SATELLITE FIRE STATION OCCURRENCE REPORT v2

Shift Shift Cycle Date Emergency Drill
BRAVO SFS Night May 4, 2025 13 25

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV3
FM Muhammad Izan Bin Hamzah RIV3
Muhammad Shahaidil Bin Ami Nuzairi MRV2
Muhammad Yusry Haikal bin yusof MRV2
Mohd Faidhi Bin Mohd Shamsudin FT5
Muhammad Najib Bin Mohd Shariff FT5
Mohammad Hanafiah bin Mat Setia HZ2
Mohd Jalludin Bin Jamil HZ2
Yazulyadi Bin Yahya WT
Khairul Najmi Bin Zainal DP
Kamarruzaman Bin Eskhak ALP
Kamarruzaman Bin Eskhak PM2
Mohammad Razali Bin Ahmad -

Staff On Leave

Name Leave Type
Muhamad Raihan bin A Manap Sick Leave

Occurrence Book Entry

Time Remarks
20:00

RO M RAZALI TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL

20:02

OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM

20:10

ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC

20:20

ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI

21:35

ANGGOTA BERTUGAS MEMBUAT AKTIVITI CLASSROOM THEORY (FAMECA INSULATING RESCUE STICK BY M FAIDHI)

22:10

AKTIVITI CLASSROOM THEORY SELESAI

22:27

OCC RECEIVED A CALL VIA CISCO PHONE FROM CCR 207 REGARDING A FIRE INCIDENT AT PCINA

22:27

OCC ACTIVATED THE CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION

22:27

MARSHALL 2 REPORTED THAT THE CEFS TEAM WAS DEPLOYED TO THE SCENE

22:29

OCC REPORTED THE WIND DIRECTION HEADING FROM NORTHWEST TO SOUTHEAST AND WIND SPEED AT 6KM/H

22:32

MARSHALL 2 REPORTED THAT THE CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA

22:34

MARSHALL 2 CONFIRMED SMOKE COMING OUT FROM THE SUBSTATION BUILDING (CN-01B)

22:35

OSC REPORTED THAT THE ELECTRICAL LOAD HAD ALREADY BEEN TRANSFERRED TO ANOTHER TRANSFORMER

22:39

FM 2 REPORTED THAT THE CEFS TEAM SET UP THE DP TRUCK HOSE REEL AND FIRE EXTINGUISHER BEFORE ENTERING THE BUILDING

22:40

FM 2 REPORTED THAT THE CURRENT TEMPERATURE DETECTED ON THE TIC WAS 100 DEGREES CELSIUS

22:41

FM 2 REPORTED THAT 3 CEFS AND 2 ERT PERSONNEL ENTERED THE BUILDING TO EXTINGUISH THE FIRE

22:43

FM 2 REPORTED THAT THE FIRE HAD BEEN SUCCESSFULLY EXTINGUISHED

22:44

MARSHALL 2 REPORTED THAT 2 ERT TEAM AND 3 CEFS PERSONNEL ENTERED THE SCENE AREA FOR A TEMPERATURE CHECK

22:45

FM 2 REPORTED THAT THE CURRENT TEMPERATURE WAS 50 DEGREES CELSIUS

22:46

MARSHALL 2 REPORTED THAT 1 CEFS TEAM AND 1 ERT TEAM WERE PERFORMING THE OVERHAUL PROCEDURE

22:47

THE OVERHAUL TEAM REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.9%, H2S: 0 PPM) AND THE AREA WAS FREE FROM ANY FIRE HAZARDS

22:48

OSC DECLARE OPERATION STAND DOWN

22:57

MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION

23:03

MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION

23:20

ANGGOTA BERTUGAS MEMBUAT AKTIVITI POST MORTERM DRILL

23:30

AKTIVITI POST MORTERM DRILL SELESAI

23:45

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING PERALATAN DAN PEGISIAN SEMULA TABUNG SCBA

01:00

ANGGOTA BERTUGAS DALAM KEADAAN STANDBY MODE

06:45

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR BALAI

07:30

ANGGOTA BERTUGAS MEMBUAT AKTIVITI HANDOVER DUTY/ JOIN INSPECTION BERSAMA SYIF DELTA

08:00

RO M RAZALI SERAH TUGAS OCC KEPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL

Verification

Check by : Mohammad Razali Bin Ahmad Verify by : SFM Syed Shahrul Bin Syed Yusof
Razali