaludin RIV3
FM Muhammad Izan Bin Hamzah RIV3
Muhammad Najib Bin Mohd Shariff MRV2
Mohammad Hanafiah bin Mat Setia FT5
Muhamad Raihan bin A Manap DP
Mohammad Razali Bin Ahmad WT
Mohd Faidhi Bin Mohd Shamsudin HZ2
Yazulyadi Bin Yahya ALP
Khairul Najmi Bin Zainal PM2
Muhammad Yusry Haikal bin yusof FT5
Kamarruzaman Bin Eskhak MRV2
Mohammad Mukhlis Bin Azman -

Staff On Leave

Name Leave Type
Muhammad Shahaidil Bin Ami Nuzairi Annual Leave
Mohd Jalludin Bin Jamil Annual Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO 32057 MUKHLIS TERIMA TUGAS OCC DARIPADA OCC PASUKAN CHARLIE DALAM KEADAAN BAIK ADANYA.

20:05

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM DALAM KEADAAN BAIK ADANYA.

20:10

SEMUA ANGGOTA MEMBUAT PEMERIKASAAN JENTERA DAN PERALATAN OPERASI DALAM KEADAAN BAIK ADANYA.

20:15

SEMUA ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC DALAM KEADAAN BAIK ADANYA.

20:20

RIV 3 DIPANDU FM IZAN BERSAMA SFM IMRAN MEMBUAT ROUTE RUNNING TEST DISEKITAR KAWASAN BALAI.

20:23

FT5 LAPOR DIPANDU HANAFIAH BERSAMA YUSRY MEMBUAT ROUTE RUNNING DI SEKITAR KAWASAN BALAI.

20:25

MRV 2 LAPOR DIPANDU NAJIB BERSAMA KAMARRUZAMAN MEMBUAT ROUTE RUNNING DISEKITAR KAWASAN BALAI.

20:28

DP LAPOR DIPANDU RAIHAN MEMBUAT ROUTE RUNNING DISEKITAR KAWASAN BALAI.

20:30

HZT 2 LAPOR DIPANDU FAIDHI MEMBUAT ROUTE RUNNING DI SEKITAR KAWASAN BALAI.

20:33

WT LAPOR DIPANDU RAZALI MEMBUAT ROUTE RUNNING DISEKITAR KAWASAN BALAI.

20:35

ALP LAPOR DIPANDU YAZULYADI MEMBUAT ROUTE RUNNING DISEKITAR KAWASAN BALAI.

21:00

SEMUA JENTERA SAMPAI BALAI.

21:44

OCC RECEIVED ALERT FROM MR. AZHAR ISMAIL.

21:45

CEFS TEAM, PSCC AND MEDIC BRAVO ACTIVATED.

21:46

WIND INFO PROVIDED-DIRECTION: SOUTH TO NORTH, SPEED: 5.9KM/H

21:49

CEFS AND MEDIC TEAMS ARRIVED ON SCENE.

21:53

PENTANE LEAK CONFIRMED.

21:55

ZONING AND WATER CURTAIN OPERATIONS STARTED.

22:01

ENTRY INTO RED ZONE AND SUCCESSFULLY ISOLATE LEAK.

22:07

IP RESCUED, STABILIZED AND HANDED OVER TO MEDIC.

22:30

OVERHAUL PROCEDURE BEGINS BY CEFS TEAM.

22:31

READINGS AT GAS DETECTORS SHOWS NORMAL O2 20.9%, LEL 0 PPM, CO 0 PPM.

22:33

DRILL OFFICIALLY DECLARED STAND DOWN BY OSC.

23:02

VEHICLES RETURN AND SAFELY ARRIVES AT SATELLITE FIRE STATION.

00:00

SEMUA ANGGOTA MEMBUAT KERJA-KERJA HOUSKEEPING DAN PEMBERSIHAN JENTERA DAN KENDERAAN OPERASI.

04:00

RIV3 DIPANDU FM IZAN BERSAMA SFM IMRAN MEMBUAT PEMANTAUAN DI SEKITAR KAWASAN YANG TERLIBAT DENGAN CRT.

06:30

SEMUA ANGGOTA MEMBUAT KERJA-KERJA PEMBERSIHAN DISEKITAR KAWASAN BALAI.

07:30

SEMUA PEMANDU JENTERA MEMBUAT SERAH DAN TERIMA TUGAS KEPADA PASUKAN SETERUSNYA DALAM KEADAAN BAIK ADANYA.

08:00

SAYA RO 32057 MUKHLIS SERAH TUGAS OCC KEPADA OCC SETERUSNYA DALAM KEADAAN BAIK ADANYA.

Verification

Check by : Mohammad Mukhlis Bin Azman Verify by : SFM Mohamad Imran Bin Jamaludin