Company Logo

MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
BRAVO MFS Day February 21, 2026 12 3

Shift Manning

Name Vehicle
SFM Suhaimi Bin Kassiron RIV2
FM Mohammad Adib Syahmi Bin Amri RIV2
Fathul Imran Bin Dol Malek MRV1
Khairuddin Bin Masdar CREW MRV1
Muhammad Syamil Bin Samad FT1
Muhammad Salihin bin Marasip FT2
Mohd Irwan Syah Bin Rohaizan FT3
Mohd Lutman Hakim Bin Harun CREW FT2
Ahmad Tarmisham Bin Othman HZ1
Mohd Hazeem Bin Abdul Halim TTL
Muhammad Iszuan Bin Suhadi PM1
Mohd Khairihizmi bin Ibrahim -

Staff On Leave

Name Leave Type
Mohammad Ain Nur-Muslim Bin Tarli Emergency Leave
Muhammad Arief Izzuddin Bin Shokry Annual Leave
Khairul Hafiz Bin Eddy Arifin Annual Leave

Occurrence Book Entry

Time Remarks
08:00

RO 32064 TERIMA TUGAS OCC DARIPADA RO DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

08:05

OCC LAPOR STATUS HARIAN KEPADA RSM, CSM, USM DAN LGPC DITERIMA BAIK.

08:15

ANGGOTA MEMBUAT UJIAN RADIO KEPADA OCC DITERIMA BAIK.

08:20

ANGGOTA MEMBUAT PEMERIKSAAN KE ATAS JENTERA DAN PERALATAN DALAM BAIK.

09:10

PM 1 DIPANDU FF ISZUAN MEMBUAT UJIAN PERJALANAN JENTERA DALAM BAIK.

09:20

PM 1 LAPOR SAMPAI DI BALAI DALAM BAIK.

09:30

ANGGOTA MEMBUAT AKTIVITI ITM DI ENGINE BAY DALAM BAIK.

14:00

ANGGOTA MENYAMBUNG AKTIVITI ITM DALAM BAIK.

16:40

FORD DIPANDU FF SALIHIN BERSAMA FF SYAMIL KELUAR KE

17:00

ANGGOTA MELAKUKAN LATIHAN FIZIKAL DI GIMNASIUM DALAM BAIK.

18:00

ANGGOTA MELAKUKAN PEMBERSIHAN JENTERA DAN BALAI.

19:00

ANGGOTA MEMBUAT PERSEDIAAN UNTUK PENYERAHAN TUGAS.

19:30

ANGGOTA SEDANG MELAKUKAN PENYERAHAN TUGAS KEPADA PASUKAN ALPHA DALAM BAIK.

20:00

RO 32064 SERAH TUGAS OCC KEPADA RO ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Khairihizmi bin Ibrahim Verify by : Senior Fire Marshall
hizmi