MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO MFS | Night | May 7, 2026 | 22 | 12 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Syed Shahrul Bin Syed Yusof | RIV2 |
| FM Mohamad Firdaus bin Osman | RIV2 |
| Muhammad Syamil Bin Samad | MRV1 |
| Mohd Haziq Bin Dali | CREW MRV1 |
| Mohammad Afiq Bin Shahrom | HZ1 |
| Sharif Nur Qayyim bin Sendato | FT3 |
| Fathul Imran Bin Dol Malek | FT2 |
| Muhammad Khuzairi Bin Jaafar | FT1 |
| Mohamad Luqman Bin Bahardin | TTL |
| Rushairi Bin Arshad | PM1 |
| Muhammad Zakwan Bin Zurin | CREW FT3 |
| Muhammad Iszuan Bin Suhadi | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Che Mohd Azmi Bin Che Loddin | Un-recorded Leave (URL) |
| Nor Faiz Bin Amin | Un-recorded Leave (URL) |
| Ahmad Tarmisham Bin Othman | Un-recorded Leave (URL) |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO ISZUAN TERIMA TUGAS OCC DARIPADA RO FIKRY DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:05 | OCC LAPOR KEKUATAN ANGGOTA KEPADA RSM, CSM, USM DAN PENYELIA LGPC DALAM KEADAAN BAIK. |
| 20:10 | SEMUA ANGGOTA MELAKUKAN UJIAN DTRS KEPADA OCC DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:15 | SEMUA ANGGOTA MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA DALAM KEADAAN BAIK. |
| 20:30 | FORD DI PANDU KHUZAIRI BERSAMA FATHUL KE SUNGAI RENGGIT MELAKUKAN TUGASAN KHAS DALAM KEADAAN BAIK DAN TERKAWAL. |
| 21:11 | SPECIAL ASSISTANCE – BEE (BEEHIVE) 2111 HRS OCC RECEIVED INFORMATION VIA HOTLINE CALL FROM EN. HAFIZ (PANEL MAN) REGARDING A BEEHIVE SIGHTED AT THE PCP AREA. 2111 HRS OCC ACTIVATED CEFS MFS TO RESPOND TO THE REPORTED BEEHIVE INCIDENT. 2112 HRS FM1 REPORTED THAT FOUR (4) CEFS PERSONNEL WERE DISPATCHED TO THE LOCATION WITH ONE (1) RIV 2 AND ONE (1) MRV 1. 2114 HRS FM1 REPORTED THAT THE CEFS RESPONSE TEAM ARRIVED SAFELY AT THE INCIDENT LOCATION. 2116 HRS FM1 CONFIRMED THE PRESENCE OF A BEEHIVE APPROXIMATELY 20 CM IN SIZE AT THE LOCATION. 2118 HRS FM1 REPORTED THAT TWO (2) CEFS PERSONNEL WERE EQUIPPED WITH FULL BEE SUITS WITH TWO (2) BAYGON SPRAY CANS TO COMMENCE BEEHIVE MITIGATION OPERATIONS. 2119 HRS FM1 REPORTED THAT THE CEFS TEAM COMMENCED OPERATIONS TO NEUTRALIZE AND DESTROY THE BEEHIVE. 2125 HRS FM1 REPORTED THAT THE BEEHIVE WAS SUCCESSFULLY DESTROYED AND THE AREA WAS DECLARED SAFE FROM ANY BEE-RELATED THREATS. 2128 HRS FM1 REPORTED THAT OVERHAUL AND SITE INSPECTION ACTIVITIES WERE CARRIED OUT. 2130 HRS OPERATION STAND DOWN, CONFIRMED BY USM AND CEFS PERSONNEL RETURNED TO THE FIRE STATION. 2132 HRS FM1 REPORTED THAT ALL CEFS PERSONNEL SAFELY ARRIVED BACK AT THE MAIN FIRE STATION. |
| 21:45 | FORD LAPOR SAMPAI DI BALAI DALAM KEADAAN BAIK DAN TERKAWAL. |
| 22:14 | TERIMA PANGGILAN ADA LATIHAN KECEMASAN DI PT2SB MENGUNAKAN HOTLINE OLEH EN YUSRY PANEL MAN, SITUASI 1X IP TERSANGKUT DI SCAFFOLDING LATIHAN TERSEBUT TIDAK MELIBATKAN CEFS DAN MEDIC BRAVO HANYA MELIBATKAN PT2SB SAHAJA. |
| 22:30 | KELAS TEORI MENGENAI REAM SEAL FIRE INCIDENT FREQUENCY SURVEY YANG DI SAMPAIKAN OLEH SFM SYED SHAHRUL DALAM KEADAAN BAIK DAN TERKAWAL. |
| 23:30 | SEMUA ANGGOTA MELAKUKAN CUCIAN KERETA EV BYD DALAM KEADAAN BAIK DAN TERKAWAL. |
| 23:50 | SEMUA ANGGOTA MELAKUKAN PENGISIAN PERALATAN FT 4 KE DALAM LOCKER DAN MELAKUKAN CUCIAN FT 4 DALAM KEADAAN BAIK. |
| 06:30 | SEMUA ANGGOTA MELAKUKAN PEMBERSIHAN DAN KEKEMASAN BALAI DALAM KEADAAN BAIK. |
| 08:00 | SAYA RO ISZUAN SERAH TUGAS OCC KEPADA PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Muhammad Iszuan Bin Suhadi | Verify by : SFM Syed Shahrul Bin Syed Yusof |
|---|---|
| iszuan | Shahrul |