MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Night | July 11, 2025 | 32 | 24 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Sharul Azuary Bin Mohamed Isa | RIV2 |
| FM Muhammad Yazid bin Abd Rahman | RIV2 |
| Nur Muhammad Amirull Bin Ahmad Faiza | MRV1 |
| Abdul Aidil Akram Bin Abdul Rahman | MRV1 |
| Muhammad Khuzairi Bin Jaafar | FT1 |
| Ezad Ariff Bin Jamaluddin | FT2 |
| Mohd Sahril Bin Yakub | FT3 |
| Muhammad Fakhrul Razin bin Shamsudin | FT4 |
| Mohamad Sufian Bin Mohd Lazi | HZ1 |
| Mohd Haziq Bin Mohd Din | PM1 |
| Muhammad Syazwan bin Ibrahim | TTL |
| Mohd Norhafiz Bin Yusoff | FT4 |
| Muhammad Habibul Asyraf Bin Burhan | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Hafizuddin Bin Ngah | Annual Leave |
| SFM Haizad Bin Hasan | Annual Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO 32037 HABIBUL TERIMA TUGAS OCC DARIPADA RO 32111 NAZMI DALAM KEADAAN BAIK DAN TERKAWAL. |
| 20:05 | OCC LAPOR TUGAS KEPADA RSM,CSM DAN USM SETERUSNYA ANGGOTA UJIAN RADIO KEPADA OCC DENGAN BAIK DAN JELAS. |
| 20:25 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PEMERIKSAAN JENTERA DAN PERALATAN OPERASI DIKAWASAN BALAI MAIN DENGAN TERKAWAL. |
| 20:44 | FORD RANGER OPERATION DIPANDU AMIRUL KE SUNGAI RENGIT TUJUAN MEMBELI MAKANAN ANGGOTA BERTUGAS. |
| 21:15 | EMERGENCY REPORT OCC RECEIVED A CALL FROM EN. SHAMSUL (PS 3B), INFORMING THAT THERE WERE BEE NEST AT PROCESSS AREA 5150-T-009A (CCN Tank). |
| 21:16 | OCC ACTIVATED THE CEFS TEAM TO RESPOND TO THE INCIDENT AREA. |
| 21:17 | FM-1 REPORTED 4 CEFS PERSONNEL WITH EMERGENCY VEHICLES (RIV2 AND MRV1) TO THE LOCATION. |
| 21:23 | FM-1 REPORTED ARRIVED AT THE INCIDENT AREA. |
| 21:24 | FM-1 CONFIRMED THAT THE BEE NEST WAS HANGING UNDER PERMANENT STEP LADDER, WITH AN ESTIMATED SIZE OF 1ft X 1ft. |
| 21:25 | FM-1 REPORTED SETUP OF 2 RESPONDERS COMPLETED WITH BEE SUITS AND 2 BAYGON SPRAYS. |
| 21:27 | FM-1 REPORTED OPERATION TO REMOVE BEE NEST BEGINS. |
| 21:29 | M-1 REPORTED THE BEE NEST WAS SUCCESSFULLY DESTROYED AND THE AREA IS SAFE. |
| 21:30 | FM-1 REPORTED THAT OVERHAUL PROCEDURES IS ON GOING. |
| 21:32 | FM-1 DECLARED OPERATION STAND DOWN. |
| 21:35 | CEFS TEAM RETURNED TO THE MAIN FIRE STATION. RIV2 DIPANDU AMIRUL BERSAMA FM1 KE RC SITE TUJUAN FSP |
| 21:44 | CEFS TEAM SAFELY ARRIVED AT THE MAIN FIRE STATION. |
| 21:47 | RIV2 DIPANDU AMIRUL BERSAMA FM1 TIBA DI BALAI. |
| 22:00 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI TEORI DI TRAINING ROOM. |
| 22:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PRAKTIKAL DI ENGINE BAY. |
| 06:30 | ANGGOTA BERTUGAS MELAKUKAN KEKEMASAN BALAI DAN JENTERA. |
| 07:30 | ANGGOTA BERTUGAS MELAKUKAN AKTIVITI PENYERAHAN TUGAS KEPADA ANGGOTA SHIFT BRAVO BAIK ADANYA. |
| 08:00 | SAYA RO 32037 HABIBUL SERAH TUGAS OCC KEPADA RO PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Muhammad Habibul Asyraf Bin Burhan | Verify by : SFM Sharul Azuary Bin Mohamed Isa |
|---|---|
![]() |
sharulazuary |
