MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
CHARLIE MFS Day February 24, 2026 13 4

Shift Manning

Name Vehicle
SFM Syed Shahrul Bin Syed Yusof RIV2
FM Mohammad Ridzuan Bin Abdul Jabbar RIV2
Khairuddin Bin Masdar PM1
Muhammad Nabil Wafiq Bin Mohamad Zulkifli TTL
Mohamad Farid Bin Ahmad CREW HZ1
Mohamad Nazreen B. Mohamad Ramli FT3
Valentino Hartley Simeon HZ1
Adie Ashraf Bin Abdul Halim FT1
Muhammad Zakwan Bin Zurin CREW MRV1
Mohd Sharul Hisham Bin Kamaruddin FT2
Abdul Aidil Akram Bin Abdul Rahman MRV1
Muhamad Hafiz bin Baseri -

Staff On Leave

Name Leave Type
Reisham Azra bin Md Rani Annual Leave
Ahmad Aizat Bin Samad Annual Leave
Mohamed Ariffudin Bin Azlin Paternity Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO HAFIZ TERIMA TUGAS OCC DARIPADA PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

08:10

OCC LAPOR TUGAS KEPADA RSM,CSM DAN USM SETERUSNYA ANGGOTA UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS.

08:15

ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA SERTA UJIAN WALKIE TALKIE

08:30

ANGGOTA BERTUGAS MELAKUKAN UJIAN JENTERA ROUTE RUNNING TEST DI KAWASAN NON-PROSSES AREA.

08:42

HAZMAT1 DIPANDU FF VALENTINO BERSAMA FF FARID MEMBUAT PENGISIAN BAHAN API DI PETRONAS BUKIT PELALI

08:53

PM1 DIPANDU FF KHAIRUDIN MEMBUAT PENGISIAN BAHAN API DI KOPEJA

09:23

PM1 LAPOR SELAMAT SAMPAI DI MAIN FIRE STATION

09:25

HAZMAT1 LAPOR SELAMAT SAMPAI DI MAIN FIRE STATION

09:30

SEMUA ANGGOTA PASUKAN CHARLIE MEMBUAT LATIHAN KAWAD KAKI

10:30

SEMUA ANGGOTA CHARLIE MEMBUAT SESI PEMBELAJARAN DI DALAM TRAINING ROOM

11:35

MRV1 DIPANDU FF AIDIL DAN FF ZAKWAN KE BUKIT PELALI UNTUK PENGISIAN MINYAK

12:45

MRV1 LAPOR SELAMAT SAMPAI BALAI MAIN FIRE STATION

13:30

FT4 DIPANDU FAIZI DAN ALIP LAPOR SELAMAT SAMPAI DI MAIN FIRE STATION PULANG DARI VOLVO

15:00

SEMUA ANGGOTA PASUKAN CHARLIE MENJALANKAN KERJA MEMASUKKAN BARANG OPERASI KE DALAM JENTERA FT4

16:05

EMERGENCY REPORT
FIRE (BUSH FIRE)
EMERGENCY NUMBER: ME/13/2026
DATE: 24/02/2026
TIME: 1605HRS
LOCATION: LAYDOWN DIALOG
OPC INVOLVED: PT2SB
SENIOR FIRE MARSHAL: MR SYED SHAHRUL
SHIFT: CHARLIE MFS
CALLER: MR AZIN (PANELMAN)

1605HRS: OCC RECEIVED A CALL FROM MR AZIN VIA HOTLINE REPORTING A BUSH FIRE AT PHEONEX PROJECT AND CEFS PIC MFS WAS ACTIVATED.

1606HRS: MARSHAL 1 REPORTED THAT CEFS PERSONNEL HAD BEEN DEPLOYED TO THE LOCATION.

1610HRS: UPON ARRIVING AT THE PHEONIX PROJECT IT WAS CONFIRMED THAT NO INCEDENT HAD OCCURRED.FURTHER INFORMATION THAT THE ACTUAL INCEDENT LOCATION WAS AT THE LAYDOWN PT2SB AREA, AND CEFS IMMEDIATELY REDEPLOYED TO THE SCENE.

1614HRS ARRIVED AT THE ACTUAL LOCATION AND CORNFIMED THE PRESENCE OF AN ACTIVE BUSH FIRE AT THE SCENE.

1615HRS: ESTIMATED AFFECTED AREA WAS APPROXIMATELY 200 METER BY 200 METERS. USING MRV 1 AND FIRE BEATERS TO CONTROL AND CONTAIN THE SPREAD OF THE FIRE.

1620HRS: MARSHAL 1 REQUEST ASSITANCE FROM JABATAN BOMBA DAN PENYELAMAT MALAYSIA (BOMBA SUNGAI RENGIT)

1634HRS: MARSHAL 1 REPORTED BOMBA SUNGAI RENGIT AND SABANA ARRIVED AT THE LOCATION BUSH FIRE.

1638HRS: MARSHAL 1 REPORTED CEFS, BOMBA, AND THE ON SCENE COMMANDER HELD A COORDINATION DISCUSSION AND AGREED TO SET UP A RELAY PUMPING OPERATION, DRAWING WATER FROM A HYDRANT LOCATED 100 METERS TO FT2, THEN RELAYING THROUGH 1,000 FEET OF HOSE TO MRV1, WITH ADDITIONAL SUPPORT PROVIDED BY FRT BOMBA SUNGAI RENGIT AND BOMBA SABANA.

1640HRS: FIRE IS UNDER CONTROL FOLLOWING COORDINATED SUPPRESSION EFFORTS.

1700HRS PT2SB TEAM DEPLOYED A WATER CURTAIN AS A PROACTIVE BARRIER TO CORDON OFF THE NEAREST TANK, ENSURING ADDITIONAL COOLING AND PREVENTING HEAT EXPOSURE DURING FIRE FIGHTING OPERATION.

17:50

FT3 DAN HAZMAT1 LAPOR KE LOKASI KEBAKARAN DI PT2SB

17:56

FT3 DAN HAZMAT LAPOR SELAMAT SAMPAI LOKASI

20:00

ANGGOTA PASUKAN CHARLIE DAN PASUKAN BRAVO MEMBUAT PERTUKARAN SHIFT DI LOKASI KEBAKARAN

20:00

SAYA RO HAFIZ SERAH TUGAS OCC KEPADA PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhamad Hafiz bin Baseri Verify by : SFM Syed Shahrul Bin Syed Yusof
hafiz shahrul