MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Night | June 25, 2025 | 30 | 21 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Haizad Bin Hasan | RIV2 |
| FM Mohammad Ridzuan Bin Abdul Jabbar | RIV2 |
| Muhammad Fakhrul Razin bin Shamsudin | MRV1 |
| Abdul Aidil Akram Bin Abdul Rahman | MRV1 |
| Mohamad Sufian Bin Mohd Lazi | FT1 |
| Muhammad Syazwan bin Ibrahim | FT1 |
| Hafizuddin Bin Ngah | FT2 |
| Muhammad Khuzairi Bin Jaafar | FT3 |
| Ezad Ariff Bin Jamaluddin | FT4 |
| Nur Muhammad Amirull Bin Ahmad Faiza | FT4 |
| Muhammad Habibul Asyraf Bin Burhan | PM1 |
| Mohd Norhafiz Bin Yusoff | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| FM Muhammad Yazid bin Abd Rahman | Annual Leave |
| Mohd Sahril Bin Yakub | Annual Leave |
| Mohd Haziq Bin Mohd Din | Paternity Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO HAFIZ (32065) TERIMA TUGAS OCC DARI PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL |
| 20:05 | OCC LAPOR KEKUATAN ANGGOTA DAN JETERA KE RSM,CSM DAN USM DALAM KEADAAN BAIK |
| 20:10 | OCC MEMBUAT UJIAN DTRS KE SEMUA ANGGOTA DALAM KEADAAN BAIK |
| 20:20 | SEMUA ANGGOTA BERTUGAS MELAKUKAN PEMERIKSAAN PERALATAN DAN JENTERA DALAM KEADAAN BAIK |
| 20:30 | KB-1 DIPANDU FF HABIBUL LAPOR KELUAR MEMBUAT UJIAN PEMANDUAN DI SEKITAR NON-PROSES AREA |
| 20:40 | KB-1 LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK |
| 20:41 | EMERGENCY REPORT 2041 HRS: OCC ACTIVATED THE CEFS TEAM TO RESPOND TO THE INCIDENT AREA. 2042 HRS: FM-1 REPORTED DEPLOYMENT OF 4 CEFS PERSONNEL WITH EMERGENCY VEHICLE MRV1 AND RIV2 TO LOCATION. 2045 HRS: CEFS TEAM ARRIVAL AT THE LOCATION OF THE BEE NEST AND PERFORMING SIZE UP PROSEDURE. 2047 HRS: BEE NEST LOCATED AT PLATFORM LADDER, ESTIMATED SIZE ONE FEET WIDTH X ONE FEET HEIGHT. 2048 HRS: SETUP OF 2 RESPONDERS IN FULL BEE SUITS WITH 2 BAYGON SPRAYS. 2100 HRS: OPERATION TO REMOVE THE BEE NEST COMMENCED. 2110 HRS: BEE NEST SUCCESSFULLY DESTROYED; AREA DECLARED SAFE. 2115 HRS: OVERHAUL PROCEDURES INITIATED. 2120 HRS: OPERATION STAND DOWN DECLARED. 2125 HRS: CEFS TEAM RETURNED TO MFS. 2130 HRS: CEFS TEAM SAFELY ARRIVED AT MAIN FIRE STATION. |
| 21:00 | STAREX DIPANDU FF SUFIAN LAPOR KELUAR KE SUNGAI RENGIT UNTUK KERJA-KERJA KHAS |
| 21:35 | STAREX LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK |
| 22:00 | SEMUA ANGGOTA BERTUGAS BERKUMPUL DI BILIK TRAINING UNTUK TEORI AKTIVITI DIKETUAI SFM HAIZAD |
