MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
DELTA MFS Day April 3, 2025 13 11

Shift Manning

Name Vehicle
SFM Haizad Bin Hasan RIV2
FM Muhammad Yazid bin Abd Rahman RIV2
Nur Muhammad Amirull Bin Ahmad Faiza MRV1
Abdul Aidil Akram Bin Abdul Rahman MRV1
Hafizuddin Bin Ngah FT1
Mohamad Sufian Bin Mohd Lazi FT2
Mohd Haziq Bin Mohd Din FT3
Muhammad Khuzairi Bin Jaafar FT4
Ezad Ariff Bin Jamaluddin HZ1
Muhammad Habibul Asyraf Bin Burhan TTL
Muhammad Fakhrul Razin bin Shamsudin PM1
Minimum Manning -
Minimum Manning -
Mohd Sahril Bin Yakub -

Staff On Leave

Name Leave Type
Muhammad Syazwan bin Ibrahim Annual Leave
Mohd Norhafiz Bin Yusoff Annual Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO 32031 TERIMA TUGAS OCC DARI PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

08:06

OCC MEMBUAT UJIAN WALKIE TALKIE KEPADA RSM, USM DAN CSM DALMA KEADAAN BAIK DAN TERKAWAL.

08:14

ANGGGOTA MEMBUAT UJIAN WALKIE TALKIE KEPADA OCC DALAM KEADAAN BAIK.

08:35

TTL DIPANDU HABIBUL MEMBUAT UJIAN PERJALAN DI NO-PROSES AREA.

08:40

MRV DIPANDU AMIRUL BERSAMA AIDIL MEMBUAT UJIAN PERJALAN DI NON-PROSES AREA.

08:50

PM1 DIPANDU RAZIN MEMBUAT UJIAN PERJALAN DI NON-PROSES AREA.

08:51

TTL LAPOR SAMPAI BALAI DAN SETERUSNYA MEMBUAT UJIAN HYDRAULIC.

08:52

FT1 DIPANDU HAFIZUDDIN MEMBUAT UJIAN PERJALAN DI NON-PROSES AREA.

08:53

HAZMAT1 DIPANDU EZAD MEMBUAT UJIAN PERJALAN DI NON-PROSES AREA.

09:00

HAZMAT1 LAPOR SAMPAI BALAI.

09:03

FT1 LAPOR SAMPAI BALAI.

09:10

MRV1 LAPOR SAMPAI BALAI DAN TTL SELESAI MEMBUAT UJIAN HYDRAULIC.

09:30

FM1 LAPOR UNTUK MENGGUNAKAN HYDRANT UNTUK MEMBUAT TEST PUMP FT4 DAN MENDAPAT KEBENARAN USM.

09:55

FM1 LAPOR TEST PUMP FT4 SELESAI.

10:35

FT1 DIPANDU HAFIZUDDIN DAN KHUZAIRI KE TANK 5110 A, UNTUK KERJA-KERJA STANDBY HOTWORK DAN LIFTING.

11:25

PIHAK PT2SB MEMBUAT PANGGILAN UNTUK MEMBUAT SURVEY LEBAH.

11:33

FORD VKP3440 DIPANDU AMIRUL BERSAMA FM YAZID LE PT2SB UNTUK SURVEY LEBAH.

11:50

FORD LAPOR SAMPAI LOKASI.

11:59

FM1 LAPOR AKAN SERAH KERJA-KERJA MEMUSNAHKAN LEBAH KEPADA TEAM CHARLIE PADA SHIFT MALAM.

12:00

FORD VKP3440 LAPOR BERGERAK BALIK BALAI.

12:30

STANDBY TEAM LAPOR KERJA-KERJA DI TANK 5110 A, AKAN BERHENTI REHAT DAN AKAN BERSAMBUNG PADA JAM 1400PM, SETERUSNYA FT1 LAPOR BERGERAK PETRONAS BUKIT PELALI UNTUK PENGISIAN MINYAK DAN BERGERAK BALIK KE BALAI.

13:09

FT1 LAPOR SAMPAI BALAI.

14:09

FT2 DIPANDU RAZIN BERSAMA AMIRUL KE TANK 5110 A, UNTUK KERJA-KERJA STANDBY.

14:16

FT2 SAMPAI LOKASI.

16:35

FT1 DIPANDU HABIBUL BERSAMA EZAD LAPOR KE TANK 5110 A, UNTUK MEMBUAT PERTUKARAN KERJA-KERJA STANDBY.

16:42

FT2 BERGERAK BALIK BALAI.

16:49

FT1 LAPOR SAMPAI LOKASI.

17:23

FF HABIBUL LAPOR FT1 NAIK WARNING ELECTRICAL FAULT, LOSS OF FUNCTIONALITY.

18:25

FT1 LAPOR BERGERAK BALIK BALAI.

18:31

FT1 LAPOR SAMPAI BALAI.

19:30

ANGGOTA DELTA MEMBUAT AKTIVITI SERAH TUGAS DAN KENDERAAN KEPADA ANGGOTA CHARLIE.

20:00

SAYA RO 32031 SERAH TUGAS OCC KEPADA OCC PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Sahril Bin Yakub Verify by : SFM Haizad Bin Hasan