Company Logo

MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
BRAVO MFS Night April 21, 2026 18 8

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV2
FM Mohamad Firdaus bin Osman RIV2
Muhammad Zakwan Bin Zurin MRV1
Nor Faiz Bin Amin MRV1
Ahmad Tarmisham Bin Othman FT4
Muhammad Syamil Bin Samad FT3
Mohd Haziq Bin Dali FT2
Fathul Imran Bin Dol Malek FT1
Muhammad Khuzairi Bin Jaafar HZ1
Mohamad Luqman Bin Bahardin PM1
Muhammad Iszuan Bin Suhadi TTL
Rushairi Bin Arshad CREW FT4
Muhammad Fakhrul Razin bin Shamsudin -

Staff On Leave

Name Leave Type
Che Mohd Azmi Bin Che Loddin Annual Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO RAZIN TERIMA TUGAS OCC DARIPADA RO FIKRY SHIFT CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL.

20:15

OCC TERIMA LAPOR TUGAS RSM, CSM, USM DAN LGPC MELALUI APPLIKASI WHATSAPP DAN SETERUSNYA ANGGOTA BRAVO MELAKUKAN UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS.

20:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PEMERIKSAAN JENTERA DAN PERALATAN OPERASI SETIAP KENDERAAN DIKAWASAN BALAI MAIN.

20:38

FM 1 LAPOR FT2 DIPANDU TARMISHAM BERSAMA MRV1 DIPANDU FAIZ DAN ZAKWAN MELAKUKAN PEMANTAUAN LEBAH DI PT2SB.

20:45

FM 1 LAPOR SELAMAT SAMPAI LOKASI LEBAH DI PT2SB.

20:47

JENTERA OPERASI MELAKUKAN AKTIVITI RONDAAN BERKALA DIKAWASAN 'NON-PROCESS' DAN SELAMAT SAMPAI BALAI MAIN.

20:50

STAREX DIPANDU LUQMAN BERSAMA HAZIQ DALI KELUAR KE MAIN GATE 01 UNTUK TUGASAN KHAS DI SG RENGIT.

20:51

EMERGENCY REPORT
SPECIAL ASSISTANCE (BEE)
EMERGENCY NUMBER: ME/19/2026
DATE: 21/04/2026
TIME: 2051HRS
LOCATION: PT2SB (ADMIN BUILDING)
OPC INVOLVED: PT2SB
SENIOR FIRE MARSHALL: EN. SYED SHAHRUL BIN SYED YUSOF
SHIFT: BRAVO MFS
CALLER: EN. CHE WAN FAJERI (SS PT2SB)

2051 HRS: OCC received a call from En. Che Wan Fajeri via Cisco, informing that special assistance was required for bees removal at PT2SB Admin Building.

2052 HRS: OCC activated CEFS MFS team and dispatched them to the location.

2053 HRS: FM 1 reported that 4 CEFS PIC personnel and 2 emergency vehicles were deployed to the incident location.

2102 HRS: FM 1 reported arrival at the PT2SB Admin Building and commenced size-up operations.

2103 HRS: FM 1 confirmed the presence of a bee hive located at the stair area, with an estimated size of 3 ft x 3 ft.

2104 HRS: FM 1 reported that 2 CEFS personnel donned bee suits and were deployed to handle the situation.

2105 HRS: FM 1 reported that the CEFS team began removal of the bee hive using 2 units of insecticide (Bygone).

2107 HRS: FM1 reported that the bee hive was successfully removed and overhaul procedures were carried out.

2109 HRS: FM 1 reported that the CEFS team and emergency vehicles returned to the Main Fire Station.

2115 HRS: FM 1 reported that all personnel and vehicles safely arrived at the Main Fire Station.

21:33

STAREX LAPOR SELAMAT SAMPAI BALAI MAIN DENGAN BAIK.

22:39

EMERGENCY DRILL REPORT
FIRE (JET FIRE)
DRILL NUMBER: MD/09/2026
DATE: 21/04/2026
TIME: 2239 HRS
LOCATION: Unit 1220-V-006 (DHT)
OPC INVOLVED: PRCSB
SENIOR FIRE MARSHAL: En. Syed Shahrul Bin Syed Yusof
SHIFT: Bravo MFS
CALLER: En. Dazirman (RSM)

2239 HRS: OCC received an emergency call from RSM, En. Dazirman via DTRS, reporting a jet fire at Unit 1220-V-006 (DHT).

2240 HRS: OCC activated the CEFS Team, Medic Bravo, and PSCC.

2241 HRS: Marshall 1 reported that the CEFS Team had been deployed to the scene with 8 vehicles and 12 personnel.

2245 HRS: CEFS Team arrived at the incident location.

2246 HRS: Marshall 1 confirmed a jet fire at Unit 1220-V-006 (DHT). The CEFS Team commenced size-up operations.

2249 HRS: Marshall 1 reported that the CEFS Team deployed a gun deck monitor to attack the fire at the top flange. The OSC instructed the isolation of the remaining product.

2250 HRS: FM1 reported a temperature reading of 45°C using TIC equipment.

2252 HRS: Marshall 1 reported that the situation was under control. Fire trucks maintained cooling operations in defensive mode. OSC reported product level at 10%.

2257 HRS: Marshall 1 reported atmospheric readings at the incident area as LEL:0%,Oxygen: 20.9%, H₂S: 0 ppm

2303 HRS: Marshall 1 reported that the OSC, FM1, and two operations personnel conducted overhaul activities and gas monitoring.

2306 HRS: Marshall 1 reported that overhaul activities were completed. All personnel exited the incident area safely.

2311 HRS: OSC reported declare stand down.

2325 HRS: All vehicles returned to the Main Fire Station.

2333 HRS: CEFS Team arrived safely at the Main Fire Station.

00:05

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MEMBERSIHKAN JENTERA OPERASI DI ENJIN BAY BALAI MAIN.

06:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MEMBERSIHKAN KAWASAN BALAI UNTUK SERAH TUGAS KEPADA SHIFT DELTA.

07:00

STAREX DIPANDU HAZIQ KE MAIN GATE 01 UNTUK PENGAMBILAN ANGGOTA SHIFT DELTA YANG BERTUGAS PADA WAKTU PAGI.

07:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI SERAH TUGAS JENTERA OPERASI KEPADA ANGGOTA DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

08:00

SAYA RO RAZIN SERAH TUGAS OCC KEPADA RO SHIFT DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhammad Fakhrul Razin bin Shamsudin Verify by : SFM Syed Shahrul Bin Syed Yusof
Fakhrul Razin shahrul