Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night May 27, 2025 16 31

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV3
FM Mohamad Firdaus bin Osman RIV3
Muhammad Yusry Haikal bin yusof MRV2
Muhammad Najib Bin Mohd Shariff MRV2
Kamarruzaman Bin Eskhak WT
Muhammad Shahaidil Bin Ami Nuzairi ALP
Mohammad Hanafiah bin Mat Setia FT5
Mohammad Razali Bin Ahmad PM2
Mohd Jalludin Bin Jamil FT5
Muhamad Raihan bin A Manap HZ2
Mohd Faidhi Bin Mohd Shamsudin DP
Yazulyadi Bin Yahya -

Staff On Leave

Name Leave Type
Khairul Najmi Bin Zainal Annual Leave
FM Muhammad Izan Bin Hamzah Annual Leave

Occurrence Book Entry

Time Remarks
20:00

RO YAZULYADI TERIMA TUGAS OCC DARI RO CHRYSOS ERIC DALAM KEADAAN BAIK.

20:15

ANGGOTA BRAVO MELAKUKAN UJIAN RADIO SETERUSNYA MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI.

20:44

FF YUSRY LAPOR MEMANDU FORD KELUAR MELALUI GATE 2 TUGAS-TUGAS KHAS.

21:05

FM 2 LAPOR ANGGOTA MENJALANKAN AKTIVITI KELAS TEORI ROAD TRAFFIC ACCIDENT (RTA).

21:50

FF YUSRY LAPOR FORD DI PANDU SELAMAT SAMPAI DI BALAI DALAM KEADAAN BAIK.

22:10

FM 2 LAPOR ANGGOTA MENJALANKAN AKTIVITI PRAKTIKAL ROAD TRAFFIC ACCIDENT DALAM KEADAAN BAIK.

22:46

EMERGENCY DRILL REPORT
NITROGEN TANK RELEASE
DRILL NO: SD/32/2025
DATE: 27/05/2025
TIME: 2246HRS
LOCATION: ASU
OPU INVOLVE: PGSSB
SENIOR FIRE MARSHALL: MR SYED SHAHRUL SYED YUSOF
SHIFT: BRAVO SFS
CALLER NAME: EN AINUDIN (OSC)

22:46

OCC RECEIVED A REPORT FROM EN AINUDIN (OSC) VIA DTRS INFORMING THAT THERE WAS AN EMERGENCY DRILL LOPC NITROGEN TANK RELEASE AT PGSSB. NO IP INVOLVED.

22:47

OCC ACTIVATED CEFS SATELLITE STATION, MEDIC TEAM AND SECURITY TEAM TO THE LOCATION.

22:48

MARSHALL 2 REPORTED CEFS PERSONNEL WITH 7 EMERGENCY VEHICLES TO THE LOCATION.

22:49

OCC REPORTED WIND DIRECTION EAST TO WEST, WIND SPEED 5.37 KM/H.

22:53

CEFS TEAM ARRIVED AND BEGAN SIZE-UP.

22:54

NITROGEN TANK RELEASE CONFIRMED. NO INJURIES.

22:56

MARSHALL 2 REPORTED CEFS TEAM INITIATED LEAK CONTROL USING TWO 200 FEET HOSE LINES AND TWO GROUND MONITORS FROM FT 5 TO CONFINE THE NITROGEN RELEASE.

22:59

HEADER VALVE ISOLATED; LEAK SUCCESSFULLY CONFINED.

23:02

PRESSURE REDUCED TO 20 BAR, LEVEL AT 30%.

23:04

PRESSURE REDUCED TO 15 BAR, LEVEL AT 20%.

23:06

PRESSURE REDUCED TO 10 BAR, LEVEL AT 15%. OPERATION UNDER CONTROL.

23:07

PRESSURE REDUCED TO 5 BAR, LEVEL AT 10%.

23:08

PRESSURE REDUCED TO 1 BAR, LEVEL AT 1%.

23:09

PRESSURE REDUCED TO 0 BAR, LEVEL AT 0%.

23:11

OVERHAUL CONDUCTED BY 2 CEFS TEAMS AND 1 OPERATION TEAM.

23:13

ATMOSPHERE READINGS: OXYGEN 20.9%, LEL 0%, NORMAL TEMPERATURE.

23:15

OSC DECLARED STANDDOWN.

23:28

ALL VEHICLES REPORTED BACK TO FIRE STATION.

23:32

ALL VEHICLES SAFELY ARRIVED AT FIRE STATION.

06:00

ANGGOTA BERTUGAS MELAKUKAN KERJA-KERJA HOUSEKEEPING SEKITAR BALAI.

07:30

ANGGOTA BERTUGAS MELAKUKAN PENYERAHAN TUGAS JENTERA KEPADA PASUKAN CHARLIE.

08:00

SAYA RO YAZULYADI SERAH TUGAS OCC KEPADA RO CHRYSOS ERIC DI DALAM KEADAAN BAIK.

Verification

Check by : Yazulyadi Bin Yahya Verify by : SFM Syed Shahrul Bin Syed Yusof
adi