Company Logo

MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
CHARLIE MFS Night January 16, 2026 3 2

Shift Manning

Name Vehicle
SFM Suhaimi Bin Kassiron RIV2
FM Mohammad Ridzuan Bin Abdul Jabbar RIV2
Adie Ashraf Bin Abdul Halim MRV1
Mohamad Nazreen B. Mohamad Ramli MRV1
Valentino Hartley Simeon FT1
Muhamad Hafiz bin Baseri FT2
Mohamad Farid Bin Ahmad FT3
Ahmad Aizat Bin Samad FT4
Mohamed Ariffudin Bin Azlin HZ1
Muhammad Zakwan Bin Zurin CREW HZ1
Reisham Azra bin Md Rani PM1
Muhammad Nabil Wafiq Bin Mohamad Zulkifli TTL
Mohd Sharul Hisham Bin Kamaruddin -

Staff On Leave

Name Leave Type
SFM Syed Shahrul Bin Syed Yusof Annual Leave
Khairuddin Bin Masdar Annual Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA RO SHARUL 32033 TERIMA TUGAS OCC DARI PASUKAN DELTA DALAM KEADAAN BAIK.

20:05

OCC LAPOR ANNGOTA BERTUGAS KEPADA RSM USM DAN CSM VIA WHATSAPP.

20:15

ANGGOTA MELAKUKAN UJIAN WALKIE TALKIE KEPADA OCC KEADAAN BAIK DAN TERKAWAL.

20:30

ANGGOTA MELAKUKAN PEMERIKSAAN JENTERA DAN ALATAN OPERASI DALAM KEADAAN BAIK DAN TERKAWAL

21:01

RIV2 DIPANDU FM RIDZUAN KELAUR MEMBUAT RONDAAN DI KAWASAN NON-PROSES.

21:12

RIV2 LAPOR SAMPAI DALAM KEAADAN BAIK DAN SELAMAT.

21:20

STAREX DIPANDU VALENTINO BERSAMA HAFIZ KELUAR KE SG RENGIT MELALUI GATE 1.

22:00

ANGGOTA MELAKUKAN KERJA-KERJA PENGISIAN TABUNG SCBA.

23:00

ANGGOTA MELAKUKAN KERJA-KERJA EPM END YEAR.

01:18

SFM FARIZUAN MAKLUM KEPADA OCC BERKENAAN ISU TUMPAHAN MINYAK DI JALAN PERSIARAN SELATAN DAN MELIBATAKN BEBERAPA TEMPAT (PHOENIX PROJECT, AREA 3B DAN SPT). DIDAPATI BERPUNCA DARIPADA MINYAK HYDRAULIC LORI (PHOENIX PROJECT) DAN KESAN TUMPAHAN PADA JALAN RAYA TELAH KERING.OCC MAKLUM KEPADA PIHAK PSCC UNTUK TINDAKAN LANJUT.

07:00

ANGGOTA MELAKUKAN KEKEMASAN BALAI DAN JENTERA UNTUK SERAH TUGAS.

08:00

SERAH TUGAS OCC KEPADA RO PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Sharul Hisham Bin Kamaruddin Verify by : SFM Suhaimi Bin Kassiron
sharulhisham