Company Logo

MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
DELTA MFS Day December 24, 2025 64 51

Shift Manning

Name Vehicle
SFM Haizad Bin Hasan RIV2
FM Muhammad Yazid bin Abd Rahman RIV2
Nur Muhammad Amirull Bin Ahmad Faiza MRV1
Abdul Aidil Akram Bin Abdul Rahman MRV1
Mohamad Sufian Bin Mohd Lazi FT1
Muhammad Danial Bin Muhsain FT2
Muhammad Nurhalis Syafiq Bin Mohamad Nizu FT3
Ezad Ariff Bin Jamaluddin FT4
Raja Mohamad Nazmi bin Raja Nazarudin HZ1
Muhammad Fakhrul Razin bin Shamsudin TTL
Mohd Sahril Bin Yakub PM1
Mohd Norhafiz Bin Yusoff -

Staff On Leave

Name Leave Type
Muhammad Khuzairi Bin Jaafar Annual Leave
Muhammad Habibul Asyraf Bin Burhan Annual Leave
Hafizuddin Bin Ngah Annual Leave
Mohd Haziq Bin Mohd Din Emergency Leave
Muhammad Syazwan bin Ibrahim Sick Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO HAFIZ 32065 TERIMA TUGAS OCC DARI PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL.

08:05

STAREX DIPANDU FF RAZIN LAPOR KELUAR MENGHANTAR ANGGOTA KE GATE 1.

08:08

OCC LAPOR KEKUATAN ANGGOTA DAN JENTERA KE RSM, CSM DAN USM DALAM KEADAAN BAIK.

08:10

STAREX LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

08:15

SEMUA ANGGOTA MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA DALAM KEADAAN BAIK.

08:20

SEMUA ANGGOTA BERTUGAS MELAKUKAN UJIAN DTRS KE OCC DALAM KEADAAN BAIK.

08:40

MRV-1 DIPANDU FF AMIRUL LAPOR KELUAR MEMBUAT UJIAN PEMANDUAN DI SEKITAR NON-PROSES AREA.

08:45

STAREX DIPANDU FF RAZIN LAPOR KELUAR KE GATE 1 URUSAN TUGAS-TUGAS KHAS.

08:55

MRV-1 LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

09:15

STAREX LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

09:30

SEMUA ANGGOTA BERTUGAS BERKUMPUL DI ENJIN BAY UNTUK KAWAD KAKI AKTIVITI DIKETUAI FM YAZID.

09:48

FT-2 DIPANDU FF SUFIAN BERSAMA FF SAHRIL LAPOR KELUAR KE AR TANK UNTUK KERJA-KERJA STANDBY.

10:00

FT-2 LAPOR SELAMAT TIBA DI LOKASI STANDBY.

10:06

FT-3 DIPANDU FF AMIRUL BERSAMA FF HALIS LAPOR KELUAR KE PETRONAS BUKIT PELALI UNTUK PENGISIAN MINYAK.

10:55

FT-3 LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

11:02

FM YAZID LAPOR AREA 2A ARDS LOAN (PINJAM) DUMMY UNTUK DRILL EXERCISE DALAM KEADAAN BAIK.

12:51

FF SAHRIL LAPOR KERJA-KERJA DI AR TANK SELESAI DAN AKAN DI SAMBUNG ESOK DAN SETERUSNYA FT-2 LAPOR BERGERAK BALIK KE BALAI.

13:05

FT-2 LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

15:07

EMERGENCY DRILL REPORT
JET FIRE -1212 P009A
EMERGENCY NUMBER: MD/52/2025
DATE: 24/12/2025
TIME: 1507HRS
LOCATION: AREA 2A (1212 ARDS -2)
OPC INVOLVED: PRCSB
FIRE MARSHALL: EN HAIZAD HASAN
SHIFT: DELTA MFS
CALLER: MR DAZIRMAN (RSM)
1507HRS: OCC RECEIVED A CALL FROM EN DARZIMAN (RSM) REGARDING 1 IP INVOLVED AT AREA 2A ARDS-2 (1212P-009A) SCENARIO JET FIRE.

