| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO SFS | Night | May 4, 2025 | 13 | 25 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Syed Shahrul Bin Syed Yusof | RIV3 |
| FM Muhammad Izan Bin Hamzah | RIV3 |
| Muhammad Shahaidil Bin Ami Nuzairi | MRV2 |
| Muhammad Yusry Haikal bin yusof | MRV2 |
| Mohd Faidhi Bin Mohd Shamsudin | FT5 |
| Muhammad Najib Bin Mohd Shariff | FT5 |
| Mohammad Hanafiah bin Mat Setia | HZ2 |
| Mohd Jalludin Bin Jamil | HZ2 |
| Yazulyadi Bin Yahya | WT |
| Khairul Najmi Bin Zainal | DP |
| Kamarruzaman Bin Eskhak | ALP |
| Kamarruzaman Bin Eskhak | PM2 |
| Mohammad Razali Bin Ahmad | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Muhamad Raihan bin A Manap | Sick Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | RO M RAZALI TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL |
| 20:02 | OCC LAPOR TUGAS KEPADA RSM, CSM DAN USM |
| 20:10 | ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC |
| 20:20 | ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN JENTERA DAN PERALATAN OPERASI |
| 21:35 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI CLASSROOM THEORY (FAMECA INSULATING RESCUE STICK BY M FAIDHI) |
| 22:10 | AKTIVITI CLASSROOM THEORY SELESAI |
| 22:27 | OCC RECEIVED A CALL VIA CISCO PHONE FROM CCR 207 REGARDING A FIRE INCIDENT AT PCINA |
| 22:27 | OCC ACTIVATED THE CEFS TEAM FROM THE SATELLITE STATION TO THE LOCATION |
| 22:27 | MARSHALL 2 REPORTED THAT THE CEFS TEAM WAS DEPLOYED TO THE SCENE |
| 22:29 | OCC REPORTED THE WIND DIRECTION HEADING FROM NORTHWEST TO SOUTHEAST AND WIND SPEED AT 6KM/H |
| 22:32 | MARSHALL 2 REPORTED THAT THE CEFS TEAM SAFELY ARRIVED AT THE SCENE AND STARTED TO SIZE UP THE INCIDENT AREA |
| 22:34 | MARSHALL 2 CONFIRMED SMOKE COMING OUT FROM THE SUBSTATION BUILDING (CN-01B) |
| 22:35 | OSC REPORTED THAT THE ELECTRICAL LOAD HAD ALREADY BEEN TRANSFERRED TO ANOTHER TRANSFORMER |
| 22:39 | FM 2 REPORTED THAT THE CEFS TEAM SET UP THE DP TRUCK HOSE REEL AND FIRE EXTINGUISHER BEFORE ENTERING THE BUILDING |
| 22:40 | FM 2 REPORTED THAT THE CURRENT TEMPERATURE DETECTED ON THE TIC WAS 100 DEGREES CELSIUS |
| 22:41 | FM 2 REPORTED THAT 3 CEFS AND 2 ERT PERSONNEL ENTERED THE BUILDING TO EXTINGUISH THE FIRE |
| 22:43 | FM 2 REPORTED THAT THE FIRE HAD BEEN SUCCESSFULLY EXTINGUISHED |
| 22:44 | MARSHALL 2 REPORTED THAT 2 ERT TEAM AND 3 CEFS PERSONNEL ENTERED THE SCENE AREA FOR A TEMPERATURE CHECK |
| 22:45 | FM 2 REPORTED THAT THE CURRENT TEMPERATURE WAS 50 DEGREES CELSIUS |
| 22:46 | MARSHALL 2 REPORTED THAT 1 CEFS TEAM AND 1 ERT TEAM WERE PERFORMING THE OVERHAUL PROCEDURE |
| 22:47 | THE OVERHAUL TEAM REPORTED THAT GAS READINGS IN THE AREA WERE NORMAL (LEL: 0%, OXYGEN: 20.9%, H2S: 0 PPM) AND THE AREA WAS FREE FROM ANY FIRE HAZARDS |
| 22:48 | OSC DECLARE OPERATION STAND DOWN |
| 22:57 | MARSHALL 2 REPORTED CEFS TEAM DEPLOY BACK TO SATELLITE FIRE STATION |
| 23:03 | MARSHALL 2 REPORTED CEFS TEAM SAFELY ARRIVE AT SATELLITE FIRE STATION |
| 23:20 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI POST MORTERM DRILL |
| 23:30 | AKTIVITI POST MORTERM DRILL SELESAI |
| 23:45 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING PERALATAN DAN PEGISIAN SEMULA TABUNG SCBA |
| 01:00 | ANGGOTA BERTUGAS DALAM KEADAAN STANDBY MODE |
| 06:45 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HOUSEKEEPING DI SEKITAR BALAI |
| 07:30 | ANGGOTA BERTUGAS MEMBUAT AKTIVITI HANDOVER DUTY/ JOIN INSPECTION BERSAMA SYIF DELTA |
| 08:00 | RO M RAZALI SERAH TUGAS OCC KEPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Mohammad Razali Bin Ahmad | Verify by : SFM Syed Shahrul Bin Syed Yusof |
|---|---|
| Razali | ![]() |