MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Night | January 27, 2026 | 4 | 2 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Haizad Bin Hasan | RIV2 |
| FM Muhammad Yazid bin Abd Rahman | RIV2 |
| Valentino Hartley Simeon | MRV1 |
| Mohamad Sufian Bin Mohd Lazi | MRV1 |
| Muhammad Habibul Asyraf Bin Burhan | FT1 |
| Hafizuddin Bin Ngah | FT2 |
| Nur Muhammad Amirull Bin Ahmad Faiza | FT3 |
| Mohd Sahril Bin Yakub | FT4 |
| Mohamed Ariffudin Bin Azlin | HZ1 |
| Mohd Haziq Bin Mohd Din | TTL |
| Mohd Norhafiz Bin Yusoff | PM1 |
| Muhammad Fakhrul Razin bin Shamsudin | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Muhammad Khuzairi Bin Jaafar | Hospitalization Leave |
| Abdul Aidil Akram Bin Abdul Rahman | Annual Leave |
| Ezad Ariff Bin Jamaluddin | Sick Leave |
| Muhammad Syazwan bin Ibrahim | Sick Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO RAZIN TERIMA TUGAS OCC DARIPADA RO FIKRY DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:15 | OCC TERIMA LAPOR TUGAS DARIPADA RSM, CSM DAN USM YANG BERTUGAS DENGAN BAIK DAN JELAS. |
| 20:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DIKAWASAN BALAI MAIN SETERUSNYA MELAKUKAN UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS. |
| 21:07 | STAREX DIPANDU SAHRIL BERSAMA ARIFFUDIN KELUAR KE MAIN GATE 01 TUGASAN KHAS DI SUNGAI RENGIT. |
| 21:15 | EMERGENCY REPORT 2115HRS: OCC RECEIVED CALL FROM CONTROL ROOM PT2SB INFORMED THAT BEEHIVE AT LAYDOWN PT2SB. 2116HRS: OCC ACTIVATED CEFS TO THE LOCATION AND MARSHALL 1 REPORTED 4 CEFS PERSONNEL WITH EMERGENCY VEHICLES (RIV2 AND MRV1) TO LOCATION. 2130HRS: MARSHALL 1 REPORTED RIV2 AND MRV1 ARRIVED AT PT2SB AND CONFIRMED THAT BEEHIVE LOCATED AT LAYDOWN ESTIMATED SIZE 30CM. 2131HRS: MARSHALL 1 REPORTED SETUP 2 RESPONDERS COMPLETED WITH BEE SUIT AND 2 BAYGON SPRAY WERE READY ON TOP OF THE TANK TO DEMOLISH THE HIVE. 2133HRS: MARSHALL 1 REPORTED THE BEEHIVE WAS SUCCESSFULLY DEMOLISHED AND THE AREA WAS SAFE FROM ANY BEE THREAT. 2134HRS: MARSHALL 1 REPORTED OVERHAUL ACTIVITY. 2137HRS: MARSHALL 1 DECLARED OPERATION STAND DOWN AND CEFS TEAM WITH EMERGENCY VEHICLES BACK TO FIRE STATION. 2205HRS: MARSHALL 1 REPORTED CEFS TEAM SAFELY ARRIVED AT MAIN FIRE STATION. |
| 21:08 | STAREX LAPOR SELAMAT SAMPAI DI BALAI MAIN DALAM KEADAAN BAIK DAN TERKAWAL. |
| 22:00 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI KELAS TEORI DALAM BILIK TRAINING DIKETUAI OLEH SFM HAIZAD DENGAN BAIK. |
| 23:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MENGEMASKINI PENILAIAN PRESTASI PEKERJA DI APLIKASI BIPO. |
| 00:45 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MEMBASUH JENTERA OPERASI YANG KOTOR SEBELUM DISERAHKAN KEPADA ANGGOTA SHIFT BRAVO PADA ESOK PAGI. |
| 06:00 | ANGGOTA BERTUGAS MELAKUKAN SOLAT SECARA BERJEMAAH DIDALAM SURAU BALAI MAIN DENGAN BAIK. |
| 07:00 | STAREX DIPANDU SAHRIL MENGAMBIL ANGGOTA DI MAIN GATE 01. |
| 07:45 | ANGGOTA DELTA MELAKUKAN AKTIVITI SERAH TUGAS DAN JENTERA OPERASI KEPADA ANGGOTA SHIFT BRAVO DALAM KEADAAN BAIK DAN TERKAWAL. |
| 08:00 | SAYA RO RAZIN SERAH TUGAS OCC KEPADA RO DARIPDA SHIFT BRAVO DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Muhammad Fakhrul Razin bin Shamsudin | Verify by : SFM Haizad Bin Hasan |
|---|---|
| Fakhrul Razin | Haizad |