MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
BRAVO MFS Day October 16, 2025 55 40

Shift Manning

Name Vehicle
SFM Suhaimi Bin Kassiron FORD REPLACEMENT
FM Mohammad Adib Syahmi Bin Amri FORD REPLACEMENT
Ahmad Tarmisham Bin Othman MRV1
Muhammad Syamil Bin Samad FT1
Mohd Khairihizmi bin Ibrahim FT2
Mohd Irwan Syah Bin Rohaizan FT3
Mohd Lutman Hakim Bin Harun FT4
Adie Ashraf Bin Abdul Halim HZ1
Mohd Hazeem Bin Abdul Halim TTL
Mohammad Ain Nur-Muslim Bin Tarli PM1
Mohamad Nazreen B. Mohamad Ramli MRV1
Muhammad Arief Izzuddin Bin Shokry -

Staff On Leave

Name Leave Type
Muhammad Iszuan Bin Suhadi Annual Leave
Khairul Hafiz Bin Eddy Arifin Annual Leave
Fathul Imran Bin Dol Malek Sick Leave
Muhammad Salihin bin Marasip Sick Leave

Occurrence Book Entry

Time Remarks
08:00

SAYA RO 32027 MOHD LUTMAN HAKIM BIN HARUN PASUKAN BRAVO TERIMA TUGAS OCC DARIPADA RO MOHD NORHAFIZ YUSOF PASUKAN DELTA DALAM KEADAAN BAIK DAN TERKAWAL.

08:05

OCC LAPOR TUGAS PASUKAN BRAVO KEPADA RSM, CSM DAN USM.

08:08

ANGGOTA BERTUGAS MELAKUKAN UJIAN WAKIE TALKIE KEPADA OCC.

08:15

ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN JENTERA DAN PERALATAN.

08:26

EMERGENCY REPORT
HAZMAT (HYDROGEN LEAK)
EMERGENCY NUMBER: ME/55/2025
DATE: 16/10/2025
TIME: 0826HRS
LOCATION: UNIT 1220 DHT
OPC INVOLVED: PRCSB
MARSHALL: EN SUHAIMI KASSIRON
SHIFT: BRAVO MFS
CALLER: RSM DARZIMAN

0826HRS: OCC RECEIVED EMERGENCY CALL FROM RSM EN. DARZIMAN ABOUT HYDROGEN LEAK AT UNIT 1220 (DHT).

0827HRS: OCC ACTIVATED CEFS TEAM, MEDIC BRAVO, AND PSCC.

0827HRS: MARSHALL 1 REPORTED THAT THE CEFS TEAM HAD BEEN DEPLOYED WITH 8 VEHICLES AND 11 CEFS PIC PERSONNEL TO THE SCENE.

0830HRS: CEFS TEAM ARRIVED AT THE LOCATION.

0832HRS: MARSHAL 1 CONFIRMED HYDROGEN LEAK AT REACTOR DHT AND CEFS TEAM START TO SIZE UP.

0834HRS: MARSHALL 1 REPORTED CEFS TEAM DEPLOY 2-UNIT GROUND MONITOR FOR STANDBY. OSC INFORM ISOLATE AND THAT ONLY REMAINING PRODUCT.

0841HRS: OSC REPORT SYSTEM PRESSURE REMAINING AT 92 BAR AND CONTROL PANEL PURGING NITROGEN INSIDE REACTOR.

0842HRS: MARSHALL 1 REPORTED TO SET UP THE 1 FT FOR GUNDECK USE BEHIND THE REACTOR.

0849HRS: MARSHALL 1 REPORTED SITUATION AT REACTOR DHT UNDER CONTROL.

0853HRS: MARSHALL 1 REPORTED PRESSURE IN REACTOR 52 BAR DAN NITROGEN CONTINUE PURGING IN REACTOR.

0908HRS: MARSHALL 1 REPORTED PRESSURE IN REACTOR DROP TO 25 BAR

0914HRS: MARSHALL 1 REPORTED PRESSURE IN REACTOR DROP TO 20 BAR AND OSC REPORTED COMPRESSOR SHUTDOWN.

0931HRS: MARSHALL 1 REPORTED OSC, FM1 AND 2X OPERATION TEAM ENTRY TO REACTOR DHT FOR IDENTIFY LEAK POINT.

0935HRS: MARSHALL 1 CONFIRMED LEAK POINT AT FLANGE HEAT 72°C USING TIC.

0945HRS: MARSHALL 1 REPORTED TEMPERATURE NORMAL, LEL 0, OXYGEN 20.9%, H₂S 0 PPM AT INCIDENT AREA.

0946HRS: MARSHALL 1 REPORTED OSC, FM1 AND 2X OPERATION TEAM EXIT INCIDENT AREA SAFELY.

0956HRS: OSC DECLARED STAND DOWN AND REQUEST 1 FOAM TENDER WITH 2X CEFS PERSONNEL FOR STANDBY AT INCIDENT AREA.

1015HRS: ALL VEHICLES RETURNED TO STATION.

1023HRS: CEFS TEAM SAFELY ARRIVED AT MAIN FIRE STATION.

12:21

FT 2 DI PANDU MUSLIM BERSAMA HAZEEM PERTUKARAN STANBY DHT.

12:25

FT 2 LAPOR SAMPAI MFS DALAM KEADAAN BAIK.

15:08

FT 2 DI PANDU SYAMIL BERSAMA ADIE PERTUKARAN STANBY DHT DENGAN FT 4.

15:20

FT 4 LAPOR SAMPAI BALAI. FT 4 BERADA DALAM KEADAAN BAIK.

17:00

FT 2 LAPOR SAMPAI DI BALAI DALAM KEADAAN BAIK.

17:30

SEMUA ANGGOTA TERLIBAT DENGAN AKTIVITI LATIHAN FIZIKAL DALAM KEADAAN BAIK.

18:45

SEMUA ANGGOTA TERLIBAT DENGAN KERJA-KERJA HOUSEKEEPING KAWASAN BALAI DAN JENTERA DALAM KEADAAN BAIK.

19:00

STAREX DIPANDU FF MUSLIM LAPOR KELUAR KE MAIN GATE 1 UNTUK MENGAMBIL ANGGOTA DALAM KEADAAN BAIK.

19:28

STAREX LAPOR SAMPAI DALAM KEADAAN BAIK.

20:00

SAYA RO LUTHMAN HAKIM BIN HARUN SERAH TUGAS OCC KEPADA RO PASUKAN ALPHA DALAM KEADAAN BAIK.

Verification

Check by : Mohd Lutman Hakim Bin Harun Verify by : SFM Suhaimi Bin Kassiron