Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
DELTA SFS Night June 25, 2025 19 38

Shift Manning

Name Vehicle
SFM Mohd Nizam Bin Hj Bakri RIV3
FM Wan Noor Hisham Bin Md Sharif RIV3
Mohamad Luqman Bin Bahardin FT5
Muhammad Rafiq Bin Abdul Razak FT5
Muhammad Anuar Bin Zainal Abidin MRV2
Muhammad Syakirin Bin Ghazali MRV2
Mohd Hanis Bin Hj Mohd Salleh DP
Mohamad Zawawi Bin Mohd Khalid DP
Muhammad Iskandar Bin Ishamudin WT
Mohd Ashraf Bin Malim Diman HZ2
Muhammad Nur Hakim bin Mat Rofi HZ2
Sharif Nur Qayyim bin Sendato ALP
Muhammad Faiz Bin Khusnun PM2
Mohd Syahrul Safwan bin Tuah -

Staff On Leave

Name Leave Type

Occurrence Book Entry

Time Remarks
20:00

SAYA RO 32005 TERIMA TUGAS DARI RO PASUKAN ALPHA DALAM BAIK DAN TERKAWAL.

20:10

SAYA RO 32005 LAPOR KEKUATAN ANGGOTA DAN JENTERA KEPADA RSM,CSM DAN USM.

20:20

PASUKAN DELTA DI KETUAI SFM NIZAM MEMBUAT UJIAN DAN PEMERIKSAAN PERALATAN OPERASI BAIK SEADANYA.

20:30

PASUKAN DELTA MEMBUAT UJIAN DTRS KEPADA OCC.

21:22

EMERGENCY DRILL REPORT
(HAZMAT) CAUSTIC SOLUTION SPILLAGE
DRILL NO: SD/39/2025
DATE: 25/06/2025
TIME: 2122 HRS
LOCATION: UNIT 2160-SCU
OPC INVOLVED: PREFCHEM
SFM: EN.M NIZAM HJ BAKRI
SHIFT: DELTA SFS
CALLER NAME: EN. ZAIDI (CSM)

2122 HRS – OCC RECEIVED A CALL FROM EN. ZAIDI (CSM) REPORTING AN EMERGENCY CHEMICAL SPILAGE CAUSTIC SOLUTION AT UNIT 2160-SCU.

2123 HRS – OCC ACTIVATED CEFS PIC TEAM FROM THE SATELLITE FIRE STATION. MEDIC BRAVO 01/02 AND PSCC TEAM WERE ALSO DEPLOYED TO THE LOCATION.

2123 HRS – OCC INFORMED WIND DIRECTION WAS FROM SOUTH TO NORTH, WITH A WIND SPEED OF 5.9 KM/H.

2126 HRS – MARSHALL-2 REPORTED CEFS TEAM AND VEHICLES HAD ARRIVED AT THE INCIDENT LOCATION.

2136 HRS – MARSHALL-2 REPORTED CEFS TEAM ACTIVATED HAZMAT PROTOCOL. THE TEAM CONDUCTED SIZE-UP AND ESTABLISHED INCIDENT ZONING.

2138 HRS- OSC ZAIDI DECLARED RELOCATION MEDIC, CEFS TEAM AND SECURITY TEAM DUE TO DOWN WIND SITUATION.

2142 HRS- OSC DECLARED NEW STAGING AREA ON THIS HAZMAT OPERATIONS.

2144 HRS- MARSHALL-2 REPORTED CEFS TEAM ACTIVATED HAZMAT PROTOCOL. THE TEAM CONDUCTED SIZE-UP AND ESTABLISHED INCIDENT ZONING.

2149 HRS- MARSHALL-2 REPORTED CEFS DECONTAMINATION DIVERS (DD1 & DD2) USED A WATER CURTAIN TO SUPPRESS CHEMICAL VAPORS AT THE DECONTAMINATION CORRIDOR AND DEPLOYED ABSORBENT MATERIALS TO CONTAIN THE SPILLAGE.

2146 HRS – MARSHALL-2 REPORTED TWO (2) CEFS DIVERS (CD1 & CD2) ENTERED THE HOT ZONE AND DISCOVERED ONE (1) UNCONSCIOUS IP (INJURED PERSON).

2152 HRS – MARSHALL-2 REPORTED FM2 AND CEFS DIVERS (CD1 & CD2) SUCCESFULLY HANDOVER IP TO DECONTAMINATION TEAM.

2157 HRS – MARSHALL-2 REPORTED CEFS TEAM SUCCESSFULLY DECONTAMINATION IP.

2159 HRS – MARSHALL-2 REPORTED CEFS TEAM HANDOVER IP TO MEDIC TEAM FOR FURTHER TREATMENT.

2205 HRS – MARSHALL-2 REPORTED ONE (1) CEFS MEMBER AND ONE (1) OPC PERSONNEL CONDUCTED OVERHAUL OPERATIONS.

2212 HRS – MARSHALL-2 REPORTED THE SITUATION AT THE INCIDENT SITE HAD RETURNED TO NORMAL.

2214 HRS – MARSHALL-2 REPORTED THE ON-SCENE COMMANDER DECLARED THE HAZMAT OPERATION STANDDOWN.

2236HRS – MARSHALL-2 REPORTED CEFS TEAM AND VEHICLES DEPARTED FROM THE INCIDENT SCENE BACK TO THE SATELLITE FIRE STATION.

2245 HRS – MARSHALL-2 REPORTED CEFS TEAM AND ALL VEHICLES ARRIVED SAFELY AT THE SATELLITE FIRE STATION.

23:10

PASUKAN DELTA DI KETUAI SFM NIZAM MEMBUAT POSTMORTEM DRILL SD/39/2025 DI ENGINE BAY.

23:50

POSTMORTEM SFM BERSAMA PASUKAN DELTA SELESAI.

07:00

PASUKAN DELTA MEMBUAT KERJA-KERJA PEMBERSIHAN KAWASAN DALAM DAN LUAR BALAI UNTUK SERAHAN TUGAS KEPADA PASUKAN BRAVO.

08:00

SAYA RO 32005 SERAH TUGAS KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Syahrul Safwan bin Tuah Verify by : SFM Mohd Nizam Bin Bakri
Storm nizam