MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
DELTA MFS Night January 27, 2026 4 2

Shift Manning

Name Vehicle
SFM Haizad Bin Hasan RIV2
FM Muhammad Yazid bin Abd Rahman RIV2
Valentino Hartley Simeon MRV1
Mohamad Sufian Bin Mohd Lazi MRV1
Muhammad Habibul Asyraf Bin Burhan FT1
Hafizuddin Bin Ngah FT2
Nur Muhammad Amirull Bin Ahmad Faiza FT3
Mohd Sahril Bin Yakub FT4
Mohamed Ariffudin Bin Azlin HZ1
Mohd Haziq Bin Mohd Din TTL
Mohd Norhafiz Bin Yusoff PM1
Muhammad Fakhrul Razin bin Shamsudin -

Staff On Leave

Name Leave Type
Muhammad Khuzairi Bin Jaafar Hospitalization Leave
Abdul Aidil Akram Bin Abdul Rahman Annual Leave
Ezad Ariff Bin Jamaluddin Sick Leave
Muhammad Syazwan bin Ibrahim Sick Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO RAZIN TERIMA TUGAS OCC DARIPADA RO FIKRY DALAM KEADAAN BAIK DAN TERKAWAL.

20:15

OCC TERIMA LAPOR TUGAS DARIPADA RSM, CSM DAN USM YANG BERTUGAS DENGAN BAIK DAN JELAS.

20:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DIKAWASAN BALAI MAIN SETERUSNYA MELAKUKAN UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS.

21:07

STAREX DIPANDU SAHRIL BERSAMA ARIFFUDIN KELUAR KE MAIN GATE 01 TUGASAN KHAS DI SUNGAI RENGIT.

21:15

EMERGENCY REPORT
SPECIAL ASSISTANCE (BEEHIVE)
EMERGENCY NO: ME/5/2026
DATE: 27/01/2026
TIME: 2115HRS
LOCATION: LAYDOWN PT2SB
OPC INVOLVED: PT2SB
SENIOR FIRE MARSHALL: MR HAIZAD HASSAN
SHIFT: DELTA MFS
CALLER NAME: HOTLINE (PT2SB CCR)

2115HRS: OCC RECEIVED CALL FROM CONTROL ROOM PT2SB INFORMED THAT BEEHIVE AT LAYDOWN PT2SB.

2116HRS: OCC ACTIVATED CEFS TO THE LOCATION AND MARSHALL 1 REPORTED 4 CEFS PERSONNEL WITH EMERGENCY VEHICLES (RIV2 AND MRV1) TO LOCATION.

2130HRS: MARSHALL 1 REPORTED RIV2 AND MRV1 ARRIVED AT PT2SB AND CONFIRMED THAT BEEHIVE LOCATED AT LAYDOWN ESTIMATED SIZE 30CM.

2131HRS: MARSHALL 1 REPORTED SETUP 2 RESPONDERS COMPLETED WITH BEE SUIT AND 2 BAYGON SPRAY WERE READY ON TOP OF THE TANK TO DEMOLISH THE HIVE.

2133HRS: MARSHALL 1 REPORTED THE BEEHIVE WAS SUCCESSFULLY DEMOLISHED AND THE AREA WAS SAFE FROM ANY BEE THREAT.

2134HRS: MARSHALL 1 REPORTED OVERHAUL ACTIVITY.

2137HRS: MARSHALL 1 DECLARED OPERATION STAND DOWN AND CEFS TEAM WITH EMERGENCY VEHICLES BACK TO FIRE STATION.

2205HRS: MARSHALL 1 REPORTED CEFS TEAM SAFELY ARRIVED AT MAIN FIRE STATION.

21:08

STAREX LAPOR SELAMAT SAMPAI DI BALAI MAIN DALAM KEADAAN BAIK DAN TERKAWAL.

22:00

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI KELAS TEORI DALAM BILIK TRAINING DIKETUAI OLEH SFM HAIZAD DENGAN BAIK.

23:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MENGEMASKINI PENILAIAN PRESTASI PEKERJA DI APLIKASI BIPO.

00:45

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI MEMBASUH JENTERA OPERASI YANG KOTOR SEBELUM DISERAHKAN KEPADA ANGGOTA SHIFT BRAVO PADA ESOK PAGI.

06:00

ANGGOTA BERTUGAS MELAKUKAN SOLAT SECARA BERJEMAAH DIDALAM SURAU BALAI MAIN DENGAN BAIK.

07:00

STAREX DIPANDU SAHRIL MENGAMBIL ANGGOTA DI MAIN GATE 01.

07:45

ANGGOTA DELTA MELAKUKAN AKTIVITI SERAH TUGAS DAN JENTERA OPERASI KEPADA ANGGOTA SHIFT BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

08:00

SAYA RO RAZIN SERAH TUGAS OCC KEPADA RO DARIPDA SHIFT BRAVO DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhammad Fakhrul Razin bin Shamsudin Verify by : SFM Haizad Bin Hasan
Fakhrul Razin Haizad