MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| BRAVO MFS | Night | June 13, 2025 | 28 | 18 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Mohamad Imran Bin Jamaludin | RIV2 |
| FM Mohammad Adib Syahmi Bin Amri | RIV2 |
| Ahmad Tarmisham Bin Othman | MRV1 |
| Khairul Hafiz Bin Eddy Arifin | MRV1 |
| Muhammad Salihin bin Marasip | FT1 |
| Muhammad Iszuan Bin Suhadi | FT2 |
| Fathul Imran Bin Dol Malek | FT3 |
| Muhammad Syamil Bin Samad | FT4 |
| Mohd Lutman Hakim Bin Harun | HZ1 |
| Mohd Hazeem Bin Abdul Halim | TTL |
| Mohammad Ain Nur-Muslim Bin Tarli | PM1 |
| Mohd Khairihizmi bin Ibrahim | HZ1 |
| Muhammad Arief Izzuddin Bin Shokry | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Mohd Irwan Syah Bin Rohaizan | Annual Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:00 | SAYA RO 32067 M ARIEF TERIMA TUGAS OCC DARIPADA PASUKAN CHARLIE DALAM KEADAAN BAIK. |
| 20:05 | OCC MELAPORKAN KEANGGOTAAN BERTUGAS KEPADA RSM, USM DAN CSM DALAM KEADAAN BAIK. |
| 20:20 | SFM, FM DAN SEMUA ANGGOTA MELAKUKAN UJIAN DTRS KEPADA OCC DITERIMA DALAM KEADAAN BAIK. |
| 20:30 | SEMUA ANGGOTA MELAKUKAN UJIAN DAN PEMERIKSAAN PERALATAN DAN JENTERA OPERASI DALAM KEADAAN BAIK. |
| 20:46 | HZT1 LAPOR KELUAR MELAKUKAN UJIAN PERJALANAN DIKAWASAN NON-PROCESS DALAM KEADAAN BAIK. |
| 20:53 | HZT1 LAPOR SAMPAI DI BALAI DALAM KEADAAN BAIK. |
| 21:05 | STAREX DIPANDU FF HIZMI LAPOR KELUAR KE SUNGAI RENGIT TUJUAN TUGAS-TUGAS KHAS. |
| 21:34 | EMERGENCY REPORT 2134 HRS: OCC ACTIVATED THE CEFS TEAM TO RESPOND. 2134 HRS: FM-1 REPORTED DEPLOYMENT OF 3 CEFS PERSONNEL WITH EMERGENCY VEHICLE MRV1. 2144 HRS: CEFS TEAM ARRIVED AT THE INCIDENT SITE AND BEGAN SIZE-UP PROCEDURE. 2151 HRS: BEE NEST LOCATED AT PIPE RACK STRUCTURE NEAR CLEAR TANK, ESTIMATED SIZE ¾ FT X ¾ FT. 2153 HRS: SETUP OF 2 RESPONDERS IN FULL BEE SUITS WITH 2 BAYGON SPRAYS. 2158 HRS: OPERATION TO REMOVE THE BEE NEST COMMENCED. 2200 HRS: BEE NEST SUCCESSFULLY DESTROYED; AREA DECLARED SAFE. 2202 HRS: OVERHAUL PROCEDURES INITIATED. 2204 HRS: OPERATION STAND DOWN DECLARED. 2206 HRS: CEFS TEAM RETURNED TO PIC AND REDEPLOYED TO PCP. |
| 22:06 | EMERGENCY REPORT 2206 HRS: OCC ACTIVATED THE CEFS TEAM TO RESPOND TO THE INCIDENT AREA. 2206 HRS: FM-1 REPORTED DEPLOYMENT OF 3 CEFS PERSONNEL WITH EMERGENCY VEHICLE MRV1 FROM PT2SB AFTER DESTROY BEEHIVE (REFER ME 27/2025 SPECIAL ASSISTANT). 2213 HRS: CEFS TEAM ARRIVAL AT THE LOCATION OF THE BEE NEST AND PERFORMING SIZE UP PROSEDURE. 2221 HRS: BEE NEST LOCATED AT PLATFORM LEVEL 7 (UNIT PYGAS), ESTIMATED SIZE ¾ FT X ¾ FT. 2222 HRS: SETUP OF 2 RESPONDERS IN FULL BEE SUITS WITH 2 BAYGON SPRAYS. 2224 HRS: OPERATION TO REMOVE THE BEE NEST COMMENCED. 2226 HRS: BEE NEST SUCCESSFULLY DESTROYED; AREA DECLARED SAFE. 2227 HRS: OVERHAUL PROCEDURES INITIATED. 2229 HRS: OPERATION STAND DOWN DECLARED. 2233 HRS: CEFS TEAM RETURNED TO MFS. 2236 HRS: CEFS TEAM SAFELY ARRIVED AT MAIN FIRE STATION. |
| 22:40 | STAREX LAPOR SAMPAI DI BALAI DALAM KEADAAN BAIK. |
| 23:00 | SEMUA ANGGOTA TERLIBAT DENGAN AKTIVITI KELAS DAN PRAKTIKAL DALAM KEADAAN BAIK. |
| 06:00 | SEMUA ANGGOTA TERLIBAT DENGAN AKTIVITI HOUSEKEEPING KAWASAN BALAI DAN JENTERA DALAM KEADAAN BAIK. |
| 07:10 | STAREX DIPANDU FF MUSLIM LAPOR KE GATE 1 UNTUK MENGAMBIL ANGGOTA DALAM KEADAAN BAIK. |
| 07:30 | SEMUA PEMANDU JENTERA OPERASI MELAKUKAN JOIN INSPACTION BERSAMA PASUKAN DELTA. |
| 07:45 | STAREX DIPANDU FF MUSLIM SELESAI MENGAMBIL ANGGOTA DI GATE 1 DAN LAPOR SAMPAI DI BALAI DALAM KEADAAN BAIK. |
| 08:00 | SAYA RO 32067 M ARIEF SERAH TUGAS OCC KEPADA RO PASUKAN DELTA DALAM KEADAAN YANG BAIK. |
Verification
| Check by : Muhammad Arief Izzuddin Bin Shokry | Verify by : SFM Mohamad Imran Bin Jamaludin |
|---|---|
| MARIEF | ![]() |