| 22:44 | EMERGENCY DRILL REPORT 2244HRS: OCC RECEIVED A CALL FROM RSM DARZIMAN VIA BASED RADIO REGARDING OIL SPILL AT UNIT 1230 (KHT). 2245 HRS: OCC ACTIVATED CERT.CEFS MFS, MEDIC BRAVO AND PSCC. 2245HRS: MARSHALL 1 REPORTED CEFS TEAM DEPLOYED TO THE LOCATION. 2247 HRS: OCC REPORTED CURRENT WIND DERECTION IS HEADING FROM SOUTH TO NORTH AND WIND SPEED 5.9KM/H. 2248 HRS: MARSHALL 1 REPORTED INFORMED BACK UP HZ2 TO DEPLOYED TO THE LOCATION. 2250 HRS: MARSHALL 1 REPORTED CEFS MFS ARRIVED AT THE LOCATION. 2251 HRS: MARSHALL 1 REPORTED CEFS TEAM PERFORMING SIZE-UP ACTIVITY AND CONFIRMED THERE WAS A LEAK PRODUCT WILD NAPHTHA AT PUMP 1230. 2252 HRS: MEDIC 01 AND MEDIC 03 REPORTED DEPLOYED TO LOCATION. 2254 HRS: MARSHALL 1 REPORTED CEFS TEAM USING FIXED MONITOR FOR RAIN DOWN METHOD AT EFFECTED AREA. 2255 HRS: MARSHALL 1 REPORTED CEFS TEAM ACTIVATED 2X FIXED MONITOR 2256 HRS: MARSHALL 1 REPORTED CEFS TEAM SET UP 1X ATTACKING HOSE 100 FEET WITH 2X NOZZLE. 2256 HRS: MARSHALL 1 REPORTED HZ2 ARRIVED AT THE LOCATION. 2257 HRS: MEDIC 01 REPORTED ARRIVED AT LOCATION 2258 HRS: MARSHALL 1 REPORTED DISTRIBUTED CONTROL SYSTEM ALREADY SHUT DOWN BY PANELMAN. 2300 HRS: MARSHALL 1 REPORTED CEFS TEAM USE OIL BOOM TO CONTAIN THE SPILAGE AT THE LOCATION. 2308 HRS: MARSHALL 1 REPORTED 6 CEFS PERSONNEL AND 2 ERT TEAM DOING SEARCH AND RESCUE PROCEDURE AT LOCATION. 2310 HRS: MARSHALL 1 REPORTED CEFS TEAM WAS SUCCESSFULLY FIND 1X IP AT LOCATION AND EVACUATE AT SAFE ZONE. 2311 HRS: MARSHALL 1 REPORTED CEFS TEAM PERFORM DECONTAMINATION FOR IP BEFORE HAND OVER TO MEDIC TEAM FOR FURTHER ACTION. 2312 HRS: MARSHALL 1 REPORTED 2 CEFS PERSONNEL AND 2 ERT PERSONNEL READY FOR OVERHAUL PROCEDURE ACTIVITY AND ISOLATE THE VALVE PUMP 003. 2314 HRS: MARSHALL 1 REPORTED 2 CEFS PERSONNEL AND 2 ERT PERSONNEL PERFORM OVERHAUL PROCEDURE ACTIVITY. 2318 HRS: MARSHALL 1 REPORTED LEL 0%, H2S 0% AND SITUATION BACK TO NORMAL. 2323 HRS: OSC DECLARE OPERATION STAND DOWN. 2335 HRS: MARSHALL 1 REPORT CEFS PERSONNEL AND EMERGENCY VEHICLE DEPLOY BACK TO FIRE STATION 2346 HRS: MARSHALL 1 REPORT CEFS PERSONNEL AND EMERGENCY VEHICLE SAFELY ARRIVED AT FIRE STATION |
| 00:15 | SEMUA ANGGOTA BERTUGAS MELAKUKAN PEMBERSIHAN JENTERA DAN PERALATAN SELEPAS SELESAI PENGGUNAAN SEMASA DRILL |
| 06:00 | SEMUA ANGGOTA BERTUGAS MELAKUKAN PEMBERSIHAN SEKITAR BALAI DALAM KEADAAN BAIK |
| 07:10 | STAREX DIPANDU FF SUFIAN LAPOR KELUAR KE GATE-1 UNTUK MENGAMBIL ANGGOTA |
| 07:30 | STAREX LAPOR SELAMAT TIBA DI BALAI DALAM KEADAAN BAIK |
| 08:00 | SAYA RO HAFIZ (32065) SERAH TUGAS OCC KE PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Mohd Norhafiz Bin Yusoff | Verify by : SFM Haizad Bin Hasan |
|---|---|
![]() |
Haizad |
