MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
DELTA MFS Day December 31, 2025 65 53

Shift Manning

Name Vehicle
SFM Haizad Bin Hasan RIV2
FM Muhammad Yazid bin Abd Rahman RIV2
Mohamad Sufian Bin Mohd Lazi MRV1
Abdul Aidil Akram Bin Abdul Rahman MRV1
Muhammad Fakhrul Razin bin Shamsudin FT1
Nur Muhammad Amirull Bin Ahmad Faiza FT2
Muhammad Khuzairi Bin Jaafar FT3
Mohd Norhafiz Bin Yusoff FT4
Mohd Haziq Bin Mohd Din HZ1
Hafizuddin Bin Ngah TTL
Muhammad Shukran Hakim bin Bakar PM1
Muhammad Habibul Asyraf Bin Burhan -

Staff On Leave

Name Leave Type
Mohd Sahril Bin Yakub Annual Leave
Ezad Ariff Bin Jamaluddin Emergency Leave
Muhammad Syazwan bin Ibrahim Sick Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO 32037 HABIBUL TERIMA TUGAS OCC DARIPADA RO LUTMAN DALAM KEADAAN BAIK DAN TERKAWAL.

08:05

OCC LAPOR TUGAS KEPADA RSM,CSM DAN USM SETERUSNYA ANGGOTA UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS.

08:10

ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA SERTA UJIAN WALKIE TALKIE.

08:45

STAREX DIPANDU HAFIZ LAPOR KELUAR TANJUNG PENGELIH TUJUAN MEMBELI MAKANAN ANGGOTA BERTUGAS.

09:15

TTL & FT2 MELAKUKAN UJIAN PERJALANAN DALAM KEADAAN BAIK.

09:35

PMI DIPANDU SHUKRAN KE KOPEJA UNTUK PENGISIAN MINYAK JENTERA.

09:40

STAREX DIPANDU HAFIZ TIBA DI BALAI BAIK ADANYA.

10:07

PM1 DIPANDU SHUKRAN KE KOPEJA UNTUK PENGISIAN MINYAK JENTERA SELAMAT TIBA DI BALAI.

10:40

STAFF PC INA MAKLUM AKAN MELAKUKAN KERJA PREVENTIVE MAINTENANCE DAN MUNGKIN AKAN MENGAKTIF ALARM.

10:41

ANGGOTA BERTUGAS BERKUMPUL DI ENGINE BAY TUJUAN SESI ITM - RIV2 RTA.

11:01

STAFF PC INA MAKLUM AKAN MELAKUKAN KERJA PREVENTIVE MAINTENANCE SELESAI.

12:00

STAREX DIPANDU HAFIZ BERSAMA SHUKRAN LAPOR KELUAR SUNGAI RENGIT TUJUAN MEMBELI MAKANAN ANGGOTA BERTUGAS.

13:08

FORD DIPANDU AMIRUL BERSAMA FM1 KE RC SITE TUJUAN FSP.

13:38

FORD DIPANDU AMIRUL BERSAMA FM1 SELAMAT TIBA DI BALAI.

13:50

STAREX DIPANDU HAFIZ BERSAMA SHUKRAN SELAMAT TIBA DI BALAI.

15:05

TERIMA PANGGILAN DARI EN FIRDAUS PT2SB MELALUI TALIAN HOTLINE MEMAKLUMKAN TERDAPAT SARANG LEBAH DI TANGGA CRUDE TANK 2 PT2SB. OCC AMBIL MAKLUM DAN MAKLUMKAN KEPADA EN FIRDAUS, CEFS TEAM AKAN KE SANA SETELAH SELESAI LATIHAN KEBAKARAN DI RC SITE SEBENTAR NANTI (ATAS ARAHAN SFM HAIZAD).

15:10

EMERGENCY DRILL REPORT
FIRE (TANK FIRE - RIM SEAL)
DRILL NUMBER: MD/54/2025
DATE: 31/12/2025
TIME: 1510HRS
LOCATION: AREA 3B, 5150-T-003A
OPC INVOLVED: PRefChem
SFM: EN. HAIZAD HASAN
SHIFT: DELTA MFS
CALLER: RSM EN. DARZIMAN

1510HRS: OCC RECEIVED A CALL FROM RSM EN. DARZIMAN VIA WALKIE TALKIE, REPORTING A FIRE AT AREA 3B, TANK 5150-T-003A. NO INJURED PERSONS (IP) WERE INVOLVED.

