Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
ALPHA SFS Day July 3, 2025 20 42

Shift Manning

Name Vehicle
SFM M Saiful Md Isa RIV3
FM Mohamad Firdaus bin Osman RIV3
Muhammad Firdaus Bin Arifin MRV2
Mohammad Firdaus Bin Lahadi MRV2
Muhammad Amirul Huda Bin Ibnul Kasim Ahmad FT5
Mohd Hazziq Bin Massri FT5
Muhammad Qurzaini Bin Kamaruzaman WT
Wan Amirul Syafiq bin Wan Azlan DP
Muhammad Yusof Bin Mohd Yasin DP
Mohammad Mukhlis Bin Azman HZ2
Amirul Firdaus bin Amirudin ALP
Mohd Haziq Bin Dali PM2
Razif Ahmad Bin Razali -

Staff On Leave

Name Leave Type
Rushairi Bin Arshad Emergency Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO RAZIF AHMAD TERIMA TUGAS OCC DARIPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERRKAWAL.

08:12

ANGGOTA MELAKUKAN UJIAN DTRS KE OCC

08:15

ANGGOTA MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA OPERASI.

08:16

MRV-2 DIPANDU FF FIRDAUS ARIFFIN BERSAMA FF FIRDAUS LAHADI LAPOR ROUTE TEST.

08:30

MRV-2 LAPOR SAMPAI BALAI.

10:20

EMERGENCY DRILL REPORT
JET FIRE 5220 P-104A (PROPYLENE)
DRILL NO: SD/42/2025
DATE: 03/07/2025
TIME: 1020HRS
LOCATION: AREA 4C 5220
OPC INVOLVED: PPCSB
SENIOR FIRE MARSHALL: EN SAIFUL MD ISA
SHIFT: ALPHA SFS
CALLER NAME: EN ABD HALIM (CSM)

1020HRS: OCC RECEIVED AN EMERGENCY CALL VIA WALKIE TALKIE FROM MR ABD HALIM (CSM) REPORTING PUMP FIRE AT UNIT 5220 AREA 4C P30 AND INVOLVED 1 IP UNCONSCIOUS.

1021HRS: OCC ACTIVATED CEFS TEAM, PSCC AND MEDIC BRAVO TO RESPONSE TO INCIDENT AREA.

1021HRS: MARSHAL-2 REPORTED 12 CEFS PERSONNEL AND 8 EMERGENCY VEHICLES DEPLOYED TO THE SCENE.

1023HRS: OCC NOTIFY MARSHAL-2 WIND DIRECTION (EAST TO WEST) AND WINDSPEED (5.9KM/H).

1027HRS: MARSHAL-2 REPORTED CEFS TEAM ARRIVES AT SCC AND MOVE TO P30.

1035HRS: MARSHAL-2 REPORTED CEFS TEAM ARRIVED AT P30.

1036HRS: MARSHAL-2 REPORTED CEFS TEAM ARRIVED AT LOCATION AND PERFORMING SIZE-UP ACTIVITY SURROUNDING THE SUSPECTED LOCATION.

1038HRS: MARSHAL-2 REPORTED THERE IS CONFIRMED PUMP FIRE AT UNIT 5220 AREA 4C P30 AND INVOLVED 1 IP UNCONSCIOUS.

1039HRS: MARSHAL-2 REPORTED RESPONDER PERFORMING 2 ATTACKING LINE AND GUNDECK FOR COOLING THE PUMP AREA.

1043HRS: MARSHAL 2 REPORTED PUMP LINE HAS BEEN ISOLATED BY OPERATOR CURRENT PRESSURE 40 BAR.

1045HRS: MARSHAL 2 REPORTED CEFS TEAM DEPLOY 1 DECK GUN, 1 UNIT GROUND MONITOR, 2 ATTACKING LINE IN DEFENSIVE MODE.

1046HRS: MARSHAL 2 REPORTED THERMAL CAMERA READING 35°C. PRESSURE REDUCED FROM 40 BAR TO 0 BAR.

1047HRS: MARSHAL 2 REPORTED FIRE SUCCESSFULLY EXTINGUISHED.

1050HRS: OSC REPORTED 1 ERT COLLAPSED AND RESCUE BY CEFS PERSONNEL. IP HANDED OVER TO MEDIC.

1051HRS: OSC REPORTED THE PRESENCE OF 1 INJURED PERSON (IP) AT THE INCIDENT AREA.

1053HRS: MARSHAL-2 REPORTED CEFS TEAM SUCCESSFULLY RESCUED THE IP AND HANDED TO MEDIC TEAM FOR FURTHER TREATMENT.

1055HRS: MARSHAL-2 REPORTED THE RESPONDERS PERFORMING OVERHAUL AND GAS CHECK READINGS: TEMPERATURE NORMAL, LEL 0, OXYGEN 20.9%, H₂S 0 PPM.

1057HRS: MARSHAL-2 REPORTED OVERHAUL COMPLETED; STAND DOWN DECLARED BY OSC.

1113HRS: MARSHAL-2 REPORTED ALL VEHICLES REPORTED BACK TO THE FIRE STATION.

1125HRS: MARSHAL-2 REPORTED ALL VEHICLES SAFELY ARRIVED AT THE FIRE STATION.

12:12

FORD DIPANDU FF YUSOF LAPOR ME MG-3.

12:42

FORD LAPOR SAMPAI BALAI.

15:15

CSM LAPOR MEMERLUKAN ANGGOTA CEFS DAN 1X JENTERA KE 4A UNTUK STANDBY. AKTIVITI ISOLATION.

15:33

DP DIPANDU FF WAN AMIRUL BERSAMA FF YUSOF LAPOR KE AREA 4A.

15:43

DP LAPOR SAMPAI AREA 4A.

16:00

STANDBY TEAM LAPOR SITUASI TIDAK MENGIZINKAN DISEBABKAN ADA KEBOCORAN KECIL DAN SUHU TINGGI DI FURNACE. 600 C
STANDBY TEAM LAPOR BALIK BALAI.

16:14

DP LAPOR SAMPAI BALAI.

16:15

MRV-2 DIPANDU FF FIRDAUS ARIFFIN BESAMA FF FIRDAUS LAHADI LAPOR MELAKUKAN PATROLLING KE CRACKER AREA.

16:45

MRV-2 LAPOR SAMPAI BALAI.

17:34

WT DIPANDU FF QURZAINI BERSAMA FF FIRDAUS LAHADI LAPOR KE PETRONAS BUKIT PELALI UNTUK PENGISIAN MINYAK.

18:30

WT LAPOR SAMPAI BALAI.

18:45

ANGGOTA MELAKUKAN HOUSEKEEPING SISEKITAR BALAI.

19:30

ANGGOTA MELAKUKAN AKTIVITI SERAHAN TUGAS/JENTERA KE PASUKAN DELTA.

20:00

SAYA RO RAZIF SERAH TUGAS OCC KE PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Razif Ahmad Bin Razali Verify by : SFM M Saiful Md Isa
razifahmad MSMI