MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Night | February 27, 2026 | 13 | 4 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Haizad Bin Hasan | |
| FM Muhammad Yazid bin Abd Rahman | |
| Mohd Norhafiz Bin Yusoff | |
| Abdul Aidil Akram Bin Abdul Rahman | |
| Muhammad Fakhrul Razin bin Shamsudin | |
| Muhammad Habibul Asyraf Bin Burhan | |
| Mohamad Farid Bin Ahmad | |
| Hafizuddin Bin Ngah | |
| Mohd Haziq Bin Mohd Din | |
| Muhammad Syazwan bin Ibrahim | |
| Mohamad Sufian Bin Mohd Lazi | |
| Mohd Sahril Bin Yakub | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Muhammad Khuzairi Bin Jaafar | Hospitalization Leave |
| Ezad Ariff Bin Jamaluddin | Annual Leave |
| Nur Muhammad Amirull Bin Ahmad Faiza | Sick Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO 32031 TERIMA TUGAS OCC DARI PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:15 | ANGGOTA MEMBUAT UJIAN WALKIE TALIKE KEPADA OCC. |
| 20:30 | ANGGOTA MEMBUAT PEMERIKSAAN PERALATAN DAN JENTERA. |
| 21:30 | ANGGOTA MEMBUAT SOLAT TERAWIH DIKETUAI FF HAFIZUDDIN. |
| 21:45 | FORD DIPANDU SUFIAN LAPOR KE SUNGAI RENGIT UNTUK KERJA-KERJA KHAS. |
| 22:30 | ANGGOTA MEMBUAT KELAS DIKETUAI SFM HAIZAD. |
| 23:05 | EMERGENCY DRILL REPORT 2305HRS: OCC RECEIVED A CALL FROM MR AKHMAR (RSM) THERE WAS AN EMERGENCY DRILL AT AREA 1512 (HPU-2), Area 2B SCENARIO FLANGE LEAK FIRE. 2306HRS: OCC ACTIVATED CEFS TEAM, MEDIC BRAVO & PSCC TO THE LOCATION. 2306HRS: MARSHALL 1 REPORTED CEFS MFS DEPLOYED TO THE LOCATION. 2307HRS: MEDIC 03 & PSCC REPORTED DEPLOYED TO THE LOCATION. 2309HRS: MARSHALL 1 REPORTED CEFS MFS ARRIVED AT THE LOCATION. 2310HRS: MARSHALL 1 CONFIRMED THERE IS AN EMERGENCY DRILL AT LOCATION, SCENARIO FLANGE LEAK FIRE. WITH NO IP INVOLVED. 2313HRS: MARSHALL 1REPORTED REACTORS 303 SHUT DOWN AND WILL WAITING PRESSURE DROP FOR INJECT N2. 2314HRS: MARSHALL 1 REPORTED CEFS TEAM SETUP 300FT ATTACKING LINE TO CONTROL FIRE. 2315HRS: MARSHALL 1 REPORTED TEMPERATURE 83 DEG C. 2316HRS: MARSHALL 1 REPORTED STILL CONTINUE COOLING REACTOR 303. 2321HRS: MARSHALL 1 REPORTED FM 1 DIRECT ERT FOR BACKOFF FROM LOCATION TO WEAR A COMPLETE PPE. 2322HRS: MARSHALL 1 REPORTED CUREENT PRESSURE DROP TO 0 BAR AND CEFS TEAM DOING EXTINGUISHING FIRE. 2324HRS: MARSHALL 1 REPORTED FIRE ALREADY BEEN EXTINGUISHED AND STILL COOLING BEFORE OPERATION TEAM WILL BE OPEN VALVE N2. 2325HRS: MARSHALL 1 REPORTED CEFS TEAM STILL COOLING AND PRESSURE DROP TO 45 DEG C.. 2329HRS: MARSHALL 1 REPORTED 1 CEFS PERSONNEL AND 1 ERT DOING OPEN VALVE N2. 2331HRS: MARSHALL 1 REPORTED VALVE N2 ACTIVE. 2334HRS: MARSHALL 1 REPORTED 1 CEFS PERSONNEL AND 1 ERT BACKOFF FROM LOCATION. 2337HRS: MARSHALL 1 REPORTED TEMPERATURE DROP TO 40 DEG C. 2344HRS: MARSHALL 1 REPORTED 2 CEFS PERSONNEL AND 1 ERT DOING OVERHAUL AT SCENE. 2347HRS: MARSHALL 1 REPORTED OVERHAUL DONE, GAS READING IN NORMAL CONDITION (0% LEL, 20.9 O2). 2348HRS: ON SCENE COMMANDER DECLARED STANDOWN. 0000HRS: MARSHALL 1 REPORTED ALL EMERGENCY VEHICLES GOING BACK TO MAIN FIRE STATION. 0007HRS: MARSHALL 1 REPORTED THAT ALL VEHICLES SAFELY ARRIVED AT MAIN FIRE STATION. |
| 07:00 | ANGGOTA MEMBUAT PEMBERSIHAN BALAI DAN JENTERA. |
| 08:00 | SAYA RO 32031 SERAH TUGAS OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Mohd Sahril Bin Yakub | Verify by : SFM Haizad Bin Hasan |
|---|---|
| Sahril Yakub | Haizad |