1511HRS: OCC ACTIVATED THE MAIN FIRE STATION, MEDIC BRAVO AND PSCC TO RESPOND TO THE LOCATION.

1512HRS: MARSHALL-1 REPORTED THAT 11 CEFS PERSONNEL AND 8 EMERGENCY VEHICLES HAD BEEN DEPLOYED TO THE SCENE.

1513HRS: OCC INFORMED MARSHALL-1 OF THE WIND CONDITIONS, DIRECTION: NORTH TO SOUTH, SPEED: 19 KM/H.

1513HRS: MEDIC 01 WAS ALSO DEPLOYED TO THE SCENE.

1516HRS: MARSHALL-1 REPORTED THE CEFS TEAM HAD ARRIVED AND BEGUN SIZE-UP OF THE INCIDENT AREA.

1517HRS: OSC REPORTED THAT THE PIPING LINE WAS ISOLATED. NO PRODUCT WAS FLOWING IN OR OUT. THE TANK SIZE WAS CONFIRMED TO BE 43M IN DIAMETER.

1517HRS: MARSHALL-1 CONFIRMED THE INCIDENT WAS A RIM SEAL FIRE INVOLVING SR KEROSENE. THE DELUGE SYSTEM WAS ACTIVATED BY ERT, WHILE THE CEFS TEAM SET UP A DEFENSIVE OPERATION USING FT4 GUN DECK AND PREPARED FT3 FOR AN OFFENSIVE OPERATION USING THE FOAM NIHILATOR SYSTEM.

1522HRS: MEDIC 01 ARRIVED AT THE SCENE.

1528HRS: MARSHALL-1 REPORTED THAT THE CEFS TEAM HAD COMMENCED OFFENSIVE OPERATIONS BY INJECTING FOAM VIA THE FOAM NIHILATOR SYSTEM.

1531HRS: MARSHALL-1 CONFIRMED THE FIRE WAS SUCCESSFULLY EXTINGUISHED AND REQUESTED THE PSCC DRONE TEAM TO VERIFY FROM THE TOP VIEW.

1534HRS: PSCC DRONE TEAM CONFIRMED THAT THE FIRE HAD BEEN COMPLETELY EXTINGUISHED.

1537HRS: MARSHALL-1 REPORTED THAT 2 CEFS PERSONNEL AND 1 ERT BEGAN OVERHAUL OPERATIONS.

1539HRS: OVERHAUL OPERATIONS WERE COMPLETED.

1540HRS: OSC DECLARED STAND DOWN.

1547HRS: MEDIC 01 EN ROUTE BACK TO CMF.

1548HRS: MARSHALL-1 REPORTED ALL EMERGENCY VEHICLES EN ROUTE BACK TO THE MAIN FIRE STATION.

1554HRS: ALL VEHICLES SAFELY ARRIVED AT THE MAIN FIRE STATION.

1600HRS: MEDIC 01 SAFELY ARRIVED AT CMF.

15:55

RIV2 DIPANDU AMIRUL BERSAMA FM1 BERGERAK KE PT2SB BAGI PEMANTAUAN LEBAH.

17:07

RIV2 DIPANDU AMIRUL BERSAMA FM1 TIBA DI PINTU MASUK PT2SB.

17:20

FM1 LAPOR BENAR SARANG LEBAH BERADA DI TANK CURE TK-1201-02, ANGGARAN UKURAN 1 KAKI.

17:26

FM1 LAPOR SELESAI MEMASANG "BARRICADE TAPE" DI KAWASAN SARANG LEBAH DAN AKAN SERAHKAN PADA PASUKAN CHARLIE UNTUK KERJA PEMUSNAHAN SARANG LEBAH. FM1 LAPOR RIV2 BERGERAK BALIK KE MFS.

17:40

RIV2 DIPANDU AMIRUL BERSAMA FM1 SELAMAT TIBA DI BALAI.

18:00

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI "PHYSICAL TRAINING".

19:00

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI KEKEMASAN BALAI DAN JENTERA.

19:30

ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PENYERAHAN TUGAS JENTERA KEPADA PASUKAN CHARLIE.

20:00

SAYA RO 32037 HABIBUL SERAH TUGAS OCC KEPADA RO 32107 NAZREEN DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Muhammad Habibul Asyraf Bin Burhan Verify by : SFM Haizad Bin Hasan
HABIBUL Haizad