MAIN FIRE STATION OCCURRENCE REPORT

Shift Shift Cycle Date Emergency Drill
ALPHA MFS Night July 21, 2025 35 27

Shift Manning

Name Vehicle
SFM Mohd Norrustam Bin Zakaria RIV2
Muhammad Nurhafizy Bin Jalani RIV2
Muhammad Amirul Hafiz Bin Abu Bakar Sidek RIV2
Muhammad Nurhalis Syafiq Bin Mohamad Nizu MRV1
Muhammad Fakhrul Razin bin Shamsudin FT1
Mohamad Nazroul Bin Nazari FT2
Muhammad Danial Bin Muhsain FT3
Mohd Hasif Bin Salami FT4
Raja Mohamad Nazmi bin Raja Nazarudin PM1
Mohd Haziq Bin Mohd Din HZ1
Muhammad Shukran Hakim bin Bakar TTL
Wan Ahmad Ihsanuddin Bin Zakaria -

Staff On Leave

Name Leave Type
FM Mohd Fakhrullah Bin Mohd Hatta Hospitalization Leave
Ahmad Zul Fahmi Bin Abbas Paternity Leave
Mohammad Afiq Bin Shahrom Annual Leave
Mohd Fikry Bin Mat Nor Sick Leave

Occurrence Book Entry

Time Remarks
20:00

SAYA OCC OPERATOR IHSAN TERIMA TUGASAN OCC DARI OCC OPERATOR ISZUAN DALAM KEADAAN BAIK DAN TERKAWAL.

21:04

FORD LAPOR DIPANDU FF AMIRUL LAPOR KELUAR KE SG RENGIT UNTUK TUGASAN KHAS.

21:12

RIV 2 LAPOR DIPANDU FM NURHAFIZY LAPOR KELUAR MEMBUAT UJIAN JENTERA DISEKITAR BALAI.

21:31

RIV 2 DIPANDU FM NURHAFIZY LAPOR SELESAI UJIAN JENTERA DAN SELAMAT TIBA DI BALAI.

21:45

FORD DIPANDU FF AMIRUL LAPOR SELESAI TUGASAN KHAS DAN SELAMAT TIBA DIBALAI.

22:30

EMERGENCY DRILL REPORT
RIM SEAL FIRE (TANK FIRE)
DRILL NUMBER: MD/28/2025
DATE: 21/07/2025
TIME: 2230HRS
LOCATION: SR NAPHTA TANK (AREA 3B)
OPC INVOLVED: PREFCHEM
SENIOR FIRE MARSHAL: MR. M. NORRUSTAM ZAKARIA
SHIFT: ALPHA MFS
CALLER: MR. ABD HADI (RSM)

OCC RECEIVED A CALL FROM RSM MR. ABDUL HADI INFORMING THAT THERE WAS AN EMERGENCY RIM SEAL FIRE AT SR NAPHTA TANK A. NO IP INFORMED.

22:31

OCC ACTIVATED CEFS PIC TEAM FROM MAIN STATION, MEDIC BRAVO, AND PSCC TO RESPOND TO THE LOCATION.

22:32

MARSHAL-1 REPORTED RIV 2, MRV 1, FT 1, FT 2, FT 3, FT 4,TTL 1,HZT 1 AND PFDS DEPLOYED TO THE LOCATION.

22:32

OCC INFORM THAT WIND DIRECTION IS FROM SOUTH TO NORTH AND WIND SPEED WAS 5.9 KM/H. OCC INFORM TANK SPECIFICATION AND PRODUCT INFORMATION TO MARSHALL-1.

22:36

MARSHAL-1 REPORTED CEFS PIC TEAM ARRIVED AT SR NAPHTA TANK A.

22:37

MARSHAL-1 CONFIRM THAT THERE IS RIM SEAL FIRE AT SR NAPHTA TANK A, ERT TEAM ALREADY DEPLOY WATER CURTAIN AND CEFS TEAM START TO SIZE UP.

22:41

OCC INFORMED FOAM CONCENTRATE CALCULATION FOR RIM SEAL FIRE IS 150 LITER FOR 20 MINUTES.

22:42

MARSHAL-1 REPORTED CEFS TEAM USING FT 3 TO INJECT FOAM AT FOAM LINE AND TTL FOR COOLING AND OBSERVATION.

22:43

MARSHAL- 1 REPORTED THAT THE FT 2 IS CONDUCTING COOLING OPERATIONS BETWEEN TANKS TO PREVENT HEAT TRANSFER.

22:44

MARSHAL-1 REPORTED FT 3 TO DISCHARGE FOAM SOLUTION FOR 20 MINUTES.

22:45

MARSHAL-1 REPORTED TTL DOING TANK COOLING AND MONITOR THE RIM SEAL FIRE.

22:52

MARSHAL-1 REPORTED TTL TO CONTINUE COOLING PROCESS AND INCREASING THE WATER PRESSURE.

22:58

MARSHAL-1 REPORTED CEFS TEAM SUCCESFULLY EXTINGUISH THE FIRE AND CONDUCTING OVERHAUL SURROUNDING THE TANK AND RIM SEAL.

22:59

MARSHAL-1 REQUESTED THE OSC TO CHECK THE TANK TEMPERATURE THROUGH THE PANEL TO OBTAIN READINGS FROM THE LINEAR HEAT DETECTOR (LHD).

23:00

FM-1 REPORTED TEMPERATURE IS NORMAL AND OVERHAUL COMPLETE.

23:01

OSC REPORTED THAT ALL READINGS FROM THE PANEL HAVE RETURNED TO NORMAL CONDITION.

23:03

OSC DECLARED OPERATION STAND DOWN.

23:22

MARSHAL-1 REPORTED ALL VEHICLES ENROUTE TO MAIN FIRE STATION.

23:27

ALL VEHICLES SAFELY RETURNED TO MAIN FIRE STATION.

06:30

ANGGOTA BERTUGAS MEMBUAT HOUSEKEEPING DISEKITAR ENGINE BAY DAN BALAI.

07:30

ANGGOTA BERTUGAS BERKUMPUL DI JENTERA BAGI SERAHAN TUGAS.

08:00

SAYA OCC OPERATOR IHSAN SERAH TUGAS OCC KEPADA OCC OPERATOR

Verification

Check by : Wan Ahmad Ihsanuddin Bin Zakaria Verify by : SFM Mohd Norrustam Bin Zakaria
Norrustam