1508HRS: OCC ACTIVATED CEFS TEAM (DELTA MFS), MEDIC BRAVO AND PSCC TO THE LOCATION. OCC INFORMING MARSHALL-1 WIND DIRECTION NORTH TO SOUTH.

1509HRS: MARSHALL-1 REPORTED 11 CEFS PERSONNEL AND 6 EMERGENCY VEHICLE DEPLOYED TO THE SCENE.

1512HRS: MARSHALL-1 REPORTED CEFS TEAM, MEDIC TEAM SAFELY ARRIVED AT THE LOCATION AND PERFORMING SIZE UP.

1513HRS: MARSHALL-1 CONFIRMED THERE WAS AN EMERGENCY DRILL WITH SCENARIO JET FIRE AT ARDS-2 (1212 P-009A) AND 1 IP INVOLVED.

1515HRS: MARSHALL-1 REPORTED THE FIRE IS UNDER CONTROL BY ERT TEAM USING FIXED MONITOR AND DELUGE SYSTEM.

1517HRS: MARSHALL-1 REPORTED CEFS TEAM ACTIVATE GROUND MONITOR AND SETUP 1 ATTACKING LINE WITH 2 NOZZLES TO CONFINED FIRE.

1518HRS: MARSHALL-1 REPORTED CEFS TEAM PERFORM TO EXTINGUISH AND DO
RESCUE.
1520HRS: MARSHALL-1 REPORTED CURRENT REMINING PREASURE PIPING IS 1 BAR.

1525HRS: MARSHALL-1 REPORTED THE FIRE ARE FULLY EXTINGUISH AND 2 CEFS TEAM WITH 2 ERT TEAM GO INSIDE FOR SEARCH AND RESCUE IP.

1528HRS: MARSHALL-1 REPORTED THE IP WAS SUCCESSFULLY RESCUE BY CEFS TEAM AND THE IP GO THRUE WITH DECON PROCEDURE AND HANDOVER TO MEDIC TEAM FOR FURTHER TREATMENT.

1532HRS: MARSHALL-1 REPORTED 2ND IP AT LOCATION.

1533HRS: MARSHALL -1 REPORTED 3 CEFS PERSONNEL WITH 1 ERT (RESCUE TEAM) INFORMED 1 IP UNCONSCIOUS AND CONTINUE FOR DOING RESCUE ACTIVITY.

1537HRS: MARSHALL 1 REPORTED RESCUE TEAM SUCCESFULLY RESCUE 1 IP AND DO PRIMARY DECON PROCEDURE SEND TO MEDIC TEAM.

1540HRS: MARSHALL 1 REPORTED 2 CEFS TEAM AND 1 ERT ENTERING FOR GAS CHECK AND OVERHAUL PROCEDURE USING GAS DETECTOR.

1542HRS: MARSHAL-1 REPORTED THE TEMPERATURE IS NORMAL BELOW 30`C, LEL 0%, OXYGEN 20.9%, & H2S 0 PPM.

1550HRS: OSC DECLARE OPERATION STAND DOWN.

1607HRS: MARSHALL-1 REPORTED CEFS TEAM BACK TO FIRE STATION.

1610HRS: MARSHALL-1 REPORTED CEFS TEAM SAFELY ARRIVED AT FIRE STATION.

17:30

RIV-2 DIPANDU FF RAZIN LAPOR KELUAR KE PETRONAS BUKIT PELALI UNTUK PENGISIAN MINYAK.

18:10

RIV-2 LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK.

18:15

SEMUA ANGGOTA BERKUMPUL DI ENJIN BAY UNTUK FITNESS AKTIVITI DALAM KEADAAN BAIK,

19:00

SEMUA ANGGOTA MELAKUKAN PEMBERSIHAN JENTERA DAN SEKITAR BALAI DALAM KEADAAN BAIK.

20:00

SAYA RO HAFIZ 32065 SERAH TUGAS OCC KE PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL.

Verification

Check by : Mohd Norhafiz Bin Yusoff Verify by : SFM Haizad Bin Hasan
Hafiz Haizad