Company Logo

SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night May 19, 2025 13 29

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV3
FM Mohamad Firdaus bin Osman RIV3
Khairul Najmi Bin Zainal HZ2
Yazulyadi Bin Yahya DP
Mohd Faidhi Bin Mohd Shamsudin WT
Muhamad Raihan bin A Manap FT5
Muhammad Yusry Haikal bin yusof MRV2
Muhammad Najib Bin Mohd Shariff MRV2
Mohd Jalludin Bin Jamil FT5
Amirul Firdaus bin Amirudin ALP
Muhammad Shahaidil Bin Ami Nuzairi PM1
Mohammad Razali Bin Ahmad -

Staff On Leave

Name Leave Type
Kamarruzaman Bin Eskhak Annual Leave
FM Muhammad Izan Bin Hamzah Annual Leave

Occurrence Book Entry

Time Remarks
20:00

RO M RAZALI TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL

20:02

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM

20:11

ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC

20:20

ANGGOTA BERTUGAS MAMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI

20:30

MRV2 DIPANDU YUSRY BERSAMA NAJIB KELUAR ROUTE RUNNING

20:38

MRV2 TIBA DI SFS

22:07

OCC RECEIVED A CALL VIA RADIO TRUNK REGARDING A FIRE INCIDENT AT AREA 4B

22:07

OCC ACTIVATED THE CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION

22:07

MARSHALL 2 REPORTED THAT THE CEFS TEAM WAS DEPLOYED TO THE SCENE

22:13

MARSHALL 2 REPORTED THAT THE CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA

22:18

MARSHALL 2 CONFIRMED FIRE EXIST AT COLUMN C105A

22:20

MARSHALL 2 REPORTED THAT THE FIX MONITOR HAS BEEN ACTIVATED BY ERT

22:22

FM 2 REPORTED THAT THE CURRENT TEMPERATURE DETECTED ON THE TIC WAS 180 DEGREES CELSIUS

22:24

MARSHALL 2 REPORT WIND DIRECTION CHANGED FROM NORTHWEST TO SOUTHEAST

22:26

MARSHALL 2 REPORTED CEFS MOVED TO NEW LOCATION

22:29

FM 2 REPROTED CEFS SET UP RESCUE TEAM FOR SAR PROCEDURE

22:31

FM 2 REPORTED CEFS TEAM DEPLOY 1 FIRE FIGHTING LINE TO EXTINGUISH THE FIRE

22:33

MARSHALL 2 REPORT SAR TEAM ENTERING THE SCENE

22:34

FM 2 REPORTED CEFS TEAM FOUND 1 IP AT FIRST FLOOR

22:35

MARSHALL 2 REPORTED THAT THE VALVE SUCCESFULLY ISOLATED BY PANNEL MAN

22:36

MARSHALL 2 REPORTED 1 CEFS PERSONNEL COLLAPSED

22:38

MARSHALL 2 REPORTED IP SUCCESFULLY BRING OUT AND HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT

22:40

OSC REPORTED FIRE FULLY EXTINGUISHED

22:44

MARSHALL 2 REPORTED COLLAPSED IP (CEFS PERSONNEL) SUCCESFULLY BRING OUT AND HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT

22:45

MARSHALL 2 REPORTED 1 ERT TEAM AND 3 CEFS PERSONNEL ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE

22:47

THE OVERHAUL TEAM REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.9%, H2S: 0 PPM) AND THE AREA WAS FREE FROM ANY FIRE HAZARDS

22:47

MARSHALL 2 REPORTED OVERHAULL TEAM WITHDRAW FROM THE SCENE

22:48

: OSC DECLARE OPERATION STAND DOWN

23:00

MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION

23:08

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION

23:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING JENTERA DAN PERALATAN

01:00

ANGGOTA BERTUGAS DALAM KEADAAN STANDBY MODE

06:45

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR SFS

07:30

AKTIVITI HAND OVER DUTY/ JOIN INSPECTION BERSAMA PASUKAN CHARLIE

08:00

RO M RAZALI SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL

Verification

Check by : Mohammad Razali Bin Ahmad Verify by : SFM Syed Shahrul Bin Syed Yusof
Razali