SATELLITE FIRE STATION OCCURRENCE REPORT v2
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Night | May 19, 2025 | 13 | 29 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Syed Shahrul Bin Syed Yusof | RIV3 |
| FM Mohamad Firdaus bin Osman | RIV3 |
| Khairul Najmi Bin Zainal | HZ2 |
| Yazulyadi Bin Yahya | DP |
| Mohd Faidhi Bin Mohd Shamsudin | WT |
| Muhamad Raihan bin A Manap | FT5 |
| Muhammad Yusry Haikal bin yusof | MRV2 |
| Muhammad Najib Bin Mohd Shariff | MRV2 |
| Mohd Jalludin Bin Jamil | FT5 |
| Amirul Firdaus bin Amirudin | ALP |
| Muhammad Shahaidil Bin Ami Nuzairi | PM1 |
| Mohammad Razali Bin Ahmad | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Kamarruzaman Bin Eskhak | Annual Leave |
| FM Muhammad Izan Bin Hamzah | Annual Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | RO M RAZALI TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL |
| 20:02 | OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM |
| 20:11 | ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC |
| 20:20 | ANGGOTA BERTUGAS MAMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI |
| 20:30 | MRV2 DIPANDU YUSRY BERSAMA NAJIB KELUAR ROUTE RUNNING |
| 20:38 | MRV2 TIBA DI SFS |
| 22:07 | OCC RECEIVED A CALL VIA RADIO TRUNK REGARDING A FIRE INCIDENT AT AREA 4B |
| 22:07 | OCC ACTIVATED THE CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION |
| 22:07 | MARSHALL 2 REPORTED THAT THE CEFS TEAM WAS DEPLOYED TO THE SCENE |
| 22:13 | MARSHALL 2 REPORTED THAT THE CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA |
| 22:18 | MARSHALL 2 CONFIRMED FIRE EXIST AT COLUMN C105A |
| 22:20 | MARSHALL 2 REPORTED THAT THE FIX MONITOR HAS BEEN ACTIVATED BY ERT |
| 22:22 | FM 2 REPORTED THAT THE CURRENT TEMPERATURE DETECTED ON THE TIC WAS 180 DEGREES CELSIUS |
| 22:24 | MARSHALL 2 REPORT WIND DIRECTION CHANGED FROM NORTHWEST TO SOUTHEAST |
| 22:26 | MARSHALL 2 REPORTED CEFS MOVED TO NEW LOCATION |
| 22:29 | FM 2 REPROTED CEFS SET UP RESCUE TEAM FOR SAR PROCEDURE |
| 22:31 | FM 2 REPORTED CEFS TEAM DEPLOY 1 FIRE FIGHTING LINE TO EXTINGUISH THE FIRE |
| 22:33 | MARSHALL 2 REPORT SAR TEAM ENTERING THE SCENE |
| 22:34 | FM 2 REPORTED CEFS TEAM FOUND 1 IP AT FIRST FLOOR |
| 22:35 | MARSHALL 2 REPORTED THAT THE VALVE SUCCESFULLY ISOLATED BY PANNEL MAN |
| 22:36 | MARSHALL 2 REPORTED 1 CEFS PERSONNEL COLLAPSED |
| 22:38 | MARSHALL 2 REPORTED IP SUCCESFULLY BRING OUT AND HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT |
| 22:40 | OSC REPORTED FIRE FULLY EXTINGUISHED |
| 22:44 | MARSHALL 2 REPORTED COLLAPSED IP (CEFS PERSONNEL) SUCCESFULLY BRING OUT AND HANDED TO MEDICAL TEAM FOR FURTHURE TREATMENT |
| 22:45 | MARSHALL 2 REPORTED 1 ERT TEAM AND 3 CEFS PERSONNEL ENTERED THE SCENE AREA FOR OVERHAULL PROCEDURE |
| 22:47 | THE OVERHAUL TEAM REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.9%, H2S: 0 PPM) AND THE AREA WAS FREE FROM ANY FIRE HAZARDS |
| 22:47 | MARSHALL 2 REPORTED OVERHAULL TEAM WITHDRAW FROM THE SCENE |
| 22:48 | : OSC DECLARE OPERATION STAND DOWN |
| 23:00 | MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION |
| 23:08 | MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION |
| 23:30 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING JENTERA DAN PERALATAN |
| 01:00 | ANGGOTA BERTUGAS DALAM KEADAAN STANDBY MODE |
| 06:45 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR SFS |
| 07:30 | AKTIVITI HAND OVER DUTY/ JOIN INSPECTION BERSAMA PASUKAN CHARLIE |
| 08:00 | RO M RAZALI SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Mohammad Razali Bin Ahmad | Verify by : SFM Syed Shahrul Bin Syed Yusof |
|---|---|
| Razali | ![]() |